Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $3,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 6.00 | MTH |
6.00
| 6.00 | 0.00 | $500.00 | $0.00 |
3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
4 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) | 35,000.00 | AL |
32,504.00
| 32,504.00 | 0.00 | $1.00 | $0.00 |
5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,600.00 | $0.00 |
6 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $7,000.00 | $0.00 |
7 | OFFICE FACILITIES | 6.00 | MTH |
6.00
| 6.00 | 0.00 | $4,000.00 | $0.00 |
8 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $110,000.00 | $0.00 |
9 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") | 65,340.00 | SF |
70,807.00
| 70,807.00 | 0.00 | $0.39 | $0.00 |
10 | AC PAVEMENT(SURFACE COURSE) | 790.00 | TON |
1,075.26
| 1,075.26 | 0.00 | $147.00 | $0.00 |
11 | TRENCH BACKFILL SLURRY (CLASS 140-S-100) | 2,113.00 | CY |
2,113.00
| 2,113.00 | 0.00 | $104.00 | $0.00 |
12 | 12" WATERMAIN, 0.25" THICK STEEL, CML&C | 35.00 | LF |
37.00
| 37.00 | 0.00 | $184.00 | $0.00 |
13 | 24" WATERMAIN, 0.25" THICK STEEL, CML&C, WELDED | 5,331.00 | LF |
5,333.00
| 5,333.00 | 0.00 | $274.00 | $0.00 |
14 | 36" STEEL CASING | 83.00 | LF |
79.00
| 79.00 | 0.00 | $570.00 | $0.00 |
15 | AIR RELEASE AND VACUUM VALVE ASSEMBLY, 4" | 4.00 | EA |
4.00
| 4.00 | 0.00 | $11,400.00 | $0.00 |
16 | BUTTERFLY VALVE, 150 PSI WWP, 24" | 4.00 | EA |
4.00
| 4.00 | 0.00 | $9,400.00 | $0.00 |
17 | GATE VALVE, 200 PSI WWP, 12" | 5.00 | EA |
5.00
| 5.00 | 0.00 | $3,500.00 | $0.00 |
18 | PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A | 5.00 | EA |
5.00
| 5.00 | 0.00 | $5,300.00 | $0.00 |
19 | INTERCONNECTION TO EXISTING WATERMAIN | 3.00 | EA |
3.00
| 3.00 | 0.00 | $15,500.00 | $0.00 |
20 | CATHODIC PROTECTION ANODE AND TEST STATION | 4.00 | EA |
4.00
| 4.00 | 0.00 | $5,200.00 | $0.00 |
21 | VIDEO INSPECTION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
22 | TRAFFIC CONTROL - STAGE 1 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
23 | TRAFFIC CONTROL - STAGE 2 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
24 | TRAFFIC CONTROL - STAGE 3 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
25 | TRAFFIC CONTROL - STAGE 4 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
26 | CHANGEABLE MESSAGE SIGN | 4.00 | EA |
4.00
| 4.00 | 0.00 | $9,800.00 | $0.00 |
27 | FLASHING ARROW SIGN | 4.00 | EA |
4.00
| 4.00 | 0.00 | $2,360.00 | $0.00 |
28 | JOBS COORDINATOR (ALLOWANCE OF $10,000) | 10,000.00 | AL |
15,812.50
| 14,312.50 | 1,500.00 | $1.00 | $1,500.00 |
S-1 | EXTEND NTP 1 PERIOD | | LS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
S-2 | UNMARKED UTILITY DELAY STA. 12+05 | | T&M |
3,446.90
| 3,446.90 | 0.00 | $1.00 | $0.00 |
S-3 | DELAY - UNMARKED STORM DRAIN STA. 26+70 | | T&M |
5,594.77
| 5,594.77 | 0.00 | $1.00 | $0.00 |
S-4 | UTILITY DELAY AT STA. 10+92 | | T&M |
3,698.14
| 3,698.14 | 0.00 | $1.00 | $0.00 |
S-5 | MODIFY AIR VAC LATERAL - UTILITY INTERFERENCE STA. 10+92 | | LS |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
S-6 | DESIGN CHANGE AT STA. 36+75 DUE TO SCE LINE CONFLICT | | LS |
1.00
| 1.00 | 0.00 | $22,000.00 | $0.00 |
S-7 | DELAY - UNMARKED STORM DRAIN STA. 38+81 | | T&M |
4,884.03
| 4,884.03 | 0.00 | $1.00 | $0.00 |
S-8 | DELAY - UNMARKED STORM DRAIN STA. 38+81 | | T&M |
5,294.96
| 5,294.96 | 0.00 | $1.00 | $0.00 |
S-9 | DELAY - MIS-MARKED UTILITIY STA. 52+00 | | LS |
1.00
| 1.00 | 0.00 | $12,000.00 | $0.00 |
S-10 | POTHOLE EXISTING SERVICE LINES | | LS |
1.00
| 1.00 | 0.00 | $5,900.00 | $0.00 |
S-11 | DELAY - CONFLICTING GAS LINE STA. 37+50 | | T&M |
2,641.47
| 2,641.47 | 0.00 | $1.00 | $0.00 |
S-12 | MODIFY AIR/VAC LATERAL AT STA. 37+50 | | LS |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
S-13 | DELAY - CONFLICTING WATER & GAS LINES STA. 24+87 | | T&M |
2,606.23
| 2,606.23 | 0.00 | $1.00 | $0.00 |
S-14 | MODIFY AIR/VAC LATERAL AT STA. 24+87 | | LS |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
S-15 | DELAY - UNMARKED STORM DRAIN STA. 63+00 | | T&M |
10,227.22
| 10,227.22 | 0.00 | $1.00 | $0.00 |
S-16 | DELAY - UTILITY CONFLICT AT STA. 62+01 | | T&M |
3,116.84
| 3,116.84 | 0.00 | $1.00 | $0.00 |
S-17 | MODIFY AIR/VAC LATERAL AT STA. 62+01 | | LS |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
S-18 | HOT TAP EXISTING 12" DUCTILE MAIN | | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
S-19 | REPAIR 4" DAMAGED CONDUITS | | LS |
1.00
| 1.00 | 0.00 | $1,200.00 | $0.00 |
S-20 | REMOVE & REINSTALL 24" WATER MAIN SECTION FOR INTERCONNECTION 1 | | LS |
1.00
| 1.00 | 0.00 | $19,000.00 | $0.00 |
S-21 | NON-WORKING DAYS | | NWD |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
|