Item |
Description |
Unit of Measure |
Estimated Quantity |
1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
3 |
3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
6 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
7 |
OFFICE FACILITIES |
MTH |
4 |
8 |
MOBILIZATION |
LS |
1 |
9 |
CLEARING AND GRUBBING |
LS |
1 |
10 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
100 |
11 |
UNCLASSIFIED EXCAVATION |
CY |
549 |
12 |
DRAINAGE GEOTEXTILE |
SY |
1 |
13 |
CRUSHED MISCELLANEOUS BASE |
CY |
319 |
14 |
TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
CY |
17 |
15 |
COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
SF |
425,462 |
16 |
COLD MILL AC PAVEMENT (> 3") |
SF |
1,240 |
17 |
AC PAVEMENT |
TON |
107 |
18 |
AC PAVEMENT(PATCH BACK) |
TON |
34 |
19 |
AC PAVEMENT(LEVELING COURSE) |
TON |
1,973 |
20 |
RECONSTRUCT MANHOLE |
EA |
1 |
21 |
DOUBLE ADJUST MANHOLE |
EA |
5 |
22 |
CLEAN AND PAINT EXISTING MANHOLE |
LS |
1 |
23 |
PCC PAVEMENT |
CY |
48 |
24 |
ASPHALT RUBBER HOT MIX |
TON |
3,454 |
25 |
ASPHALT RUBBER HOT MIX (TEST STRIP) |
TON |
500 |
26 |
DRILL AND BOND DOWEL |
LF |
190 |
27 |
CONNECTION TO EXISTING CATCH BASIN |
EA |
1 |
28 |
REINFORCED CONCRETE RETAINING WALL TYPE 7 |
CY |
15 |
29 |
CONCRETE SLOUGH WALL |
CY |
1 |
30 |
PCC CURB, TYPE A1-8 |
LF |
26 |
31 |
PCC CURB, TYPE A1-VAR |
LF |
138 |
32 |
PCC CURB & GUTTER, TYPE A2-6 |
LF |
15 |
33 |
PCC CURB & GUTTER, TYPE A2-8 |
LF |
46 |
34 |
PCC CURB & GUTTER, TYPE A2-VAR |
LF |
204 |
35 |
PCC WALK & DRIVEWAYS, 4" THICK |
SF |
2,071 |
36 |
PCC CURB RAMPS |
CY |
30 |
37 |
DETECTABLE WARNING SURFACE |
SF |
187 |
38 |
DETECTABLE WARNING SURFACE (CULVER CITY) |
SF |
15 |
39 |
CROSS GUTTER |
CY |
77 |
40 |
COMPOSITE TYPE 2 PULL BOX INCL COVER |
EA |
1 |
41 |
COMPOSITE TYPE 3 PULL BOX INCL COVER |
EA |
8 |
42 |
2" CONDUIT (SCH 80 PVC) |
LF |
115 |
43 |
3" CONDUIT (SCH 80 PVC) |
LF |
50 |
44 |
2-PAIR DETECTOR LEAD-IN CABLE |
LF |
1,315 |
45 |
INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
LF |
2,014 |
46 |
DETAIL 9 (THERMOPLASTIC) |
LF |
13,095 |
47 |
DETAIL 22 (THERMOPLASTIC) |
LF |
2,330 |
48 |
DETAIL 29 (THERMOPLASTIC) |
LF |
1,712 |
49 |
DETAIL 32 (THERMOPLASTIC) |
LF |
1,226 |
50 |
DETAIL 37B (THERMOPLASTIC) |
LF |
1,443 |
51 |
DETAIL 38 (THERMOPLASTIC) |
LF |
2,408 |
52 |
DETAIL 40 (THERMOPLASTIC) |
LF |
656 |
53 |
DETAIL 41 (THERMOPLASTIC) |
LF |
126 |
54 |
PAVEMENT MARKINGS (THERMOPLASTIC) |
SF |
4,990 |
55 |
6" STRIPING (THERMOPLASTIC) |
LF |
3,013 |
56 |
12" STRIPING (THERMOPLASTIC) |
LF |
620 |
57 |
REMOVE STRIPING AND MARKINGS (THERMOPLASTIC) |
SF |
381 |
58 |
INSTALL FIRE HYDRANT LOCATION RPM |
EA |
11 |
59 |
SIGN POST (ROADSIDE SIGN) |
EA |
2 |
60 |
SIGN PANEL |
EA |
2 |
61 |
TRAFFIC CONTROL |
LS |
1 |
62 |
FLASHING ARROW SIGN |
EA |
6 |
63 |
CHANGEABLE MESSAGE SIGN |
EA |
7 |
64 |
#2 CONCRETE AGGREGATE |
CY |
2 |
65 |
TEMPORARY FENCING |
LF |
80 |
66 |
6" PVC PIPE (SCH 80) |
LF |
8 |
67 |
6" PVC SCH 80 PERFORATED PIPE |
LF |
40 |
68 |
CONSTRUCT AND REMOVE SILT FENCE |
LF |
60 |
69 |
CAST IN PLACE CONCRETE TROUGH |
CY |
1 |
70 |
GABION CHECK DAM WITH COBBLE INFILL |
LF |
12 |
71 |
FORMED STEEL TROUGH AND NARROW SLOT TRENCH GRATE WITH FRAME |
EA |
1 |
72 |
STAINLESS STEEL DEBRIS MESH AND FRAME |
EA |
1 |
73 |
CLASS D BIOSWALE MIX |
CY |
18 |
74 |
FURNISH AND PLANT 5 GALLON SHRUBS |
EA |
6 |
75 |
FURNISH AND PLANT 1 GALLON SHRUB |
EA |
42 |
76 |
90 DAY PLANT ESTABLISHMENT PERIOD |
LS |
1 |