Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) |
0.10
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.15
| 3 | MTH | $500.00 | $500.00 |
$1,500.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.10
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
0.63
| 1 | LS | $7,000.00 | $6,115.00 |
$6,115.00
| $18,858.75 | $16,885.00 |
001.07.021 | SHORING OF OPEN EXCAVATIONS |
3.77
| 1 | LS | $26,000.00 | $36,800.00 |
$36,800.00
| $55,447.50 | $60,900.00 |
001.08.005 | OFFICE FACILITIES |
0.05
| 3 | MTH | $4,000.00 | $150.00 |
$450.00
| $5,237.50 | $4,050.00 |
001.09.003 | MOBILIZATION |
5.99
| 1 | LS | $20,000.00 | $58,400.00 |
$58,400.00
| $59,656.25 | $59,200.00 |
300.01.003 | CLEARING AND GRUBBING |
0.10
| 1 | LS | $10,000.00 | $1,000.00 |
$1,000.00
| $11,527.50 | $7,555.00 |
300.01.013 | TREE REMOVAL (6"-12" DIAMETER) |
0.24
| 1 | EA | $1,000.00 | $2,360.00 |
$2,360.00
| $3,312.50 | $3,500.00 |
300.01.057 | REMOVE EXISTING CHAIN LINK FENCE |
0.17
| 140 | LF | $20.00 | $11.83 |
$1,656.20
| $18.53 | $16.57 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
0.48
| 12 | CY | $200.00 | $393.90 |
$4,726.80
| $445.98 | $446.95 |
300.01.067 | CONCRETE REMOVAL (REINFORCED) |
0.25
| 3 | CY | $1,000.00 | $824.90 |
$2,474.70
| $863.73 | $912.45 |
300.02.003 | UNCLASSIFIED EXCAVATION |
6.18
| 281 | CY | $100.00 | $214.45 |
$60,260.45
| $194.93 | $219.23 |
300.02.003 | UNCLASSIFIED EXCAVATION |
2.25
| 81 | CY | $100.00 | $270.95 |
$21,946.95
| $194.93 | $219.23 |
300.05.002 | IMPORTED BORROW |
0.41
| 16 | CY | $100.00 | $247.70 |
$3,963.20
| $270.43 | $260.85 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
3.30
| 155 | CY | $75.00 | $207.35 |
$32,139.25
| $168.59 | $158.68 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
1.03
| 3 | CY | $500.00 | $3,362.00 |
$10,086.00
| $1,341.25 | $850.00 |
302.04.009 | MICROSURFACING (TYPE II) |
18.17
| 687 | TON | $175.00 | $258.00 |
$177,246.00
| $246.75 | $251.00 |
302.05.007 | AC CURB, TYPE D1-6 |
1.16
| 615 | LF | $12.00 | $18.45 |
$11,346.75
| $13.61 | $13.00 |
302.05.008 | AC CURB, TYPE D1-8 |
0.35
| 108 | LF | $17.00 | $31.41 |
$3,392.28
| $17.35 | $13.00 |
302.05.013 | AC PAVEMENT |
5.15
| 182 | TON | $220.00 | $275.87 |
$50,208.34
| $220.72 | $217.94 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.11
| 4 | TON | $200.00 | $275.87 |
$1,103.48
| $379.47 | $250.44 |
302.05.018 | AC PAVEMENT(DIGOUTS) |
4.34
| 184 | TON | $156.00 | $230.00 |
$42,320.00
| $163.50 | $149.50 |
303.01.617 | MASONRY RETAINING WALL PER STD PLAN 618 |
4.01
| 455 | SF | $70.00 | $85.87 |
$39,070.85
| $78.72 | $75.44 |
303.01.618 | PCC FOOTING FOR MASONRY RETAINING WALL |
1.83
| 15 | CY | $500.00 | $1,190.00 |
$17,850.00
| $1,332.50 | $1,420.00 |
303.02.003 | AIR PLACED CONCRETE |
1.20
| 4 | CY | $500.00 | $2,920.00 |
$11,680.00
| $2,776.25 | $2,860.00 |
303.05.009 | PCC CURB & GUTTER, TYPE A2-6 |
1.12
| 74 | LF | $25.00 | $147.15 |
$10,889.10
| $127.04 | $126.08 |
303.05.053 | PCC WALK, 6" THICK |
0.30
| 103 | SF | $15.00 | $28.40 |
$2,925.20
| $38.35 | $36.70 |
304.02.013 | CABLE RAILING (CALTRANS STD PLAN B11-47) |
0.20
| 12 | LF | $60.00 | $158.70 |
$1,904.40
| $203.18 | $197.50 |
304.03.003 | CHAIN LINK FENCE, 6' HIGH |
0.36
| 109 | LF | $75.00 | $32.20 |
$3,509.80
| $56.80 | $60.00 |
304.06.003 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) |
0.20
| 63 | LF | $50.00 | $30.20 |
$1,902.60
| $39.55 | $38.00 |
304.06.009 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.07
| 1250 | LB | $4.00 | $0.58 |
$725.00
| $3.02 | $2.95 |
304.06.019 | MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) |
0.18
| 25 | LF | $100.00 | $71.76 |
$1,794.00
| $112.32 | $108.75 |
304.06.033 | IN-LINE TERMINAL SYSTEM (TYPE X-TENSION - W/ STEEL POST) |
1.31
| 2 | EA | $5,000.00 | $6,369.85 |
$12,739.70
| $6,599.96 | $6,684.93 |
304.06.051 | TRANSITION RAILING (TYPE WB) |
0.96
| 2 | EA | $5,000.00 | $4,681.08 |
$9,362.16
| $4,454.02 | $4,567.50 |
307.02.045 | NO. 6 PULL BOX INCL PCC COVER |
0.09
| 1 | EA | $1,000.00 | $920.00 |
$920.00
| $2,109.00 | $960.00 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.82
| 580 | LF | $10.00 | $13.80 |
$8,004.00
| $16.35 | $14.40 |
310.05.007 | DETAIL 38 (THERMOPLASTIC) |
0.21
| 600 | LF | $1.50 | $3.45 |
$2,070.00
| $2.99 | $3.15 |
310.05.007 | DETAIL 39 (THERMOPLASTIC) |
1.76
| 24865 | LF | $1.00 | $0.69 |
$17,156.85
| $0.70 | $0.70 |
310.05.007 | DETAIL 27 (THERMOPLASTIC) |
0.04
| 170 | LF | $2.00 | $2.30 |
$391.00
| $2.33 | $2.15 |
310.05.007 | DETAIL 26 (THERMOPLASTIC) |
0.31
| 8635 | LF | $0.50 | $0.35 |
$3,022.25
| $0.33 | $0.33 |
310.05.007 | DETAIL 9 (THERMOPLASTIC) |
0.68
| 9640 | LF | $1.00 | $0.69 |
$6,651.60
| $0.77 | $0.70 |
310.05.007 | DETAIL 22 (THERMOPLASTIC) |
0.71
| 3785 | LF | $2.00 | $1.84 |
$6,964.40
| $1.61 | $1.60 |
310.05.007 | DETAIL 29 (THERMOPLASTIC) |
0.29
| 1240 | LF | $2.50 | $2.30 |
$2,852.00
| $2.73 | $2.80 |
310.05.014 | DETAIL 39A (THERMOPLASTIC) |
0.07
| 930 | LF | $1.00 | $0.69 |
$641.70
| $0.72 | $0.70 |
310.05.022 | DETAIL 27B (THERMOPLASTIC) |
0.20
| 3130 | LF | $1.00 | $0.63 |
$1,971.90
| $0.93 | $0.74 |
310.05.034 | PAVEMENT MARKINGS (THERMOPLASTIC) |
0.99
| 930 | SF | $5.00 | $10.35 |
$9,625.50
| $8.15 | $7.83 |
310.05.040 | 6" STRIPING (THERMOPLASTIC) |
0.03
| 45 | LF | $2.00 | $5.75 |
$258.75
| $3.81 | $3.65 |
310.05.040 | 4" STRIPING (THERMOPLASTIC) |
0.27
| 2255 | LF | $1.00 | $1.15 |
$2,593.25
| $1.27 | $1.08 |
310.05.040 | 12" STRIPING (THERMOPLASTIC) |
0.11
| 325 | LF | $3.00 | $3.45 |
$1,121.25
| $3.54 | $3.38 |
312.01.017 | INSTALL FIRE HYDRANT LOCATION RPM |
0.02
| 12 | EA | $10.00 | $17.25 |
$207.00
| $28.81 | $22.63 |
601.09.011 | TRAFFIC CONTROL |
1.77
| 1 | LS | $20,000.00 | $17,250.00 |
$17,250.00
| $71,708.13 | $20,125.00 |
601.09.011 | TRAFFIC CONTROL |
8.38
| 1 | LS | $70,000.00 | $81,750.00 |
$81,750.00
| $71,708.13 | $20,125.00 |
601.09.013 | TEMPORARY CRASH CUSHION ARRAY |
0.19
| 1 | EA | $5,000.00 | $1,897.50 |
$1,897.50
| $8,089.38 | $8,000.00 |
601.09.015 | TEMPORARY RAILING (TYPE K) |
1.69
| 1400 | LF | $30.00 | $11.78 |
$16,492.00
| $29.50 | $33.50 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
0.95
| 2 | EA | $5,000.00 | $4,615.00 |
$9,230.00
| $4,867.50 | $4,807.50 |
801.04.013 | FURNISH AND PLANT 15 GALLON TREE |
0.06
| 2 | EA | $600.00 | $287.50 |
$575.00
| $1,264.38 | $1,320.00 |
801.06.003 | PLANT ESTABLISHMENT PERIOD |
0.53
| 1 | LS | $10,000.00 | $5,175.00 |
$5,175.00
| $5,832.50 | $6,587.50 |
| RECTANGULAR FRAME AND COVER PER SPPWC STD 152 |
0.19
| 3 | EA | $750.00 | $603.75 |
$1,811.25
| $673.94 | $655.38 |
| RELOCATE 2-1/2" CONDUIT |
1.30
| 130 | LF | $50.00 | $97.75 |
$12,707.50
| $113.49 | $86.88 |
| REINFORCED CONCRETE COVER PER SECTION D-D ON SHEET 3 |
0.79
| 2 | CY | $3,700.00 | $3,852.50 |
$7,705.00
| $6,494.38 | $6,562.50 |
| CONCRETE PAVERS PER DETAIL ON SHEET 5 |
0.50
| 87 | SF | $26.00 | $55.88 |
$4,861.56
| $52.72 | $51.94 |
| OUTLET STRUCTURE PER DETAIL ON SHEET 5 |
1.62
| 1 | EA | $7,300.00 | $15,812.50 |
$15,812.50
| $8,949.38 | $8,400.00 |
| 2'-0"W X 1'-0"H RCB |
8.56
| 110 | LF | $525.00 | $759.00 |
$83,490.00
| $565.50 | $576.50 |
| NO. 6 (T) PULL BOX INCL STEEL COVER |
0.12
| 1 | EA | $2,000.00 | $1,150.00 |
$1,150.00
| $2,741.00 | $1,175.00 |
| AC DIKE PER CALTRANS STD PLAN A87B |
0.31
| 104 | LF | $30.00 | $28.68 |
$2,982.72
| $16.17 | $13.00 |
| DELINEATOR PER CALTRANS STD PLAN A73C, CLASS 1, TYPE F |
0.11
| 6 | EA | $60.00 | $172.50 |
$1,035.00
| $126.13 | $130.00 |
| CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $1,000) |
0.10
| 1000 | AL | $1.00 | $1.00 |
$1,000.00
| $1.00 | $1.00 |
| Total Percent | 100 | | | | Total Amount | $975,224.69 | | |