Upcoming Projects
Altadena Dr and Washington Bl Bikeway Improvements: Implement a 4-3 road diet and construction of bikelane . Construction is estimated to begin in Fall 2018. Total bike facilities of 1.70 mile(s).
  • Washington Boulevard (Bellford Drive/Altadena Drive) - Bike Lanes - 0.74 Mi
  • Altadena Drive (Lost Canyon Road/Washington Boulevard) - Bike Lanes - 0.96 Mi
Avenue L widening from 40th St West to 57th St West: Reconstruct and widen. Construction is estimated to begin in Fall 2020.
  • Avenue L - Bike Lanes - 0.50 Mi
Budlong Av -Manchester Av/El Segundo Bl -SR2S Program: Implement a bicycle boulevard with various traffic calming features; install signs and pavement markings. Construction is estimated to begin in Fall 2017.
  • Budlong Avenue (Manchester Avenue/El Segundo Boulevard) - - 3.04 Mi
Charter Oak Bikeway Access Improvements: Construction of curb and gutter, asphalt concrete pavement on base material, and river rock; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Fall 2017. Total bike facilities of 2.40 mile(s).
  • Glendora Avenue (Arrow Highway/La Cienega Avenue) - Bike Lanes - 0.25 Mi
  • Arrow Highway (Glendora Avenue/Valley Center Boulevard) - Bike Lanes - 1.50 Mi
  • Valley Center Avenue (Arrow Highway/Badillo Street) - Bike Lanes - 0.65 Mi
Colima Rd - City of Whittier Boundary to Fullerton Rd: Median Reconst, Restriping, T/S Upgrade. Construction is estimated to begin in Spring 2019. Total bike facilities of 3.50 mile(s).
  • Colima Road (Casino Drive/Allenton Avenue) - Bike Lanes - 1.20 Mi
  • Colima Road (Fullerton Road/Brea Canyon Cut Off Road) - Bike Lanes - 2.07 Mi
  • Colima Road (Larkvane Road/Fullerton Road) - Bike Lanes - 0.23 Mi
East Avenue O Bike Lane: Widening roadway shoulders and installing bike lanesHighway Safety Improvement Program (HSIP) Cycle 5. . Construction is estimated to begin in Summer 2019.
  • Avenue O (150th Street East/165th Street East) - Bike Lanes - 1.52 Mi
Eastside Light Rail Bike Interface: Construction of curb and gutter, sidewalk, curb ramps, permeable pavers, river rock paving, and drainage structures; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Spring 2018. Total bike facilities of 6.42 mile(s).
  • Woods Avenue (1st Avenue/Olympic Boulevard) - - 1.47 Mi
  • Ford Boulevard (Floral Drive/Olympic Boulevard) - Bike Route - 1.77 Mi
  • Mednik Avenue/Arizona Avenue (Floral Drive/Olympic Boulevard) - Bike Lanes - 1.85 Mi
  • Rowan Avenue (Floral Avenue/3rd Ave) - - 0.68 Mi
  • Rowan Avenue (3rd Avenue/Whittier Blvd) - - 0.65 Mi
Florence-Firestone Bikeway Access Improvements: Install 4 miles of Class II Bike Lane with 4 to 3 lane road diet. Construction is estimated to begin in Fall 2018.
  • Compton Avenue (Slauson Avenue/92nd Street) - Bike Lanes - 2.49 Mi
Fullerton Road Corridor Improvements: Widen Fullerton Rd from SR-60 EB ramp to Camino Bello S/o Colima Rd to add one lane in each direction. Construction is estimated to begin in Summer 2020.
  • Fullerton Road (Colima Road/Pathfinder Road) - Bike Lanes - 1.58 Mi
Heller Circle, et al.: Construction cold central plant recycled asphalt concrete pavement on cement-stabilized pulverized base, tire rubber modified asphalt concrte pavement, bus pads, curb and gutter, sidewalk, driveways, and curb ramps; cold milling; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. Construction is estimated to begin in Spring 2018.
  • Plum Canyon Road (Via Joice Drive/Ashbro Drive) - Bike Lanes - 1.74 Mi
Los Angeles River Bike Path - Lankershim Bl/Barham Bl: Construction of asphalt concrete pavement on base material, reinforced concrete retaining walls, drainage structures, and a pedestrian bridge; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Fall 2018.
  • Los Angeles River Proposed Bicy (Lankershim Boulevard/0.2 mi W/o Barham Blvd) - Bike Path - 0.99 Mi
Mureau Road Bike Lane Project: Construction of asphalt concrete pavement on base material, metal beam guardrail, cable railing, terminal end treatments, and drainage structures; installation of striping and pavement markings; and the performance of other appurtenant work. . Construction is estimated to begin in Fall 2017.
  • Mureau Road (Las Virgenes Road/Calabasas Road) - Bike Lanes - 1.85 Mi
Overhill Drive - La Brea Avenue to Slauson Avenue: Construction of curb and gutter, sidewalk, driveways, curb ramps, retaining walls, asphalt concrete pavement on base material, and guardrail; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Summer 2018. Total bike facilities of 0.90 mile(s).
  • Overhill Drive (Slauson Avenue/60th Street) - Bike Route - 0.25 Mi
  • Overhill Drive (Stocker Street/Slauson Avenue) - Bike Lanes - 0.65 Mi
Quarry Clasp/Peck Park Bike Trail: Construction of asphalt concrete pavement on base material, drainage structures, and fencing; landscaping; irrigation; and other appurtenant work. Construction is estimated to begin in Summer 2018.
  • Rio Hondo Whittier Narrows - Bike Path - 0.08 Mi
Santa Fe Av-Artesia Bl to Del Amo Bl: Resurf and Reconst. Construction is estimated to begin in Fall 2018.
  • Santa Fe Avenue (Artesia Boulevard/0.1 mi S/o Reyes Avenue) - Bike Lanes - 0.96 Mi
South San Gabriel Bikeway Access Improvements: Install 2.43 miles of Class II Bike Lane and 1 mile of 4 to 3 lane road diet. Construction is estimated to begin in Summer 2018.
  • Del Mar Avenue/Hill Drive/San G (Graves Avenue/0.2 mi E/o Lincoln Avenue) - Bike Lanes - 2.62 Mi
The Old Rd over Santa Clara River & SPT CO. Bridge: Bridge Replacement, Road Construction, and Multiuse Trail. Construction is estimated to begin in Spring 2021.
  • The Old Road (Turnberry Lane/Magic Mountain Parkway) - Bike Lanes - 2.29 Mi
Vermont Avenue Bike Lane: Construction of curb and gutter, asphalt concrete pavement and concrete pavement on base material; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Fall 2017.
  • Vermont Avenue (87th Street/El Segundo Boulevard) - Bike Lanes - 2.86 Mi
Washington Bl, et al.: Road Resurfacing. Construction is estimated to begin in Fall 2018.
  • La Mirada Boulevard (Colima Road/Leffingwell Road) - Bike Lanes - 1.06 Mi
West Rancho Dominguez Bikeway Access Improvements: Install 7.04 miles of Class II Bike Lane and 5.5 mile of travel lane removal. Construction is estimated to begin in Summer 2018. Total bike facilities of 7.53 mile(s).
  • El Segundo Boulevard (Figueroa Street/Central Avenue) - Bike Lanes - 0.96 Mi
  • Avalon Boulevard (121st Street/Alondra Boulevard) - Bike Lanes - 2.54 Mi
  • Central Avenue (121st Street/127th Street) - Bike Lanes - 0.47 Mi
  • Broadway (E. 121st Street/E. Alondra Blvd) - Bike Lanes - 2.55 Mi
  • E. Redondo Beach Blvd (S Figueroa St/Avalon Blvd) - Bike Lanes - 1.02 Mi
Westmont Community Bikeway Access Improvements: Construction of asphalt concrete pavement on base material, curb and gutter, sidewalk,curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work. Construction is estimated to begin in Fall 2017. Total bike facilities of 1.74 mile(s).
  • Denker Avenue (Century Boulevard/Imperial Highway) - Bike Route - 1.00 Mi
  • 110th Street (Western Avenue/Denker Avenue) - - 0.25 Mi
  • 110th Street (Denker Avenue/Budlong Avenue) - - 0.49 Mi
Willowbrook Area Access Improvements: Reconstruction of roadway pavement, construction of curb and gutter, sidewalk, driveways, and curb ramps; landscaping; irrigation system; signage and streetscape improvements; and the performance of other appurtentant work. . Construction is estimated to begin in Fall 2016.
  • 120th Street/119th Street (Central Avenue/Wilmington Avenue) - Bike Lanes - 0.84 Mi
Projects In Progress
El Segundo Boulevard - Avalon Boulevard to Central Avenue, et al.: Cold-in-place recycling of existing asphalt concrete pavement; resurfacing of the roadway with asphalt rubber hot mix; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps; construction of bioswales; installation of striping and pavment markings; landscaping; and the performance of other appurtenant work. Total bike facilities of 1.51 mile(s).
  • El Segundo Boulevard (Wilmington Avenue/Alameda Street) - Bike Lanes - 0.89 Mi
  • El Segundo Boulevard (Central Avenue/Avalon Blvd) - Bike Lanes - 0.62 Mi
Firestone Boulevard - Central Avenue/Graham Avenue, et al.: Resurfacing of roadway pavement; construction of an asphalt rubber and aggregate membrane interlayer; reconstruction of medians, curb and gutter, sidewalk, driveways, and curb ramps; installation of striping and pavement markings; traffic signal modifications; and the performance of other appurtenant work. Total bike facilities of 6.13 mile(s).
  • Firestone Boulevard (Central Avenue/Alameda Street) - Bike Lanes - 1.43 Mi
  • Hooper Avenue (Slauson Avenue/95th Street) - Bike Lanes - 2.73 Mi
  • 120th Street (Western Avenue/Vermont Avenue) - Bike Lanes - 0.99 Mi
  • 120th Street (Aviation Boulevard/Inglewood Avenue) - Bike Route - 0.97 Mi
Los Palacios Drive, et al.: the reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; resurfacing of roadway pavement using asphalt rubber hot mix; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; and the performance of other appurtenant work .
  • Jellick Drive/Los Padres Drive (Greenbay Drive/Aguiro Street) - Bike Route - 1.48 Mi
Quartz Hill Elementary School Traffic Improvements: Traffic improvements include new sidewalk and crosswalk modifications, Class II bicycle lane, drainage upgrades, and a driver feedback sign. .
  • 55th Street West (Avenue L/Avenue M-8) - Bike Lanes - 1.52 Mi
Slauson Avenue Revitalization: Resurfacing of roadway pavement tire rubber modified asphalt concrete; reconstruction of curb and gutter, sidewalk, driveways,and curb ramps; construction of concrete pavement and crosswalks, and streetscape improvements; and the performance of other appurtenant work.
  • Slauson Avenue (La Brea Ave/Angeles Vista Road) - Bike Route - 0.38 Mi
Susana Road, et al.: Construction of tire rubber modified asphalt concrete and cold central plant recycled asphalt concrete pavement on cement stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. .
  • S. Susana Road (E. Artesia Blvd/Del Amo Blvd) - Bike Lanes - 1.97 Mi
Projects Completed Since 2012
108th Street, et al.: Roadway resurfacing; Reconstruction of curb and gutter, sidewalk, driveways, curb ramps, cross gutters, and alley intersections; installation of striping and pavement markings; modification of traffic signals; replace 24-inch CMP, and the performance of other appurtenant work. Total bike facilities of 1.48 mile(s).
  • Western Avenue (Imperial Hwy/120th St) - Bike Lanes - 0.48 Mi
  • Western Avenue (Century Blvd/Imperial Hwy) - Bike Lanes - 1.00 Mi
124th Street, et al.: reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work . Total bike facilities of 2.96 mile(s).
  • Slater Avenue (120th Street/El Segundo Boulevard) - Bike Route - 0.54 Mi
  • Success Avenue (Imperial Highway/120th Street) - Bike Route - 0.39 Mi
  • 124th Street (Slater Avenue/Alameda Street) - Bike Route - 1.47 Mi
  • 120th Street/119th Street (Wilmington Avenue/Mona Boulevard) - Bike Route - 0.56 Mi
Castlegate Avenue, et al. (JOC): Chip sealing, slurry sealing, microsurfacing, and micro-milling of existing pavement; installation of striping and pavement markings; and the performance of other appurtenant work.
  • Victoria Street (Santa Fe Ave/S. Susana Road) - Bike Lanes - 0.47 Mi
Colima Road - La Mirada Boulevard to Leffingwell Road: resurfacing of roadway pavement; installation of striping and pavement markings; and the performance of other appurtenant work . Total bike facilities of 1.43 mile(s).
  • Colima Road (La Mirada Boulevard/Poulter Drive) - Bike Route - 1.15 Mi
  • Colima Road (Poulter Drive/Leffingwell Drive) - Bike Lanes - 0.28 Mi
Emerald Necklace Bike Trail: Construction of an asphalt concrete on base material, application of quick-set emulsion aggregate slurry, installation of striping and pavement marking; and the performance of other appurtenance.
  • Santa Fe Spur Bike Trail (Duarte Road/San Gabriel River Bike Path) - Bike Path - 1.10 Mi
Gorman Post Road, et al. - Phase 2: Reconstruction & resurfacing of roadway pavement with asphalt concrete, asphalt rubber & aggregate membrane, & asphalt rubber hot-mix with a warm mix additive; construction of concrete bus pads, sidewalk, & curb; reconstruction of curb & gutter; modification of traffic signals; installation of rubber sidewalk pavers & striping & pavement markings; & the performance of other appurtenant work.
  • The Old Road (Stevenson Ranch Parkway/Sagecrest Circle South) - Bike Lanes - 1.77 Mi
Holmes Ave -Slauson Ave/Gage Ave: Traffic Calming -reducing the number of existing travel lanes from two to one in each direction in order to accommodate a continuous two-way left turn lane and bike lane.
  • Holmes Avenue (Slauson Avenue/Gage Avenue) - Bike Lanes - 0.50 Mi
La Brea Avenue, et al.: Resurfacing of roadway pavement with asphalt rubber hot mix; construction of curb and gutter, sidewalk, curb ramps, catch basin, and inductive loop detectors; installation of striping and pavement markings; and the performance of other appurtenant work .
  • Slauson Avenue (Fairfax Avenue/La Brea Avenue) - Bike Route - 0.25 Mi
Lennox Community Road Improvements, Phase I: Roadway reconstruction; construction of asphalt rubber hot mix, and cold central plant recycled asphalt concrete on cement stabilized subgrade; reconstruction of curb and gutter, sidewalk, driveways, cross gutters, and curb ramps; installation of striping and pavement markings; and the performance of other appurtenant work. Total bike facilities of 1.62 mile(s).
  • 104th Street (Buford Avenue/Prairie Avenue) - Bike Route - 1.13 Mi
  • Freeman Avenue (104th Street/111th Street) - Bike Route - 0.50 Mi
Sinaloa Avenue, et al.: Resurfacing of asphalt concrete pavement; micro-milling of existing asphalt concrete pavement; construction of an asphalt rubber and aggregate membrane and polymer modified emulsion-reclaimed asphalt pavement aggregate slurry seal; and the performance of other appurtenant work. Total bike facilities of 2.02 mile(s).
  • Holliston Avenue (Altadena Drive/Lexington Street) - Bike Route - 1.09 Mi
  • Pepper Drive (Glen Canyon Road/Washington Boulevard) - Bike Route - 0.94 Mi
Traffic Improvements near Eastman Elementary School: Construction of speed cushions, curb and gutter bulb outs, and asphalt concrete pavement on base material; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work.
  • Downey Road (3rd Avenue/Noakes Street) - Bike Route - 1.48 Mi
Vermont Avenue Median Landscaping, Phase 2: Landscaping of roadway medians; construction of electrical conduit, irrigation systems, inductive loop detectors, and monument signs; installation of striping and pavement markings; and the performance of other appurtenant work.
  • Vermont Avenue (190th Street/Lomita Boulevard) - Bike Lanes - 3.66 Mi
Woodbury Road Median Landscaping: reconstruction of curb and gutter; construction of landscaping, irrigation systems, installation of striping and pavement markings, and the performance of other appurtenant work .
  • Woodbury Rd (Windsor Avenue/Santa Rosa Avenue) - Bike Lanes - 1.51 Mi
Workman Mill Road: Cold milling and resurfacing of roadway pavement with asphalt rubber hot mix on asphalt rubber and aggregate membrane; construction of a Portland cement concrete bus pad; reconstruction of curb and gutter, sidewalk, curb ramps, and driveway; traffic signal modifications; striping and pavement markings; and the performance of other appurtenant work.
  • Workman Mill Road (Oakman Drive/Third Avenue) - Bike Lanes - 1.01 Mi


For more information on County bikeway projects, please contact us. Please note that planned on-road bikeways are implemented in conjunction with road reconstruction projects whenever feasible.