| Location: CITIES |
| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
3 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
| 5 |
IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
LS |
1 |
| 6 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 7 |
ENVIRONMENTAL AIR MONITORING |
LS |
1 |
| 8 |
PREPARATION OF SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 9 |
IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
LS |
1 |
| 10 |
PREPARATION OF THE DEBRIS CONTAINMENT AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 11 |
IMPLEMENTATION OF THE DEBRIS CONTAINMENT AND CONTROL PLAN |
LS |
1 |
| 12 |
CITIES PERMIT AND INSPECTION FEES (ALLOWANCE OF $16,000) |
AL |
16,000 |
| 13 |
OFFICE FACILITIES |
MTH |
4 |
| 14 |
ADDITIONAL DECK AND SPALL REPAIRS (ALLOWANCE OF $48,000) |
AL |
48,000 |
| 15 |
SAWCUT GROOVES FOR JOINT SEAL (ALLOWANCE OF $8,000) |
AL |
8,000 |
| 16 |
TRAFFIC CONTROL |
LS |
1 |
| 17 |
FLASHING ARROW SIGN |
LS |
1 |
| 18 |
CHANGEABLE MESSAGE SIGN |
LS |
1 |
| 19 |
TEMPORARY RAILING (TYPE K) |
LF |
430 |
| 20 |
BRIDGE REMOVAL (PORTIONS)* |
LS |
1 |
| 21 |
STRUCTURE CONCRETE* |
CY |
3 |
| 22 |
BAR REINFORCING STEEL* |
LB |
157 |
| 23 |
DECK DRAIN |
EA |
3 |
| 24 |
MISCELLANEOUS METAL (BRIDGE)* |
LB |
2,645 |
| 25 |
CLEAN & PAINT STRUCTURAL STEEL |
LS |
1 |
| 26 |
CHAIN LINK FENCE, 5' HIGH |
LF |
16 |
| 27 |
REMOVE DETAIL 9 (PAINT) |
LF |
1,933 |
| 28 |
DETAIL 9 (THERMOPLASTIC) |
LF |
1,933 |
| 29 |
REMOVE DETAIL 21 (YELLOW PAINT) |
LF |
204 |
| 30 |
DETAIL 21 (THERMOPLASTIC) |
LF |
204 |
| 31 |
REMOVE DETAIL 22 (YELLOW PAINT) |
LF |
674 |
| 32 |
DETAIL 22 (THERMOPLASTIC) |
LF |
674 |
| 33 |
REMOVE DETAIL 27B (PAINT) |
LF |
755 |
| 34 |
DETAIL 27B (THERMOPLASTIC) |
LF |
755 |
| 35 |
REMOVE DETAIL 29 (YELLOW PAINT) |
LF |
755 |
| 36 |
DETAIL 29 (THERMOPLASTIC) |
LF |
755 |
| 37 |
REMOVE 12" STRIPING (PAINT) |
LF |
415 |
| 38 |
12" STRIPING (THERMOPLASTIC) |
LF |
415 |
| 39 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (DECK) |
SF |
358 |
| 40 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (SIDEWALK) |
SF |
33 |
| 41 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (BARRIER) |
SF |
73 |
| 42 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (SOFFIT) |
SF |
7 |
| 43 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (ABUTMENT) |
SF |
66 |
| 44 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (PIER) |
SF |
33 |
| 45 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (DIAPHRAGM) |
SF |
22 |
| 46 |
REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (GIRDER) |
SF |
467 |
| 47 |
RAPID SETTING CONCRETE PATCH (DECK) |
SF |
358 |
| 48 |
REPAIR SPALLED CONCRETE (SIDEWALK) |
SF |
33 |
| 49 |
REPAIR SPALLED CONCRETE (BARRIER) |
SF |
73 |
| 50 |
REPAIR SPALLED CONCRETE (SOFFIT) |
SF |
7 |
| 51 |
REPAIR SPALLED CONCRETE (ABUTMENT) |
SF |
66 |
| 52 |
REPAIR SPALLED CONCRETE (PIER) |
SF |
33 |
| 53 |
REPAIR SPALLED CONCRETE (DIAPHRAGM) |
SF |
22 |
| 54 |
REPAIR SPALLED CONCRETE (GIRDER) |
SF |
467 |
| 55 |
PREPARE CONCRETE DECK SURFACE |
SF |
66,907 |
| 56 |
TREAT BRIDGE DECK* |
SF |
66,907 |
| 57 |
BRIDGE DECK TREATMENT MATERIAL |
GAL |
836 |
| 58 |
CLEAN EXPANSION JOINT |
LF |
874 |
| 59 |
JOINT SEAL (MR 1/2") |
LF |
185 |
| 60 |
JOINT SEAL (MR 1") |
LF |
105 |
| 61 |
JOINT SEAL (MR 1-1/2") |
LF |
80 |
| 62 |
JOINT SEAL, TYPE AL |
LF |
504 |