| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
6 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 6 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
| 7 |
PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) |
LS |
1 |
| 8 |
IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
LS |
1 |
| 9 |
PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
LS |
1 |
| 10 |
IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
LS |
1 |
| 11 |
DISPOSAL OF LEAD CONTAINING WASTE/DEBRIS |
LS |
1 |
| 12 |
OFFICE FACILITIES |
MTH |
7 |
| 13 |
MOBILIZATION |
LS |
1 |
| 14 |
CLEARING AND GRUBBING |
LS |
1 |
| 15 |
12" HIGH DENSITY POLYETHYLENE PIPE |
LF |
215 |
| 16 |
12" WATERMAIN, .25" THICK STL |
LF |
350 |
| 17 |
6" WATERMAIN, .25" THICK STL |
LF |
50 |
| 18 |
GATE VALVE, 200 PSI WWP, 12" |
EA |
2 |
| 19 |
GATE VALVE, 200 PSI WWP, 8" |
EA |
1 |
| 20 |
GATE VALVE, 200 PSI WWP, 6" |
EA |
1 |
| 21 |
GATE VALVE, 250 PSI WWP, 6" |
EA |
1 |
| 22 |
INTERCONNECTION TO EXISTING WATERMAIN |
EA |
3 |
| 23 |
INITIAL VIDEO INSPECTION |
LS |
1 |
| 24 |
VIDEO INSPECTION |
LS |
1 |
| 25 |
OWEN TANK DEMOLITION |
LS |
1 |
| 26 |
0.5 MG WATER STORAGE TANK AND APPURTENANCES |
LS |
1 |
| 27 |
OVERFLOW PRECAST DROP INLET, 36" X 36" |
EA |
1 |
| 28 |
CLEANOUT DOOR PRECAST DROP INLET, 48" X 48" |
EA |
1 |
| 29 |
CATHODIC PROTECTION SYSTEM (TANK) |
LS |
1 |
| 30 |
CONCRETE PAD (SURGE TANKS) |
CY |
17 |
| 31 |
1250 GAL BLADDER SURGE TANK CONTROL SYSTEM |
LS |
1 |
| 32 |
3000 GAL BLADDER SURGE TANK CONTROL SYSTEM |
LS |
1 |
| 33 |
GRAVEL |
CY |
130 |
| 34 |
CONCRETE RAIL FENCE |
LF |
165 |
| 35 |
PCC HEADER, 6"X12" |
LF |
890 |
| 36 |
CONCRETE PAVING (PCC) 4" THICK |
SF |
305 |
| 37 |
TREE PROTECTION |
LS |
1 |
| 38 |
ELECTRICAL WORK |
LS |
1 |
| 39 |
TRAFFIC CONTROL |
LS |
1 |
| 40 |
CONST & REMOVE TEMP CHAIN LINK FENCE |
LF |
275 |