| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.17
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.17
| 5 | MTH | $500.00 | $500.00 |
$2,500.00
| $500.00 | $500.00 |
| 001.06.007 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.07
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.33
| 1 | LS | $10,000.00 | $5,000.00 |
$5,000.00
| $41,047.00 | $20,000.00 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
1
| 1 | LS | $15,000.00 | $15,000.00 |
$15,000.00
| $30,360.40 | $34,138.00 |
| 001.07.021 | SHORING OF OPEN EXCAVATIONS |
2.34
| 1 | LS | $32,000.00 | $35,000.00 |
$35,000.00
| $38,540.20 | $35,000.00 |
| 001.08.005 | OFFICE FACILITIES |
2
| 6 | MTH | $8,500.00 | $5,000.00 |
$30,000.00
| $7,690.40 | $8,125.00 |
| 001.09.003 | MOBILIZATION |
5.01
| 1 | LS | $90,000.00 | $75,000.00 |
$75,000.00
| $86,256.40 | $75,000.00 |
| 300.01.003 | CLEARING AND GRUBBING |
2.34
| 1 | LS | $20,000.00 | $35,000.00 |
$35,000.00
| $35,453.60 | $31,250.00 |
| 304.01.015 | STRUCTURAL STEEL |
35.55
| 35498 | LB | $20.00 | $15.00 |
$532,470.00
| $10.91 | $9.40 |
| 500.00.015 | VIDEO INSPECTION |
0.33
| 1 | LS | $5,500.00 | $5,000.00 |
$5,000.00
| $13,687.40 | $5,000.00 |
| 601.09.011 | TRAFFIC CONTROL |
2.34
| 1 | LS | $130,000.00 | $35,000.00 |
$35,000.00
| $71,761.20 | $67,500.00 |
| | REMOVE AND DISPOSE EXISTING 16" HDPE WATER MAIN |
0.67
| 1 | LS | $45,000.00 | $10,000.00 |
$10,000.00
| $31,073.00 | $22,365.00 |
| | TEMPORARY SUPPLY LINE |
2.34
| 1 | LS | $50,000.00 | $35,000.00 |
$35,000.00
| $40,566.40 | $50,000.00 |
| | 16" STEEL WATERMAIN, .375" THICK, CML&C |
0.67
| 10 | LF | $2,000.00 | $1,000.00 |
$10,000.00
| $2,004.20 | $1,920.00 |
| | RELOCATE RIP RAP |
0.33
| 5 | CY | $5,000.00 | $1,000.00 |
$5,000.00
| $3,926.20 | $2,995.00 |
| | PREPARATION OF THE WATERLINE DISCHARGE PLAN (STIPULATED PRICE OF $2,500) |
0.17
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| | MISCELLANEOUS METAL |
1.08
| 808 | LB | $50.00 | $20.00 |
$16,160.00
| $98.15 | $40.00 |
| | MAINTENANCE AND REMOVAL OF ESA FENCING |
0.59
| 890 | LF | $2.00 | $10.00 |
$8,900.00
| $22.30 | $22.00 |
| | INTERCONNECTION TO EXISTING WATERMAIN |
1
| 3 | EA | $32,000.00 | $5,000.00 |
$15,000.00
| $21,712.20 | $24,000.00 |
| | INSTALLATION OF ESA FENCING |
1.49
| 890 | LF | $6.00 | $25.00 |
$22,250.00
| $41.90 | $37.50 |
| | INITIAL VIDEO INSPECTION |
0.33
| 1 | LS | $5,500.00 | $5,000.00 |
$5,000.00
| $13,687.20 | $5,000.00 |
| | INSTALL 18" STEEL WATERMAIN, CML&C, WELDED (DELIVER FROM POINT DUME YARD) |
6.68
| 100 | LF | $850.00 | $1,000.00 |
$100,000.00
| $1,387.60 | $1,200.00 |
| | FLEXIBLE EXPANSION JOINT, DOUBLE BALL, 18" |
6.68
| 2 | EA | $50,000.00 | $50,000.00 |
$100,000.00
| $37,127.20 | $45,858.00 |
| | DRILL AND BOND ANCHOR (EPOXY CARTRIDGE) |
0.95
| 57 | LF | $300.00 | $250.00 |
$14,250.00
| $1,242.10 | $500.00 |
| | AIR RELEASE AND VACUUM VALVE ASSEMBLY, 2" |
0.33
| 1 | EA | $8,400.00 | $5,000.00 |
$5,000.00
| $9,401.20 | $8,000.00 |
| | 18" STEEL WATERMAIN, .375" THICK, CML&C, FLANGED JOINTS |
24.03
| 300 | LF | $1,250.00 | $1,200.00 |
$360,000.00
| $1,578.60 | $1,700.00 |
| | TRENCH BACKFILL SLURRY |
1.02
| 17 | CY | $680.00 | $900.00 |
$15,300.00
| $564.20 | $560.00 |
| | Total Percent | 100 | | | | Total Amount | $1,497,830.00 | | |