2231-002.01B4 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 1 Demolition) |
$887,663.61 |
Refurbish approximately 8,500 s.f. of office space (Phase 1) |
2231-003.01B1 |
MLK CFWC Medication Room - Load Readings |
$9,640.30 |
MLK CFWC Medication Room HVAC Project - Electrical Readings. |
2231-004.01B1 |
General Hospital Development Electrical Load Metering-.- |
$106,300.88 |
30-day metering for 33 locations. |
2231-005.01B1 |
OVMC Emergency Power Upgrade - Service Generator Engine |
$10,869.38 |
Service to new power generator |
2231-005.02S1 |
OVMC Emergency Power Upgrade - Rent Temporary Generator.. |
$17,201.89 |
Provide labor, equipment, material and testing to rent a temporary generator for a time period when connecting the new 5KV switchgear to the existing electrical infrastructure. |
2231-006.01B3 |
USP 800 Pharmacy Upgrade - HUCLA MC |
$113,214.17 |
Purchase of long-lead items including but not limited to the chemotherapy preparation room, ante room, IV room. |
2231-009.01B1 |
Olive View-UCLA Medical Center Mammography 1D118 Project |
$9,112.95 |
Prepare and seal concret slab. |
2231-010.01S1 |
HQ Ancillary Glass Replacement Supplemental |
$31,124.51 |
|
2231-011.01B1 |
Public Health Downey Laboratory Expansion Project |
$11,174.14 |
Pothole 6 locations to determine the footing width, thickness, and bottom of footing elevation. |
2231-012.01S1 |
RLA North Campus Infrastructure and Demolition - Campus Site Lighting |
$19,853.06 |
Added wood pole for overhead wire support with concrete footing and rebar cage. |
2231-013.01S3 |
Agricultural Commissioner/Weights and Measures Building B Renovation |
$469,298.66 |
Refurbish Entomology and Plant Pathology Laboratories. |
2231-015.01B2 |
MLK Facilities Buildings AHUs Replacement Project - Electrical Load Readings |
$4,617.60 |
Provide Electrical 30 Day Load Test |