2229-002.01S1 |
Pomona Public Health Center Deferred Maintenance Repairs.. |
$102,692.91 |
Revisions to existing walls. |
2229-004.01B1 |
LAC+USC ER-CT-UPS PROJECT |
$550,037.47 |
Provide labor and materials to install new UPS equipment in a fire-rated enclosure per approved construction documents. |
2229-004.02S1 |
LAC+USC ER-CT-UPS Project Supplemental |
$17,163.07 |
|
2229-006.01B1 |
MLK BHC Project JAC Parking Lot Trash Enclosure |
$159,373.03 |
Provide all labor, materials, and equipment to install trash enclosure with concrete pad, walkway, and curb, concrete masonry unit walls, two gates, and steel roof decking at the North-East corner of the MLK Child and Family Wellbeing Center. Scope includes demo existing iron fence, conduit/wire, asphalt, pole, and landscaping. Reference: 1. Bulletin #8 issued by Cannon Design 09/16/22, approved by Building & Safety 11/17/22. |
2229-009.01B1 |
CMP Replacement at 11770 Mines Boulevard.-. |
$117,962.09 |
Replacing damaged CMP at 11770 Mines Bl in the Unincorporated Whittier. |
2229-009.02S1 |
CMP Replacement at 11770 Mines Boulevard - Credit |
($24,823.77) |
Credit materials not used in the replacement of damaged CMP at 11770 Mines Boulevard. |
2229-010.01B1 |
Waterworks Power Pole Replacement Project |
$18,235.85 |
Remove and Replace utility pole (120Volt) in Pearblossom, CA |