2307GG-001.01B1 |
Los Angeles General Medical Center Radiography/Fluoroscopy Equipment Replacement Project |
$825,458.91 |
Los Angeles General Medical Center Radiography/Fluoroscopy equipment replacement. |
2307GG-001.02S1 |
Los Angeles General Medical Center Radiography\Fluoroscopy Equipment Replacement Project. |
$52,600.89 |
Supplemental work for unforeseen site conditions. |
2307GG-003.01B2 |
PD HOR 2nd Floor HVAC Air Readings |
$17,305.12 |
Make ready existing HVAC air reading for the project. |
2307GG-005.01B2 |
Baldwin Park Animal Shelter RVT Building Refurbishment |
$2,937.28 |
Provide 30 day panel load reading for Subpanel DB. |
2307GG-006.01B1 |
MLK TAY Drop-In Center - Fire Hydrant Flow Testing |
$2,176.73 |
Provide fire flow testing of on-site fire hydrant and produce a report indicating water flow and pressure. |
2307GG-007.01B1 |
Willowbrook Senior Center - Emergency Generator Project |
$2,937.28 |
30 day metered panel load testing for panel A. |
2307GG-008.01B1 |
Medical Examiners Crypt Expansion Project. |
$2,937.28 |
30 day metered panel load testing for panel BLDEA. |
2307GG-009.01B1 |
Naples Island Pump Station Rehabilitation - Phase II. |
$7,869.96 |
Remove three existing trees. |
2307GG-009.02S1 |
Naples Island Pump Stations Rehabilitation - Phase II. |
$2,951.11 |
Supplemental request to add an unstamped pedestrian detour plan and associated signage. |
2307GG-013.01B1 |
HUCLA Trailer Remodel Reconfigure Workstations & Miscellaneous Repairs |
$9,170.80 |
Remodel of existing DPW Trailers on Harbor UCLA project. |
2307GG-014.01B1 |
McCourtney Complex DM-3 |
$4,078.46 |
Perform the 30 day metering on the feeders for the Sheriff building. |
2307GG-015.01B1 |
H Claude Hudson CHC Urgent Care Remodeling Project - Air Balance Testing. |
$13,223.50 |
Air Balance Testing of select mechanical ducts at the H. Claude Hudson CHC Urgent Care. |