2307GG-001.01B1 |
Los Angeles General Medical Center Radiography/Fluoroscopy Equipment Replacement Project |
$825,458.91 |
Los Angeles General Medical Center Radiography/Fluoroscopy equipment replacement. |
2307GG-003.01B2 |
PD HOR 2nd Floor HVAC Air Readings |
$17,305.12 |
Make ready existing HVAC air reading for the project. |
2307GG-005.01B2 |
Baldwin Park Animal Shelter RVT Building Refurbishment |
$2,937.28 |
Provide 30 day panel load reading for Subpanel DB. |
2307GG-006.01B1 |
MLK TAY Drop-In Center - Fire Hydrant Flow Testing |
$2,176.73 |
Provide fire flow testing of on-site fire hydrant and produce a report indicating water flow and pressure. |
2307GG-007.01B1 |
Willowbrook Senior Center Emergency Generator Project |
$2,937.28 |
30 day metered panel load testing for panel A. |
2307GG-008.01B1 |
Medical Examiners Crypt Expansion Project |
$2,937.28 |
30 day metered panel load testing for panel BLDEA. |