2207BV-002.01B4 |
Civic Center Central Plant Renovation Project |
$56,017.84 |
¿ Demolish and remove existing co-generation equipment. ¿ Remove and relocate existing turbine engine and generator to storage |
2207BV-002.02B4 |
Civic Center Central Plant Renovation Project |
$2,285,872.04 |
¿ Demolish and remove existing co-generation equipment. ¿ Remove and relocate existing turbine engine and generator to storage |
2207BV-002.03B4 |
Civic Center Central Plant Renovation Project |
$470,088.52 |
Disconnect mechanical, electrical, and miscellaneous connections from co-generation equipment. |
2207BV-002.04B4 |
Civic Center Central Plant Renovation Project |
$367,703.07 |
Removal of cogen structure and infilling of the roof to original condition. Rain protection of roof to be included to ensure plant operation. |