Project Summary
Agricultural Commissioner/Weights and Measures South Gate Meter Pit Repurpose Project
-
11012 Garfield Avenue, Downey, CA 90280
The project consists of removing the existing meter pit and office structure with attached restroom and replacing them with an approximately 390-square-foot prefabricated office building and a 170-square-foot prefabricated Americans with Disabilities Act (ADA)-compliant all-gender restroom building along with associated utility connections and site improvements.
November 03, 2026 11:00 AM (non-mandatory)
11012 Garfield Avenue, Downey, CA 90280
11/24/2026 10:00 AM
|
Price
|
Price w/Postage
|
|
$0.00
|
$0.00
|
Documents
| Document | Description |
|
Appendix A - Report of Geotechnical Investigation, dated October 3, 2025, prepared by WSP
|
Appendix A - Report of Geotechnical Investigation, dated October 3, 2025, prepared by WSP
|
|
Appendix B - Revised Asbestos, Lead-Paint, and Lead Water Survey Report, dated October 19, 2026, prepared by Ramdox
|
Appendix B - Revised Asbestos, Lead-Paint, and Lead Water Survey Report, dated October 19, 2026, prepared by Ramdox
|
|
Appendix C - Construction Bid Set, dated October 20, 2026, prepared by Gruen Associates
|
Appendix C - Construction Bid Set, dated October 20, 2026, prepared by Gruen Associates
|
|
BRC0000682 - Project Manual - ACWM South Gate Meter Pit Repurpose Project
|
BRC0000682 - Project Manual - ACWM South Gate Meter Pit Repurpose Project
|