| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
34 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
| 6 |
IMPLEMENTATION OF THE SWPPP |
LS |
1 |
| 7 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
| 8 |
PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
LS |
1 |
| 9 |
IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
LS |
1 |
| 10 |
DISPOSAL OF LEAD CONTAINING PAINT WASTE |
LS |
1 |
| 11 |
FUGITIVE DUST CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) |
EA |
3 |
| 12 |
IMPLEMENTATION OF THE FUGITIVE DUST CONTROL PLAN |
MTH |
34 |
| 13 |
PREPARATION OF THE REVERSE SIGNAL ALARM MITIGATION PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 14 |
HAUL TRUCK STAGING AND IDLING PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 15 |
VEHICLES AND EQUIPMENT EMISSIONS REPORTING |
MTH |
34 |
| 16 |
PREPARATION OF THE NOISE ASSESSMENT REPORT (STIPULATED UNIT PRICE OF $15,000) |
LS |
1 |
| 17 |
PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED LUMP SUM PRICE OF $3,000) |
LS |
1 |
| 18 |
NOISE MONITORING AND REPORTING |
MTH |
34 |
| 19 |
SEDIMENT TRANSPORTATION PLAN |
LS |
1 |
| 20 |
IMPLEMENTATION OF THE QUALITY CONTROL PROGRAM FOR MOISTURE CONTENT |
DAY |
682 |
| 21 |
CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $10,000) |
AL |
10,000 |
| 22 |
OFFICE FACILITIES |
MTH |
34 |
| 23 |
MOBILIZATION |
LS |
1 |
| 24 |
INSTALLATION OF TIRE WASHES |
EA |
3 |
| 25 |
MAINTENANCE OF TIRE WASHES |
MTH |
90 |
| 26 |
WATER TRUCKS |
DAY |
682 |
| 27 |
STREET SWEEPING |
DAYS |
682 |
| 28 |
PORTABLE SCALES |
EA |
3 |
| 29 |
CONSTRUCTION OF TEMPORARY SOUND BARRIER |
LF |
5,800 |
| 30 |
MAINTENANCE OF TEMPORARY SOUND BARRIER |
LF |
5,800 |
| 31 |
REMOVAL OF TEMPORARY SOUND BARRIER |
LF |
5,800 |
| 32 |
CLEARING AND GRUBBING |
LS |
1 |
| 33 |
REMOVAL OF EXISTING IMPROVEMENTS |
LS |
1 |
| 34 |
PREPARTION OF OIL PIPELINE REMOVAL PLAN (STIPULATED PRICE OF $5,000) |
LS |
1 |
| 35 |
REMOVAL OF OIL PIPELINE |
LS |
1 |
| 36 |
TRANSPORTATION AND DISPOSAL OF PETROLEUM WASTE (ALLOWANCE OF $5,000) |
AL |
5,000 |
| 37 |
TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
LB |
4,010 |
| 38 |
TREE REMOVAL (6"-12" DIAMETER) |
EA |
2 |
| 39 |
TREE REMOVAL (13"-24" DIAMETER) |
EA |
8 |
| 40 |
TREE REMOVAL (25"+ DIAMETER) |
EA |
11 |
| 41 |
REMOVE EXISTING CHAIN LINK FENCE |
LF |
11,950 |
| 42 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
2,960 |
| 43 |
CONCRETE REMOVAL (REINFORCED) |
CY |
523 |
| 44 |
UNCLASSIFIED EXCAVATION |
CY |
13,881 |
| 45 |
BASIN EXCAVATION* |
CY |
2,085,952 |
| 46 |
AGENCY EXCLUDES 2013 MODEL YEAR ENGINE TRUCK |
TON |
2,115,914 |
| 47 |
AGENCY EXCLUDES 2014 MODEL YEAR ENGINE TRUCK |
TON |
2,115,914 |
| 48 |
AGENCY EXCLUDES 2015 MODEL YEAR ENGINE TRUCK |
TON |
2,115,914 |
| 49 |
EXCAVATION, TRANSPORTATION AND DISPOSAL OF EXCESS BASIN MATERIAL |
CY |
1,343,403 |
| 50 |
EXCAVATION, TRANSPORTATION AND DISPOSAL OF DELINEATED SOIL |
CY |
31,268 |
| 51 |
STRUCTURE EXCAVATION (ACCESS RAMP)* |
CY |
432 |
| 52 |
STRUCTURE EXCAVATION (BASIN DOWN DRAIN)* |
CY |
926 |
| 53 |
STRUCTURE EXCAVATION (CONCRETE BASIN EAST)* |
CY |
650 |
| 54 |
STRUCTURE EXCAVATION (CONCRETE BASIN WEST)* |
CY |
650 |
| 55 |
STRUCTURE EXCAVATION (INTAKE CANAL)* |
CY |
3,768 |
| 56 |
STRUCTURE EXCAVATION (OUTLET STRUCTURE)* |
CY |
2,602 |
| 57 |
STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR EAST SETTLING BASIN) |
CY |
61 |
| 58 |
STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR WEST SETTLING BASIN) |
CY |
42 |
| 59 |
STRUCTURE EXCAVATION (OVERFLOW STRUCTURE)* |
CY |
7,761 |
| 60 |
STRUCTURE EXCAVATION (WEIR STRUCTURE EAST)* |
CY |
65 |
| 61 |
STRUCTURE EXCAVATION (WEIR STRUCTURE WEST)* |
CY |
65 |
| 62 |
RIPRAP (LIGHT CLASS) |
CY |
160 |
| 63 |
RIPRAP (QUARTER TON CLASS) |
CY |
1,817 |
| 64 |
CONCRETED RIPRAP (LIGHT CLASS) |
CY |
799 |
| 65 |
CONCRETED RIPRAP (QUARTER TON CLASS) |
CY |
921 |
| 66 |
REMOVE AND RELOCATE EXISTING RIPRAP PER SH.12 |
CY |
2,110 |
| 67 |
CRUSHED MISCELLANEOUS BASE |
CY |
9,805 |
| 68 |
COLD MILL AC PAVEMENT (> 3") (DELETED) |
SF |
1 |
| 69 |
AC CURB, TYPE D2-6 |
LF |
22,365 |
| 70 |
AC PAVEMENT |
TON |
13,973 |
| 71 |
AC PAVEMENT (TEMPORARY ACCESS ROAD AND RAMP) |
TON |
1,500 |
| 72 |
AC PAVEMENT (TEMPORARY ACCESS ROAD MAINTENANCE) |
TON |
1,500 |
| 73 |
BASIN DOWN DRAIN |
LF |
2,382 |
| 74 |
CONCRETE DOWN DRAIN INLET |
CY |
30 |
| 75 |
GAUGE BOARD |
EA |
16 |
| 76 |
REINFORCED CONCRETE ACCESS RAMP |
CY |
160 |
| 77 |
REINFORCED CONCRETE BASIN EAST |
LS |
1 |
| 78 |
REINFORCED CONCRETE BASIN WEST |
LS |
1 |
| 79 |
REINFORCED CONCRETE INTAKE CANAL |
CY |
2,190 |
| 80 |
REINFORCED CONCRETE OUTLET STRUCTURE |
EA |
7 |
| 81 |
REINFORCED CONCRETE OUTLET STRUCTURE FOR EAST SETTLING BASIN |
LS |
1 |
| 82 |
REINFORCED CONCRETE OUTLET STRUCTURE FOR WEST SETTLING BASIN |
LS |
1 |
| 83 |
REINFORCED CONCRETE OVERFLOW STRUCTURE EAST SETTLING BASIN |
LS |
1 |
| 84 |
REINFORCED CONCRETE OVERFLOW STRUCTURE WEST SETTLING BASIN |
LS |
1 |
| 85 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 1 |
LS |
1 |
| 86 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 2 |
LS |
1 |
| 87 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 3 |
LS |
1 |
| 88 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 4 |
LS |
1 |
| 89 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 5 |
LS |
1 |
| 90 |
REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 6 |
LS |
1 |
| 91 |
REINFORCED CONCRETE WEIR STRUCTURE EAST |
LS |
1 |
| 92 |
REINFORCED CONCRETE WEIR STRUCTURE WEST |
LS |
1 |
| 93 |
TRANSITION STRUCTURE PER STD PLAN 342 |
EA |
4 |
| 94 |
MANHOLE PER STD PLAN 320 |
EA |
4 |
| 95 |
PCC WALK, 4" THICK |
SF |
72 |
| 96 |
DRIVEWAY PER STD PLAN S-440-4 |
SF |
192 |
| 97 |
GALVANIZED STEEL PICKET FENCE-6 FEET HIGH |
LF |
13,258 |
| 98 |
GALVANIZED STEEL DOUBLE SWING GATE-6-FEET HIGH, 16-FEET LONG |
EA |
2 |
| 99 |
GALVANIZED STEEL SLIDE GATE-6 FEET HIGH |
EA |
8 |
| 100 |
AUTOMATIC SLIDE GATE OPERATOR |
EA |
4 |
| 101 |
ELECTROMAGNETIC GATE LOCK |
EA |
4 |
| 102 |
KEYPAD PER DETAIL"K" |
EA |
4 |
| 103 |
CHAIN LINK FENCE, 5' HIGH (INTAKE CANAL) |
LF |
1,403 |
| 104 |
5' HIGH WALK GATE |
EA |
2 |
| 105 |
EXPANDED METAL CAGE ENCLOSURE FOR LOW FLOW AND CONCRETE LINED BASINS |
EA |
3 |
| 106 |
EXPANDED METAL CAGE ENCLOSURE FOR REINFORCED CONCRETE OVERFLOW STRUCTURE |
EA |
8 |
| 107 |
EXPANDED METAL CAGE ENCLOSURE FOR WEIR |
EA |
2 |
| 108 |
8' - 0" W X 4' - 0" H RCB |
LF |
20 |
| 109 |
8' - 6" W X 3' - 0" H DBL RCB |
LF |
128 |
| 110 |
18" RUBBER GASKETED RCP, 2000 D |
LF |
182 |
| 111 |
36" RUBBER GASKETED RCP, 2000 D |
LF |
342 |
| 112 |
54" RUBBER GASKETED RCP, 2000 D |
LF |
896 |
| 113 |
60" RUBBER GASKETED RCP, 2000 D |
LF |
68 |
| 114 |
72" RUBBER GASKETED RCP, 2000 D |
LF |
745 |
| 115 |
60" CONCRETE COLLAR |
EA |
1 |
| 116 |
JACK 72" RUBBER GASKETED RCP, 3000 D |
LF |
427 |
| 117 |
MECHANICAL WORK |
LS |
1 |
| 118 |
SPECIAL REQUIREMENTS |
LS |
1 |
| 119 |
18" X 18" CAST-IRON SLIDE GATE ASSEMBLY |
EA |
2 |
| 120 |
36" X 36" CAST-IRON SLIDE GATE ASSEMBLY |
EA |
8 |
| 121 |
54" X 54" CAST-IRON SLIDE GATE ASSEMBLY |
EA |
4 |
| 122 |
72" X 48" FABRICATED STAINLESS STEEL SLIDE GATE ASSEMBLY |
EA |
14 |
| 123 |
BEVEL GEAR OPERATOR |
EA |
24 |
| 124 |
MANUALLY OPERATED LIFT |
EA |
4 |
| 125 |
ELECTRIC MOTOR OPERATOR AND APPURTENANCES |
EA |
24 |
| 126 |
SUBMERSIBLE LEVEL TRANSMITTER AND APPURTENANCES |
EA |
8 |
| 127 |
VENT STACK |
EA |
4 |
| 128 |
CONSTRUCT 2" COPPER WATER SERVICE LINE |
LS |
1 |
| 129 |
4" WATERMAIN, .14" THICK STL |
LF |
130 |
| 130 |
2.5" FLUSHOUT HEAD, 200 PSI WWP, WITH HOSE ADAPTER |
EA |
2 |
| 131 |
4" REDUCED PRESSURE PRINCIPLE ASSEMBLY FROM APPROVED USC FOUNDATION FOR CROSS-CONNECTION CONTROL LIST WITH 4' BY 8' STEEL ENCLOSURE |
EA |
2 |
| 132 |
4" GATE VALVE, FLG'D CL 125, 150 PSI WWP WITH HANDWHEEL |
EA |
2 |
| 133 |
4" GATE VALVE, FLG'D CL 125, 150 PSI WWP, NRS, W/ VALVE BOX PER LACWD STD PLAN W-15 |
EA |
2 |
| 134 |
4" STEEL STRUCTURAL SUPPORT PIPE |
LF |
64 |
| 135 |
FABRICATED STEEL AIR GAP ADAPTOR |
EA |
2 |
| 136 |
OVERHEAD HEIGHT CLEARANCE SIGN |
EA |
2 |
| 137 |
ELECTRICAL WORK |
LS |
1 |
| 138 |
TRAFFIC CONTROL |
LS |
1 |
| 139 |
FLASHING ARROW SIGN |
EA |
2 |
| 140 |
CHANGABLE MESSAGE SIGN (DELETED) |
EA |
1 |
| 141 |
OBJECT MARKER PER CALTRANS STD. PLAN A73A |
EA |
22 |
| 142 |
TREE PROTECTION |
EA |
7 |
| 143 |
FURNISH AND PLANT 24" BOX TREE |
EA |
21 |
| 144 |
PLANT ESTABLISHMENT PERIOD |
LS |
1 |