| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
6 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 6 |
RESTORATION OF EXISTING IMPROVEMENTS |
LS |
1 |
| 7 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
| 8 |
OFFICE FACILITIES |
MTH |
7 |
| 9 |
MOBILIZATION |
LS |
1 |
| 10 |
TRENCH BACKFILL SLURRY (CLASS 100-E-100) |
CY |
1,541 |
| 11 |
CATCH BASIN PER STD PLAN 300, W=7 |
EA |
1 |
| 12 |
CATCH BASIN PER STD PLAN 300, W=10 |
EA |
1 |
| 13 |
TRANSITION STRUCTURE PER STD PLAN 340 (MOD) |
EA |
2 |
| 14 |
JUNCTION STRUCTURE PER DETAIL E |
EA |
8 |
| 15 |
JUNCTION STRUCTURE PER DETAIL F |
EA |
4 |
| 16 |
MANHOLE PER STD PLAN 320 (MOD) |
EA |
1 |
| 17 |
MANHOLE PER STD PLAN 321 (MOD) |
EA |
4 |
| 18 |
MANHOLE PER STD PLAN 322 (MOD) |
EA |
8 |
| 19 |
18" DUAL WALL POLYPROPYLENE PIPE |
LF |
22 |
| 20 |
24" DUAL WALL POLYPROPYLENE PIPE |
LF |
28 |
| 21 |
30" DUAL WALL POLYPROPYLENE PIPE |
LF |
2,075 |
| 22 |
36" DUAL WALL POLYPROPYLENE PIPE |
LF |
603 |
| 23 |
48" DUAL WALL POLYPROPYLENE PIPE |
LF |
804 |
| 24 |
SUPPORT FOR 15" OR LESS WATERLINE |
EA |
4 |
| 25 |
SUPPORT FOR 8" OR LESS WATERLINE |
EA |
7 |
| 26 |
SUPPORT FOR 8" AND LESS SEWER |
EA |
2 |
| 27 |
REMODEL SEWER HOUSE CONNECTION |
LF |
57 |
| 28 |
PCC BLANKET PROTECTION FOR SEWER |
CY |
15 |
| 29 |
18" CONCRETE COLLAR |
EA |
15 |
| 30 |
24" CONCRETE COLLAR |
EA |
2 |
| 31 |
30" CONCRETE COLLAR |
EA |
3 |
| 32 |
RESTORATION OF PERMANENT SURFACING |
LS |
1 |
| 33 |
ABANDON EXISTING MANHOLE |
EA |
3 |
| 34 |
TRAFFIC CONTROL |
LS |
1 |
| 35 |
GROUNDWATER DEWATERING (ALLOWANCE OF $150,000) |
AL |
150,000 |