  1. Home
  2. Business Opportunities
  3. Project Summary

Project Summary

RDC0016013
None
Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian Path
Calvary Cemetery Pedestrian Path-E 3rd St/Dennison St.
Walking Path
2/11/2025
3/11/2025
4/4/2025
7/17/2025
3/30/2027
East Los Angeles
Irma Vasquez
(626) 458-4951
Send Email
$8,533,000.00 View Bid Results
Los Angeles Engineering, Inc.
633 North Barranca Avenue
Covina CA 91723
View Plan Holders
Payments
Period EndingPayment Type
03/06/2026 Progress
02/06/2026 Progress
01/06/2026 Progress
12/06/2025 Progress
11/06/2025 Progress
10/06/2025 Progress
09/06/2025 Progress
08/06/2025 Progress
Documents
DocumentNotesDatePagesSize
Award Award Memo 4/3/2025 18 731.41 kb
Bid Summary Bid Summary 3/11/2025 14 479.41 kb
Addendum Addendum No. 1
  • Pg 18 SSPWC SPECS
  • Surveying Services SOP added
  • Facilities for utilities
3/5/2025 4 186.74 kb
Microsoft Teams Online Bid Opening Webcast To join the online bid opening, please click on the following after 11am on the day of the bid openingMicrosoft Teams Online Bid Opening Webcast 2/11/2025 0
Notice Inviting Bids Notice Inviting Bids 1/22/2025 4 27.15 kb
Instructions To Bidders Instructions to Bidders 1/21/2025 20 381.67 kb
Bid Proposal Bid Proposal 1/19/2025 35 299.62 kb
Special Provisions NIB, Special Provisions & Sample Agreement 1/18/2025 521 14.56 Mb
Plans (as advertised) Plans 1/15/2025 103 40.87 Mb

Bid Items
Item Description Unit of Measure Estimated Quantity
1 CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) LS 1
2 CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) MTH 12
3 CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) LS 1
4 IMPLEMENTATION OF THE LTWHP LS 1
5 PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) LS 1
6 IMPLEMENTATION OF THE SWPPP LS 1
7 SHORING OF OPEN EXCAVATIONS LS 1
8 PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $7000) LS 1
9 PREPARATION OF THE DEBRIS CONTAINMENT AND COLLECTION PLAN (STIPULATED UNIT PRICE $1500) LS 1
10 IMPLEMENTATION OF THE DEBRIS CONTAINMENT AND COLLECTION PLAN LS 1
11 PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $1500) LS 1
12 OFFICE FACILITIES MTH 12
13 MOBILIZATION LS 1
14 CLEARING AND GRUBBING LS 1
15 TREE REMOVAL (6"-12" DIAMETER) EA 107
16 CONCRETE REMOVAL (NON-REINFORCED) CY 1,477
17 CONCRETE REMOVAL (REINFORCED) CY 22
18 UNCLASSIFIED EXCAVATION CY 3,925
19 CRUSHED MISCELLANEOUS BASE CY 2,770
20 TRENCH BACKFILL SLURRY (CLASS 100-E-100) CY 397
21 TRENCH BACKFILL SLURRY (CLASS 270-E-500) CY 306
22 AC PAVEMENT TON 15
23 AC PAVEMENT(PATCH BACK) TON 619
24 ADJUST MANHOLE EA 7
25 PCC PAVEMENT CY 9
26 CURB DRAIN PER STD PLAN 150, N=1, CASE 1 INLET EA 116
27 PCC CURB, TYPE A1-VAR LF 155
28 PCC CURB & GUTTER, TYPE A2-6 LF 4,853
29 PCC CURB & GUTTER, TYPE A2-8 LF 5,084
30 PCC CURB & GUTTER, TYPE A2-VAR LF 20
31 LONGITUDINAL GUTTER CY 2
32 PCC WALK, 4" THICK SF 52,563
33 PCC CURB RAMPS CY 54
34 PCC WALK & CURB RAMPS, 4" THICK SF 130
35 PCC DRIVEWAYS, 6" THICK SF 1,410
36 DETECTABLE WARNING SURFACE SF 205
37 WATERMETER VAULT EA 4
38 1-1/2" CONDUIT (SCH 80 PVC) LF 498
39 1-1/2" CONDUIT (GRC) LF 5
40 2" CONDUIT (SCH 80 PVC) LF 165
41 2-1/2" CONDUIT (GRC) LF 20
42 3" CONDUIT (SCH 80 PVC) LF 15,544
43 2-PAIR DETECTOR LEAD-IN CABLE LF 1,105
44 INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT LF 270
45 4-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) EA 1
46 REMOVE CONTROLLER EA 1
47 REMOVE PULL BOX AND RESURFACE SIDEWALK EA 1
48 REMOVE VEHICLE HEAD (COMPLETE) EA 3
49 REMOVE TYPE 1 FOUNDATION EA 1
50 REMOVE TYPE 15 FOUNDATION EA 1
51 REMOVE TYPE 17 FOUNDATION EA 1
52 REWIRE CONTROLLER CABINET EA 2
53 25' SIGNAL MAST ARM EA 1
54 12' LUMINAIRE MAST ARM EA 2
55 6' LUMINAIRE MAST ARM EA 1
56 INSTALL 6' LUMINAIRE MAST ARM EA 24
57 PEDESTRIAN PUSH BUTTON EA 3
58 PEDESTRIAN PUSH BUTTON PLATE EA 3
59 RETROREFLECTIVE STREET NAME SIGN EA 1
60 3-12" LED VEHICLE HEAD (COMPLETE) EA 5
61 5-12" LED VEHICLE HEAD (COMPLETE) EA 2
62 DETAIL 21 (ONE-COAT PAINT) LF 315
63 DETAIL 28 (ONE-COAT PAINT) LF 103
64 DETAIL 31 (ONE-COAT PAINT) LF 2,788
65 DETAIL 8 (ONE-COAT PAINT) LF 90
66 DETAIL 22 (THERMOPLASTIC) LF 3,309
67 DETAIL 25 (THERMOPLASTIC) LF 594
68 DETAIL 27 (THERMOPLASTIC) LF 10
69 DETAIL 29 (THERMOPLASTIC) LF 726
70 DETAIL 32 (THERMOPLASTIC) LF 5,824
71 DETAIL 38 (THERMOPLASTIC) LF 1,011
72 DETAIL 41 (THERMOPLASTIC) LF 67
73 DETAIL 9 (THERMOPLASTIC) LF 8,086
74 DETAIL 38A (ONE-COAT PAINT) LF 201
75 DETAIL 27B (ONE-COAT PAINT) LF 12,283
76 DETAIL 27B (THERMOPLASTIC) LF 1,099
77 PAVEMENT MARKINGS (ONE-COAT PAINT) SF 214
78 PAVEMENT MARKINGS (THERMOPLASTIC) SF 1,902
79 12" STRIPING (THERMOPLASTIC) LF 913
80 24" STRIPING (THERMOPLASTIC) LF 1,762
81 4" STRIPING (THERMOPLASTIC) LF 1,755
82 6" STRIPING (THERMOPLASTIC) LF 28
83 REMOVE DETAIL 21 (PAINT) LF 315
84 REMOVE DETAIL 28 (PAINT) LF 103
85 REMOVE DETAIL 31 (PAINT) LF 2,788
86 REMOVE DETAIL 8 (PAINT) LF 90
87 REMOVE DETAIL 22 (THERMOPLASTIC) LF 3,827
88 REMOVE DETAIL 24 (THERMOPLASTIC) LF 574
89 REMOVE DETAIL 25 (THERMOPLASTIC) LF 593
90 REMOVE DETAIL 29 (THERMOPLASTIC) LF 358
91 REMOVE DETAIL 32 (THERMOPLASTIC) LF 5,262
92 REMOVE DETAIL 38 (THERMOPLASTIC) LF 657
93 REMOVE DETAIL 9 (THERMOPLASTIC) LF 11,441
94 REMOVE DETAIL 38A (PAINT) LF 51
95 REMOVE DETAIL 27B (PAINT) LF 12,283
96 REMOVE PAVEMENT MARKINGS (PAINT) SF 30
97 REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) SF 838
98 REMOVE 12" STRIPING (THERMOPLASTIC) LF 1,755
99 REMOVE 4" STRIPING (THERMOPLASTIC) LF 2,028
100 REMOVE 8" STRIPING (THERMOPLASTIC) LF 15
101 SIGN PANEL EA 7
102 INSTALL ONE-POST (ROADSIDE SIGN) EA 19
103 INSTALL SIGN (STRAP AND SADDLE BRACKET) EA 7
104 RELOCATE SIGN EA 66
105 REMOVE SIGN EA 16
106 REMOVE SIGN POST EA 5
107 TRAFFIC CONTROL LS 1
108 CHANGEABLE MESSAGE SIGN EA 2
109 IRRIGATION SYSTEM LS 1
110 LITTER RECEPTACLE* EA 26
111 DECOMPOSED GRANITE, 3" THICK* SF 1,997
112 INTERCEPT CONDUIT EA 2
113 3" CONDUIT LF 572
114 TYPE 19 STANDARD FOUNDATION EA 1
115 REMOVE PULL BOX EA 10
116 TYPE 15TS STANDARD FOUNDATION EA 2
117 PLATE HOLE TO SMOOTH FINISH EA 1
118 RECONSTRUCT CATCH BASIN EA 4
119 PET WASTE STATION EA 12
120 REMOVE DLC WIRING LF 772
121 ADJUST PULL BOX EA 15
122 PCC LOCAL DEPRESSION CY 4
123 LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) EA 3
124 RECONSTRUCT DRAINAGE STRUCTURE EA 1
125 RUBBER WALKWAY SF 47,489
126 TREE BUBBLER EA 236
127 INTERCEPT CONDUIT EA 2
128 REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) NEAR OVERHEAD HIGH VOLTAGE EA 1
129 REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) NEAR OVERHEAD HIGH VOLTAGE EA 1
130 LED LUMINAIRES (200W HPS EQUIVALENT) EA 3
131 REALIGN VIDEO DETECTION ZONE EA 1
132 REMOVE TYPE 1-A STANDARD (COMPLETE) (EXCL. FOUND.) EA 1
133 INSTALL STREETLIGHT POLE EA 24
134 ADJUST PULL BOX EA 8
135 NOX AND PM10 REDUCTION MONTHLY REPORTS (STIPULATED UNIT PRICE OF $500/MONTH) MTH 12
136 TYPE 15 STANDARD EA 1
137 REWIRE INTERSECTION LS 1
138 REMOVE CONFLICT MONITOR EA 1
139 TYPE 2010 CONFLICT MONITOR EA 1
140 PED PUSH BUTTON POST EA 1
141 PED PUSH BUTTON POST FOUNDATION EA 2
142 COMPOSITE TYPE 2 PULL BOX EA 4
143 COMPOSITE TYPE 3 PULL BOX EA 2
144 PROTECT EXISTING INTERCONNECT CABLE LS 1
145 TYPE 19 STANDARD NEAR HIGH VOLTAGE LINES (COMPLETE) (EXCL. FOUND.) EA 1
146 REMOVE TREE WELL EA 127
147 ELECTRIC METER EA 1
148 LED LUMINAIRE (150W HPS EQUIVALENT) EA 24
149 CONCRETE STREETLIGHT POLE EA 24
150 LITTER RECEPTACLE INSTALLATION EA 26
151 PET WASTE STATION INSTALLATION EA 12
152 SERVICE CONNECTION (SCE) EA 8
153 CONCRETE STREETLIGHT FOUNDATION (30"SQX48"DEEP) EA 24
154 PULL BOX TYPE 2 WITH COVER EA 125
155 PULL BOX TYPE 3 WITH COVER EA 13
156 NO. 8 CONDUCTORS LF 77,600
157 NO. 10 CONDUCTORS LF 980
158 CONCRETE PEDESTRIAN LIGHT FOUNDATION EA 74
159 INSTALL PEDESTRIAN LIGHT POLE EA 74
160 RELOCATE PEDESTRIAN PUSH BUTTON INCLUDING WIRING EA 1
161 6' LUMINAIRE ARM (STREETLIGHTS) EA 24
162 TREE WITH TREE WELL PER MOD STD PLAN 519 EA 118
163 PEDESTRIAN STREET LIGHT POLE WITH POST TOP LUMINAIRE EA 74
164 TYPE 2070 CONTROLLER WITH D4 SOFTWARE EA 1
165 REMOVE BUS SHELTER & REINSTALL AFTER CONSTRUCTION INCLUDING ELECTRICAL AND SIGNAGE EA 1
166 REMOVE GPS UNIT EA 1
167 RELOCATE PED PUSH BUTTON POST (COMPLETE) EA 1
168 REMOVE PED PUSH BUTTON POST FOUNDATION EA 1
169 PED PUSH BUTTON EA 1
170 PED PUSH BUTTON PLATE EA 2
171 REMOVE ILD SENSOR UNITS EA 7
172 TYPE 15 STANDARD (NEAR HIGH VOLTAGE) EA 1
173 13' WIDE CONTINENTAL CROSSWALK LF 230
174 SURVEYING SERVICES LS 1

* denotes Final Pay Item

Adobe Acrobat Reader is required to view (.pdf) documents.
Click on logo below to download Adobe Acrobat Reader.
Adobe Acrobat
  • lacounty.gov
  • Public Works FAQ
  • Privacy - Terms of Use
  • ADA / Accessibility
  • Feedback
  • Feedback

Translate