| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
3 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 5 |
OFFICE FACILITIES |
MTH |
4 |
| 6 |
MOBILIZATION |
LS |
1 |
| 7 |
TRAFFIC CONTROL |
LS |
1 |
| 8 |
CLEARING AND GRUBBING |
LS |
1 |
| 9 |
TREE REMOVAL (6"-12" DIAMETER) |
EA |
4 |
| 10 |
UNCLASSIFIED EXCAVATION |
CY |
78 |
| 11 |
UNCLASSIFIED EXCAVATION (INVERTED SHOULDERS) |
CY |
12 |
| 12 |
STRUCTURE EXCAVATION (RETAINING WALL)* |
CY |
167 |
| 13 |
STRUCTURE BACKFILL (RETAINING WALL)* |
CY |
34 |
| 14 |
NO. 3 CONCRETE AGGREGATE |
CY |
6 |
| 15 |
TRENCH BACKFILL SLURRY (CLASS 100-E-100)* |
CY |
52 |
| 16 |
AC PAVEMENT |
TON |
24 |
| 17 |
STRUCTURE CONCRETE (RETAINING WALL)* |
CY |
53 |
| 18 |
BAR REINFORCING STEEL* |
LB |
8,000 |
| 19 |
CABLE RAILING (CALTRANS STD PLAN B11-47) |
LF |
96 |
| 20 |
CONST & REMOVE TEMP CHAIN LINK FENCE |
LF |
160 |
| 21 |
STRUCTURE CONCRETE (CIDH PILES)* |
CY |
90 |
| 22 |
INSTALL STEEL PILE |
EA |
11 |
| 23 |
DRILL PILE HOLES, 36" DIA |
LF |
561 |
| 24 |
FURNISH STEEL PILES |
LB |
137,500 |
| 25 |
MISCELLANEOUS METAL (RETAINING WALL)* |
LB |
180 |
| 26 |
PREFABRICATED DRAINAGE COMPOSITE |
SF |
960 |
| 27 |
TIMBER LAGGING* |
MBF |
7 |
| 28 |
CONCRETE SURFACE TEXTURE |
SF |
865 |
| 29 |
NON-WOVEN GEOTEXTILE FABRIC |
SY |
65 |
| 30 |
6" DIAMETER PVC PIPE, SCH 80* |
LF |
125 |
| 31 |
MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) |
LF |
163 |
| 32 |
IN-LINE TERMINAL SYSTEM (TYPE MSKT-SP-MGS) |
EA |
2 |
| 33 |
SHOULDER GRADING |
LF |
333 |
| 34 |
CONCRETE VEGETATION CONTROL (PER CALTRANS STD PLAN A77N5) |
EA |
15 |
| 35 |
HMA DIKE PER CALTRANS STD PLAN A87B |
LF |
333 |
| 36 |
DELINEATOR PER CALTRANS STD PLAN A77N4 |
EA |
11 |