| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
5 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
PREPARATION OF THE BMP PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 6 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 7 |
PREPARATION OF THE TREATED WOOD WASTE (TWW) PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 8 |
OFFICE FACILITIES |
MTH |
6 |
| 9 |
MOBILIZATION |
LS |
1 |
| 10 |
CLEARING AND GRUBBING |
LS |
1 |
| 11 |
UNCLASSIFIED EXCAVATION |
CY |
539 |
| 12 |
AC PAVEMENT |
TON |
195 |
| 13 |
AC DIKE PER CALTRANS STD PLAN A87B |
LF |
2,698 |
| 14 |
REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) |
LF |
6,269 |
| 15 |
RELOCATE EXISTING K-RAIL |
EA |
4 |
| 16 |
TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
LB |
87,793 |
| 17 |
MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) |
LF |
5,300 |
| 18 |
MIDWEST GUARDRAIL SYSTEM END ANCHOR ASSEMBLY (TYPE SFT) PER STD PLAN A77S1 |
EA |
10 |
| 19 |
MIDWEST GUARDRAIL SYSTEM BURIED POST END ANCHOR PER STD PLAN A77T2 |
EA |
6 |
| 20 |
MIDWEST GUARDRAIL SYSTEM END CAP PER CALTRANS STANDARD PLAN A77M1 (TYPE A) |
EA |
1 |
| 21 |
RAILING DELINEATION PER CALTRANS STD PLAN A77N4 |
EA |
261 |
| 22 |
IN-LINE TERMINAL SYSTEM (MAX-TENSION TL-2) |
EA |
11 |
| 23 |
IN-LINE TERMINAL SYSTEM (MSKT TL-2) |
EA |
30 |
| 24 |
IN-LINE TERMINAL SYSTEM (MSKT TL-3) |
EA |
4 |
| 25 |
IN-LINE TERMINAL SYSTEM (SOFTSTOP TL-2) |
EA |
4 |
| 26 |
TRANSITION RAILING (TYPE AGT) |
EA |
3 |
| 27 |
MINOR CONCRETE AND BLOCK-OUT MATERIAL PER CALTRANS STD PLAN A77N5 |
EA |
213 |
| 28 |
MINOR CONCRETE VEGETATION CONTROL |
SY |
4,335 |
| 29 |
TRAFFIC CONTROL |
LS |
1 |