| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.10
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.24
| 12 | MTH | $500.00 | $500.00 |
$6,000.00
| $500.00 | $500.00 |
| 001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.04
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.13
| 1 | LS | $10,000.00 | $3,300.00 |
$3,300.00
| $23,860.00 | $25,000.00 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
0.53
| 1 | LS | $25,000.00 | $13,000.00 |
$13,000.00
| $42,200.00 | $39,000.00 |
| 001.08.005 | OFFICE FACILITIES |
1.70
| 12 | MTH | $10,000.00 | $3,500.00 |
$42,000.00
| $4,800.00 | $4,000.00 |
| 001.09.003 | MOBILIZATION |
11.11
| 1 | LS | $200,000.00 | $275,000.00 |
$275,000.00
| $241,400.00 | $259,000.00 |
| 300.01.003 | CLEARING AND GRUBBING |
1.21
| 1 | LS | $40,000.00 | $30,000.00 |
$30,000.00
| $123,983.55 | $48,000.00 |
| 300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
1.68
| 49 | CY | $260.00 | $850.00 |
$41,650.00
| $550.60 | $453.00 |
| 300.02.003 | UNCLASSIFIED EXCAVATION |
8.16
| 985 | CY | $200.00 | $205.00 |
$201,925.00
| $227.20 | $205.00 |
| 301.02.005 | CRUSHED MISCELLANEOUS BASE |
2.50
| 309 | CY | $210.00 | $200.00 |
$61,800.00
| $196.00 | $200.00 |
| 302.01.005 | COLD MILL AC PAVEMENT (0 - 1-1/2") |
2.77
| 162929 | SF | $0.40 | $0.42 |
$68,430.18
| $0.45 | $0.40 |
| 302.01.007 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
1.49
| 64687 | SF | $0.60 | $0.57 |
$36,871.59
| $0.69 | $0.57 |
| 302.05.007 | AC CURB, TYPE D1-6 |
0.38
| 270 | LF | $30.00 | $35.00 |
$9,450.00
| $33.80 | $30.00 |
| 302.05.009 | AC CURB, TYPE D1-VAR |
0.03
| 18 | LF | $60.00 | $45.00 |
$810.00
| $42.00 | $45.00 |
| 302.05.013 | AC PAVEMENT |
7.93
| 1266 | TON | $240.00 | $155.00 |
$196,230.00
| $174.00 | $180.00 |
| 302.05.014 | AC PAVEMENT(PATCH BACK) |
1.29
| 57 | TON | $260.00 | $560.00 |
$31,920.00
| $327.60 | $298.00 |
| 302.05.017 | AC PAVEMENT(INVERTED SHOULDERS) |
0.18
| 8 | TON | $700.00 | $560.00 |
$4,480.00
| $627.00 | $560.00 |
| 302.05.018 | AC PAVEMENT(DIGOUTS) |
0.18
| 8 | TON | $900.00 | $560.00 |
$4,480.00
| $642.00 | $610.00 |
| 302.05.023 | RECONSTRUCT MANHOLE |
1.87
| 12 | EA | $3,000.00 | $3,850.00 |
$46,200.00
| $3,680.00 | $3,850.00 |
| 302.06.003 | PCC PAVEMENT |
0.76
| 15 | CY | $840.00 | $1,250.00 |
$18,750.00
| $1,138.40 | $1,200.00 |
| 302.09.003 | ASPHALT RUBBER HOT MIX |
16.41
| 2137 | TON | $180.00 | $190.00 |
$406,030.00
| $184.00 | $190.00 |
| 303.05.003 | PCC CURB, TYPE A1-6 |
0.17
| 60 | LF | $50.00 | $70.00 |
$4,200.00
| $70.00 | $65.00 |
| 303.05.004 | PCC CURB, TYPE A1-8 |
0.03
| 10 | LF | $60.00 | $80.00 |
$800.00
| $84.00 | $80.00 |
| 303.05.005 | PCC CURB, TYPE A1-VAR |
0.38
| 111 | LF | $70.00 | $85.00 |
$9,435.00
| $83.80 | $85.00 |
| 303.05.009 | PCC CURB & GUTTER, TYPE A2-6 |
0.24
| 56 | LF | $120.00 | $105.00 |
$5,880.00
| $117.60 | $105.00 |
| 303.05.010 | PCC CURB & GUTTER, TYPE A2-8 |
0.05
| 10 | LF | $140.00 | $130.00 |
$1,300.00
| $128.00 | $126.00 |
| 303.05.011 | PCC CURB & GUTTER, TYPE A2-VAR |
0.15
| 27 | LF | $150.00 | $135.00 |
$3,645.00
| $129.20 | $127.00 |
| 303.05.021 | PCC CURB, TYPE C1-6 |
0.13
| 54 | LF | $70.00 | $60.00 |
$3,240.00
| $82.20 | $65.00 |
| 303.05.043 | PCC WALK, 4" THICK |
2.06
| 2316 | SF | $15.00 | $22.00 |
$50,952.00
| $20.20 | $15.00 |
| 303.05.050 | PCC CURB RAMPS |
0.41
| 6 | CY | $2,500.00 | $1,700.00 |
$10,200.00
| $1,860.00 | $1,700.00 |
| 303.05.055 | PCC DRIVEWAYS, 6" THICK |
0.39
| 244 | SF | $20.00 | $40.00 |
$9,760.00
| $31.20 | $25.00 |
| 303.05.059 | DETECTABLE WARNING SURFACE |
0.45
| 105 | SF | $80.00 | $105.00 |
$11,025.00
| $79.20 | $80.00 |
| 304.06.003 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) |
0.66
| 738 | LF | $20.00 | $22.00 |
$16,236.00
| $38.88 | $22.00 |
| 304.06.005 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL END TREATMENT AND CONCRETE FOOTING (INCLUDING POSTS) |
0.31
| 88 | LF | $120.00 | $88.00 |
$7,744.00
| $91.20 | $88.00 |
| 304.06.009 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.46
| 20645 | LB | $1.00 | $0.55 |
$11,354.75
| $1.15 | $0.55 |
| 304.06.019 | MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) |
3.85
| 800 | LF | $70.00 | $119.00 |
$95,200.00
| $148.80 | $119.00 |
| 304.06.043 | MIDWEST GUARDRAIL SYSTEM END ANCHOR ASSEMBLY (TYPE SFT) PER STD PLAN A77S1 |
0.11
| 1 | EA | $1,500.00 | $2,600.00 |
$2,600.00
| $5,209.00 | $2,600.00 |
| 307.02.003 | 1" CONDUIT (SCH 80 PVC) |
0.10
| 43 | LF | $60.00 | $55.00 |
$2,365.00
| $67.00 | $55.00 |
| 307.02.011 | 2" CONDUIT (SCH 80 PVC) |
0.12
| 15 | LF | $66.00 | $190.00 |
$2,850.00
| $154.80 | $172.00 |
| 307.02.021 | 3" CONDUIT (SCH 80 PVC) |
0.72
| 142 | LF | $72.00 | $125.00 |
$17,750.00
| $156.20 | $125.00 |
| 307.02.039 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.13
| 465 | LF | $12.00 | $7.00 |
$3,255.00
| $8.08 | $7.00 |
| 307.02.039 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.10
| 590 | LF | $7.00 | $4.00 |
$2,360.00
| $4.28 | $4.00 |
| 307.02.039 | 5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.04
| 85 | LF | $10.00 | $13.00 |
$1,105.00
| $10.12 | $12.00 |
| 307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.58
| 260 | LF | $35.00 | $55.00 |
$14,300.00
| $50.00 | $51.00 |
| 307.02.156 | REMOVE TYPE 15 FOUNDATION |
0.27
| 2 | EA | $5,000.00 | $3,400.00 |
$6,800.00
| $3,398.00 | $3,390.00 |
| 307.04.501 | TYPE 15 STANDARD |
0.72
| 2 | EA | $6,000.00 | $8,900.00 |
$17,800.00
| $8,874.00 | $8,670.00 |
| 307.04.503 | TYPE 15 STANDARD FOUNDATION |
0.44
| 2 | EA | $3,000.00 | $5,400.00 |
$10,800.00
| $5,324.00 | $5,220.00 |
| 307.04.518 | PEDESTRIAN PUSH BUTTON PLATE |
0.04
| 6 | EA | $200.00 | $170.00 |
$1,020.00
| $122.20 | $156.00 |
| 307.04.519 | PEDESTRIAN PUSH BUTTON POST |
0.21
| 4 | EA | $1,200.00 | $1,275.00 |
$5,100.00
| $1,353.40 | $1,252.00 |
| 307.04.521 | PEDESTRIAN PUSH BUTTON POST FOUNDATION |
0.15
| 4 | EA | $1,500.00 | $950.00 |
$3,800.00
| $1,390.40 | $950.00 |
| 307.04.532 | 3-12" LED VEHICLE HEAD (COMPLETE) |
0.37
| 5 | EA | $1,750.00 | $1,850.00 |
$9,250.00
| $1,921.80 | $1,787.00 |
| 601.09.011 | TRAFFIC CONTROL |
14.55
| 1 | LS | $150,000.00 | $360,000.00 |
$360,000.00
| $381,516.80 | $372,584.00 |
| 601.09.019 | CHANGEABLE MESSAGE SIGN |
0.42
| 4 | EA | $5,000.00 | $2,600.00 |
$10,400.00
| $5,027.00 | $5,000.00 |
| 801.06.017 | RIVER ROCK PAVING |
0.60
| 390 | SF | $30.00 | $38.00 |
$14,820.00
| $45.00 | $42.00 |
| | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) NEAR OVERHEAD HIGH VOLTAGE |
0.15
| 2 | EA | $6,000.00 | $1,800.00 |
$3,600.00
| $5,848.00 | $1,800.00 |
| | ROUTER EXTENDED SERVICE AGREEMENT |
0.12
| 1 | EA | $2,100.00 | $2,860.00 |
$2,860.00
| $3,648.20 | $2,860.00 |
| | ROUTER POWER SUPPLY |
0.03
| 1 | EA | $300.00 | $745.00 |
$745.00
| $790.00 | $745.00 |
| | TEMPORARY AC PAVEMENT (PATCH BACK) |
0.02
| 1 | TON | $260.00 | $560.00 |
$560.00
| $888.00 | $560.00 |
| | TEMPORARY TYPE 15TS STANDARD |
0.44
| 1 | EA | $5,175.00 | $11,000.00 |
$11,000.00
| $8,580.00 | $11,000.00 |
| | TRANSPORTATION OMNIDIRECTIONAL 5-ELEMENT ANTENNA FOR 2G, 3G, 4G CELLULAR, GPS, AND DUAL-BAND WIFI 2.4 GHZ AND 5GHZ |
0.15
| 2 | EA | $850.00 | $1,850.00 |
$3,700.00
| $3,972.20 | $1,850.00 |
| | TYPE 2 COMPOSITE PULL BOX WITH EXTENSION AND CRUSHED AGGREGATE BASE INCLUDING COVER |
0.16
| 2 | EA | $1,800.00 | $1,930.00 |
$3,860.00
| $2,181.00 | $1,930.00 |
| | TYPE 3 COMPOSITE PULL BOX WITH EXTENSION AND CRUSHED AGGREGATE BASE INCLUDING COVER |
0.48
| 5 | EA | $2,000.00 | $2,400.00 |
$12,000.00
| $2,789.00 | $2,400.00 |
| | #10 WIRE |
0.05
| 570 | LF | $6.00 | $2.00 |
$1,140.00
| $2.42 | $2.00 |
| | #6 WIRE |
0.01
| 30 | LF | $4.00 | $7.00 |
$210.00
| $6.00 | $6.40 |
| | 12' RG-58/U RF CABLE ASSEMBLY (N-MALE, TNC-MALE) |
0.09
| 2 | EA | $250.00 | $1,065.00 |
$2,130.00
| $2,664.00 | $1,035.00 |
| | 5/8" HOLE, 1-1/8"-18 THREAD, THICK PLATE MOUNT FOR ANTENNA |
0.05
| 2 | EA | $250.00 | $670.00 |
$1,340.00
| $766.40 | $670.00 |
| | 8' STRAIGHT LUMINAIRE MAST ARM |
0.30
| 3 | EA | $1,800.00 | $2,450.00 |
$7,350.00
| $2,382.00 | $2,375.00 |
| | AC PAVEMENT (SIDEWALK) |
1.11
| 49 | TON | $250.00 | $560.00 |
$27,440.00
| $342.00 | $329.00 |
| | BATTERY BACKUP SYSTEM (COMPLETE) |
1.09
| 1 | EA | $20,000.00 | $27,000.00 |
$27,000.00
| $24,800.00 | $26,000.00 |
| | APS PPB WITH SPECIAL VOICE MESSAGE |
0.70
| 6 | EA | $4,000.00 | $2,900.00 |
$17,400.00
| $2,741.00 | $2,789.00 |
| | CENTRAL CONTROLLER UNIT APS |
0.61
| 1 | EA | $10,500.00 | $15,000.00 |
$15,000.00
| $11,444.80 | $14,000.00 |
| | CELL PHONE COMMUNICATION EQUIPMENT |
0.25
| 1 | EA | $6,000.00 | $6,200.00 |
$6,200.00
| $9,040.00 | $6,200.00 |
| | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $15,000) |
0.61
| 15000 | AL | $1.00 | $1.00 |
$15,000.00
| $1.00 | $1.00 |
| | DELINEATOR PER CALTRANS STD PLAN A73C, CLASS 1, TYPE F |
0.31
| 41 | EA | $90.00 | $190.00 |
$7,790.00
| $178.80 | $190.00 |
| | IN-LINE TERMINAL SYSTEM (TYPE MSKT TL-2) |
1.74
| 7 | EA | $10,000.00 | $6,150.00 |
$43,050.00
| $6,068.00 | $5,990.00 |
| | INDUSTRIAL INTEGRATED SERVICES ROUTER |
0.11
| 1 | EA | $3,800.00 | $2,800.00 |
$2,800.00
| $7,056.20 | $2,800.00 |
| | LED LUMINAIRES (100W HPS EQUIVALENT) |
0.10
| 3 | EA | $1,100.00 | $790.00 |
$2,370.00
| $1,029.20 | $790.00 |
| | LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) |
0.18
| 3 | EA | $1,300.00 | $1,500.00 |
$4,500.00
| $1,557.00 | $1,459.00 |
| | MODIFY TYPE 17 STANDARD TO HEIGHT OF 23' |
0.44
| 1 | LS | $5,000.00 | $10,800.00 |
$10,800.00
| $10,240.00 | $10,500.00 |
| | PCC CURB, TYPE A1-6 (MOD) |
0.05
| 18 | LF | $50.00 | $75.00 |
$1,350.00
| $82.20 | $75.00 |
| | PCC CURB, TYPE A1-VAR (MOD) |
0.05
| 12 | LF | $70.00 | $105.00 |
$1,260.00
| $88.60 | $103.00 |
| | REMOVE PEDESTRIAN PUSH BUTTON POST FOUNDATION |
0.03
| 1 | EA | $600.00 | $650.00 |
$650.00
| $960.00 | $650.00 |
| | REMOVE PEDESTRIAN PUSH BUTTON POST (COMPLETE)(EXCL. FOUND.) |
0.01
| 1 | EA | $500.00 | $285.00 |
$285.00
| $504.40 | $285.00 |
| | REMOVE PULL BOX |
0.09
| 7 | EA | $1,500.00 | $310.00 |
$2,170.00
| $382.00 | $310.00 |
| | REMOVE PEDESTRIAN PUSH BUTTON AND PLATE HOLE TO SMOOTH FINISH |
0.04
| 2 | EA | $250.00 | $440.00 |
$880.00
| $423.40 | $427.00 |
| | RELOCATE VIDEO DETECTION CAMERA |
0.15
| 2 | EA | $1,800.00 | $1,900.00 |
$3,800.00
| $3,565.40 | $1,900.00 |
| | RECONFIG VIDEO DETECTION ZONE - 1 CAMERA |
0.11
| 2 | EA | $4,000.00 | $1,325.00 |
$2,650.00
| $2,782.40 | $1,325.00 |
| | PREPARATION OF THE TWW WORKPLAN (STIPULATED PRICE OF $2500) |
0.10
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| | Total Percent | 100 | | | | Total Amount | $2,474,563.52 | | |