Bid Price History

Marvin Braude Bike Path at Dockweiler Beach Rpr Off-System (JAN 8 2023 WINTER STM)
$1,125,300.00
11/18/2025
702 (B5)
9
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.22 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.003CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.09 2MTH$500.00$500.00 $1,000.00 $500.00$500.00
001.06.007CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.09 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.07.005PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) 0.22 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.07.007IMPLEMENTATION OF THE SWPPP 4.44 1LS$25,000.00$50,000.00 $50,000.00 $65,955.56$39,000.00
001.08.005OFFICE FACILITIES 2.67 2MTH$3,500.00$15,000.00 $30,000.00 $12,333.33$10,000.00
001.09.003MOBILIZATION 9.78 1LS$127,000.00$110,000.00 $110,000.00 $129,238.17$130,600.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 8.93 335CY$300.00$300.00 $100,500.00 $424.83$400.00
300.01.067CONCRETE REMOVAL (REINFORCED) 2.67 60CY$325.00$500.00 $30,000.00 $550.06$500.00
300.02.003UNCLASSIFIED EXCAVATION 12.02 902CY$175.00$150.00 $135,300.00 $141.67$150.00
300.10.003STABILIZATION GEOTEXTILE 0.67 1518SY$10.00$5.00 $7,590.00 $16.31$15.00
301.02.005CRUSHED MISCELLANEOUS BASE 4.72 236CY$190.00$225.00 $53,100.00 $207.22$174.00
302.06.003PCC PAVEMENT 23.76 382CY$1,025.00$700.00 $267,400.00 $1,073.47$900.00
304.03.015CONST & REMOVE TEMP CHAIN LINK FENCE 2.20 496LF$40.00$50.00 $24,800.00 $36.78$29.00
601.09.011TRAFFIC CONTROL 10.48 1LS$25,000.00$117,932.00 $117,932.00 $82,644.44$50,000.00
601.09.015TEMPORARY RAILING (TYPE K) 2.75 476LF$95.00$65.00 $30,940.00 $111.14$104.50
 5' X 10' X 1" THICK STEEL PLATE (STAGING AREA) 8.07 12978SF$27.00$7.00 $90,846.00 $12.36$11.60
 REINFORCED POLYETHYLENE GEOMEMBRANE 3 11264SF$5.00$3.00 $33,792.00 $7.51$3.00
 UNCLASSIFIED EXCAVATION (STAGING AREA) 3.21 361CY$175.00$100.00 $36,100.00 $181.94$170.00
 Total Percent100   Total Amount$1,125,300.00