Bid Price History

Avenue J-12 and 50th Street West Site Improvements Well 4-91
$4,587,457.00
11/05/2024
4104 (H1)
5
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.05 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.003CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.10 9MTH$500.00$500.00 $4,500.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.02 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.17 1LS$10,000.00$8,000.00 $8,000.00 $65,600.00$20,000.00
001.07.003IMPLEMENTATION OF BMPS 0.76 1LS$15,000.00$35,000.00 $35,000.00 $45,400.00$35,000.00
001.07.021SHORING OF OPEN EXCAVATIONS 0.04 1LS$12,000.00$2,000.00 $2,000.00 $46,370.00$50,000.00
001.07.047PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $5000) 0.11 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.07.049IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN 0.20 1LS$10,000.00$8,965.00 $8,965.00 $18,093.00$10,000.00
001.07.051REMOVAL AND DISPOSAL OF NON-HAZARDOUS ASBESTOS WASTE 0.43 1LS$5,000.00$19,860.00 $19,860.00 $75,972.00$40,000.00
001.08.005OFFICE FACILITIES 0.65 10MTH$5,000.00$3,000.00 $30,000.00 $4,300.00$3,000.00
001.09.003MOBILIZATION 13.60 1LS$200,000.00$624,020.00 $624,020.00 $416,791.40$500,000.00
303.01.003STRUCTURE CONCRETE 3.17 121CY$930.00$1,200.00 $145,200.00 $1,780.00$1,500.00
500.00.015VIDEO INSPECTION 0.08 1LS$7,000.00$3,500.00 $3,500.00 $9,000.00$5,000.00
900.02.025BARRICADE POSTS, STD PLAN W-14 0.11 4EA$1,150.00$1,250.00 $5,000.00 $2,790.00$2,000.00
900.03.047VIDEO CAMERA SURVEY 0.06 1EA$7,000.00$2,750.00 $2,750.00 $5,790.00$3,200.00
 6" CRUSHED ROCK 0.05 3CY$300.00$750.00 $2,250.00 $1,760.00$1,000.00
 2" DEEP WELL AIR RELEASE/VACUUM VALVE 0.22 1EA$8,000.00$10,242.00 $10,242.00 $12,348.40$10,242.00
 12" HDPE PIPE 0.03 15LF$250.00$85.00 $1,275.00 $717.00$700.00
 AQUIFER STEP-DRAWDOWN TEST (SHORT DURATION) 0.17 1EA$4,200.00$7,920.00 $7,920.00 $19,804.00$8,600.00
 ANALYSIS OF GROUNDWATER SAMPLES 0.54 3EA$3,000.00$8,250.00 $24,750.00 $10,150.00$9,000.00
 AIR VENT TUBE 0.02 20LF$30.00$55.00 $1,100.00 $155.60$63.00
 ABANDON PILOT BOREHOLE 0.36 1EA$7,000.00$16,500.00 $16,500.00 $19,300.00$18,000.00
 8" WATERMAIN, D.I. 4.78 1016LF$350.00$216.00 $219,456.00 $231.60$216.00
 8" FLOW METER 0.25 1EA$6,000.00$11,346.00 $11,346.00 $12,869.20$15,000.00
 8" GATE VALVE, FLG'D, 200 PSI WWP, CL 125 0.15 1EA$3,750.00$6,740.00 $6,740.00 $13,048.00$7,000.00
 8" CHECK VALVE, FLG'D CL 125 0.75 1EA$5,000.00$34,290.00 $34,290.00 $21,858.00$25,000.00
 8" CML & C STL PIPE, 0.25" WALL THICKNESS, WELDED 0.77 12LF$525.00$2,950.00 $35,400.00 $2,130.00$2,000.00
 8" CML STL PIPE, 0.25" WALL THICKNESS (WELL 4-91) 2.19 25LF$525.00$4,025.00 $100,625.00 $2,247.20$2,000.00
 8" FLG'D GATE VALVE, CL 125, 200 PSI, WWP, NRS, WITH VALVE BOX PER LACWD STD PLAN W-15 1.01 6EA$4,250.00$7,720.00 $46,320.00 $14,344.00$10,000.00
 CONDUCTOR CASING 1.23 103LF$750.00$550.00 $56,650.00 $575.00$600.00
 CONCRETE SPLASH PAD 0.03 1LS$2,800.00$1,500.00 $1,500.00 $33,780.00$10,000.00
 CONCRETE CURB PER SPPWC STD PLAN 120-2, A3-6 0.20 184LF$80.00$50.00 $9,200.00 $142.20$146.00
 CONCRETE CATCH BASIN PER SPPWC STD PLAN 305-3 & MISC. CONCRETE 0.23 1LS$10,500.00$10,600.00 $10,600.00 $58,750.00$20,000.00
 COMMUNITY RELATIONS (ALLOWANCE OF $50,000) 1.09 50000AL$1.00$1.00 $50,000.00 $1.00$1.00
 CEMENT GROUT SEAL 0.36 100LF$85.00$165.00 $16,500.00 $242.40$180.00
 CALIPER LOGS 0.12 1EA$2,500.00$5,390.00 $5,390.00 $6,534.00$5,900.00
 CONTINUOUS RATE AQUIFER PUMP TEST - RECOVERY 0.11 1EA$5,000.00$4,950.00 $4,950.00 $14,370.00$5,500.00
 CONSTANT DISCHARGE AQUIFER TEST 0.60 1EA$8,500.00$27,720.00 $27,720.00 $33,992.00$30,240.00
 CONDUCTOR BOREHOLE 0.36 100LF$225.00$165.00 $16,500.00 $276.60$188.00
 GRAVEL CHUTE 0.40 107LF$70.00$172.00 $18,404.00 $171.80$190.00
 GRAVEL PACK 0.96 400LF$75.00$110.00 $44,000.00 $115.00$120.00
 GRAVEL PAVEMENT 0.77 14200SF$5.00$2.50 $35,500.00 $10.70$6.00
 GEOPHYSICAL BOREHOLE LOGS 0.13 1EA$8,000.00$6,050.00 $6,050.00 $7,290.00$6,800.00
 ELECTRICAL WORK 22.88 1LS$1,359,976.00$1,049,721.00 $1,049,721.00 $1,003,264.20$1,049,721.00
 DEVELOPMENT BY PUMPING 1.10 1LS$15,000.00$50,600.00 $50,600.00 $48,960.00$55,200.00
 DISINFECTION OF WELL 0.06 1LS$4,500.00$2,750.00 $2,750.00 $7,550.00$3,500.00
 INITIAL DEVELOPMENT BY SWABBING AND AIRLIFTING 0.72 1LS$40,000.00$33,000.00 $33,000.00 $33,500.00$36,000.00
 INITIAL VIDEO INSPECTION 0.03 1LS$4,000.00$1,500.00 $1,500.00 $7,600.00$5,000.00
 IMPLEMENTATION OF WELL DEVELOPMENT AND TESTING DISCHARGE PLAN 1.80 1LS$65,000.00$82,500.00 $82,500.00 $100,500.00$90,000.00
 IMPLEMENTATION OF THE NOISE MITIGATION PLAN 0.36 1LS$10,000.00$16,500.00 $16,500.00 $36,700.00$30,000.00
 MASONRY BLOCK WALL 5.31 804LF$220.00$303.00 $243,612.00 $527.80$360.00
 LOUVERED WELL SCREENS 3.06 150LF$850.00$935.00 $140,250.00 $947.00$1,000.00
 LANCASTER CITY PERMITS (ALLOWANCE OF $25,000) 0.54 25000AL$1.00$1.00 $25,000.00 $1.00$1.00
 ISOLATED AQUIFER ZONE TESTING 1.44 1EA$20,000.00$66,000.00 $66,000.00 $67,000.00$72,000.00
 PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED LS UNIT PRICE $10,000) 0.22 1LS$10,000.00$10,000.00 $10,000.00 $10,000.00$10,000.00
 PLUMBNESS ALIGNMENT AND SURVEY 0.18 1EA$3,700.00$8,250.00 $8,250.00 $9,050.00$9,000.00
 PILOT BOREHOLE 1.20 500LF$65.00$110.00 $55,000.00 $225.00$120.00
 PIPE SUPPORT PER LACWD STD PLAN W-17 0.09 6EA$1,500.00$715.00 $4,290.00 $2,703.00$3,000.00
 ORNAMENTAL STEEL FENCE 0.90 68LF$625.00$605.00 $41,140.00 $811.00$750.00
 SEEPAGE PIT 0.13 1LS$5,000.00$5,900.00 $5,900.00 $18,210.00$15,000.00
 REMOVE AND REPLACE PORTION OF FENCE 4-27 AND APPURTENANCES 0.05 1LS$5,600.00$2,250.00 $2,250.00 $30,880.00$18,150.00
 REMOVE AND DISPOSE EXISTING FENCING 0.06 1LS$8,100.00$2,980.00 $2,980.00 $12,176.00$12,500.00
 REMOVE AND DISPOSE EXISTING BLOCK WALL 0.46 1250SF$6.00$17.00 $21,250.00 $36.80$30.00
 REINFORCED CONCRETE WINGWALL AND HEADWALL 0.46 1LS$9,000.00$21,000.00 $21,000.00 $42,815.00$40,000.00
 REAM BOREHOLE 1.20 500LF$65.00$110.00 $55,000.00 $225.00$120.00
 PREPARATION OF WELL DEVELOPMENT AND TESTING DISCHARGE PLAN (STIPULATED UNIT PRICE OF $ 12,000) 0.26 1LS$12,000.00$12,000.00 $12,000.00 $12,000.00$12,000.00
 TEMPORARY WELL PUMPING AND DISCHARGE EQUIPMENT 2.16 1LS$65,000.00$98,900.00 $98,900.00 $93,580.00$85,000.00
 TEMPORARY SOUND WALLS 2.04 1LS$82,600.00$93,500.00 $93,500.00 $169,700.00$105,000.00
 TEMPORARY POWER (WELL 4-91) 2.82 6MTH$10,000.00$21,560.00 $129,360.00 $16,712.00$15,000.00
 SOUNDING TUBE 0.60 704LF$30.00$39.00 $27,456.00 $55.60$45.00
 SPINNER (FLOW METER) SURVEY 0.21 1EA$6,800.00$9,790.00 $9,790.00 $10,294.00$10,500.00
 WELL CASING 5.47 350LF$600.00$717.00 $250,950.00 $716.80$752.00
 WELL DRILLING PERMITS (ALLOWANCE OF $25,000) 0.54 25000AL$1.00$1.00 $25,000.00 $1.00$1.00
 WELL PUMP AND MOTOR 4.60 1LS$85,000.00$211,200.00 $211,200.00 $233,320.00$235,000.00
 WELL SLAB AND PEDESTAL PER STD PLAN W-20 0.78 1LS$15,000.00$36,000.00 $36,000.00 $25,223.00$27,115.00
 UNCLASSIFIED EXCAVATION (WELL 4-91 PAD) 0.25 45CY$85.00$255.00 $11,475.00 $575.00$400.00
 UNCLASSIFIED EXCAVATION (RETENTION BASIN) 0.54 226CY$85.00$110.00 $24,860.00 $410.00$340.00
 Total Percent100   Total Amount$4,587,457.00