Bid Price History

Lower Busch Tank Improvement
$3,366,921.00
12/16/2025
667 (D1)
4
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.07 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.16 11MTH$500.00$500.00 $5,500.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.03 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.30 1LS$10,000.00$10,000.00 $10,000.00 $21,656.25$20,812.50
001.07.003IMPLEMENTATION OF BMPS 0.15 1LS$25,000.00$5,000.00 $5,000.00 $23,125.00$18,750.00
001.07.021SHORING OF OPEN EXCAVATIONS 0.30 1LS$28,000.00$10,000.00 $10,000.00 $23,750.00$17,500.00
001.07.023PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) 0.09 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.025IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 0.06 1LS$15,000.00$2,000.00 $2,000.00 $10,500.00$7,500.00
001.07.037REMOVAL AND DISPOSAL OF LBP/LCP 1.56 1LS$10,000.00$52,500.00 $52,500.00 $51,562.50$51,250.00
001.07.043PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) 0.09 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.045IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN 0.09 1LS$20,000.00$3,000.00 $3,000.00 $25,875.00$26,250.00
001.07.047PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3000) 0.09 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.049IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN 0.15 1LS$10,000.00$5,000.00 $5,000.00 $46,875.00$21,250.00
001.07.051REMOVAL AND DISPOSAL OF NON-HAZARDOUS ASBESTOS WASTE 4.54 1LS$5,000.00$152,800.00 $152,800.00 $124,075.00$153,150.00
001.08.005OFFICE FACILITIES 0.71 12MTH$2,400.00$2,000.00 $24,000.00 $3,750.00$3,000.00
001.09.003MOBILIZATION 9.80 1LS$200,000.00$330,000.00 $330,000.00 $328,750.00$262,500.00
300.01.003CLEARING AND GRUBBING 0.59 1LS$7,500.00$20,000.00 $20,000.00 $82,625.00$67,500.00
300.02.003UNCLASSIFIED EXCAVATION 1.03 290CY$175.00$120.00 $34,800.00 $148.75$160.00
300.04.023STRUCTURE BACKFILL 2.12 595CY$190.00$120.00 $71,400.00 $148.75$147.50
302.05.013AC PAVEMENT 2.02 170TON$600.00$400.00 $68,000.00 $430.25$400.00
303.01.368PARKWAY DRAIN PER STD PLAN 151, S=48", INLET TYPE 2 0.18 1EA$17,600.00$6,000.00 $6,000.00 $31,500.00$35,000.00
306.01.225BUTTERFLY VALVE, 300 PSI WWP, 6" 0.06 1EA$3,500.00$2,000.00 $2,000.00 $5,275.00$5,750.00
306.01.227GATE VALVE, 150 PSI WWP, 10" 0.59 4EA$5,750.00$5,000.00 $20,000.00 $6,178.50$6,250.00
306.01.227GATE VALVE, 150 PSI WWP, 12" 0.83 4EA$6,000.00$7,000.00 $28,000.00 $7,200.00$7,500.00
306.01.227GATE VALVE, 150 PSI WWP, 4" 0.18 3EA$2,300.00$2,000.00 $6,000.00 $3,775.00$2,750.00
500.00.015VIDEO INSPECTION 0.15 1LS$3,500.00$5,000.00 $5,000.00 $6,875.00$6,250.00
601.09.011TRAFFIC CONTROL 0.89 1LS$70,000.00$30,000.00 $30,000.00 $25,000.00$27,500.00
801.04.021LANDSCAPING 0.62 1LS$8,600.00$21,000.00 $21,000.00 $27,000.00$23,000.00
801.05.003IRRIGATION SYSTEM 0.36 1LS$30,650.00$12,000.00 $12,000.00 $24,750.00$18,500.00
801.06.003PLANT ESTABLISHMENT PERIOD 0.15 1LS$3,750.00$5,000.00 $5,000.00 $5,750.00$5,000.00
 ELECTRICAL WORK 2.94 1LS$250,000.00$99,000.00 $99,000.00 $232,875.00$266,250.00
 DELETED 0 1---$0.01$1.00 $1.00 $1.00$1.00
 DEMOLITION OF EXISTING FACILITIES 4.16 1LS$85,000.00$140,000.00 $140,000.00 $177,812.50$173,125.00
 CONCRETE RINGWALL FOUNDATION 8.32 1LS$155,000.00$280,000.00 $280,000.00 $206,000.00$205,000.00
 CONCRETE SLABS (FOR TEMPORARY TANKS) 0.56 1LS$17,500.00$19,000.00 $19,000.00 $32,250.00$30,000.00
 CONCRETE SLABS (FOR STAIRWAY LANDING) 0.06 1LS$7,500.00$2,000.00 $2,000.00 $6,375.00$6,750.00
 CONCRETE SLABS (FOR INLET/OUTLET PIPING) 0.59 2EA$9,500.00$10,000.00 $20,000.00 $13,312.50$12,500.00
 CONNECTION PIPING TO EXISTING SYSTEM 0.95 4EA$4,500.00$8,000.00 $32,000.00 $19,125.00$11,250.00
 CATHODIC PROTECTION SYSTEM 0.89 1LS$39,500.00$30,000.00 $30,000.00 $35,250.00$28,000.00
 CONCRETE CURB AND GUTTER PER STD PLAN 2.03 341LF$105.00$200.00 $68,200.00 $152.50$155.00
 6' H ARCHITECTURAL PRIVACY FENCE 3.86 191LF$195.00$680.00 $129,880.00 $821.25$720.00
 6" WATERMAIN AND FITTINGS, STD. WT. STEEL, 300 PSI WWP 0.67 75LF$350.00$300.00 $22,500.00 $520.75$426.50
 8'H. VEHICLE ACCESS GATE 0.71 2EA$6,000.00$12,000.00 $24,000.00 $24,875.00$25,000.00
 8'H. ARCHITECTURAL PRIVACY FENCE 2.08 68LF$549.00$1,030.00 $70,040.00 $1,113.50$804.50
 0.5 HP BLOWER SYSTEM 0.59 1LS$17,500.00$20,000.00 $20,000.00 $25,500.00$17,500.00
 0.385 MG WELDED STEEL TANK AND APPURTENANCES 21.92 1LS$795,000.00$738,000.00 $738,000.00 $859,504.50$847,500.00
 12" WATERMAIN AND FITTINGS, STD. WT. STEEL, 150 PSI WWP 2.08 70LF$475.00$1,000.00 $70,000.00 $964.25$928.50
 TANK INTERIOR PAINTING 2.97 1LS$118,000.00$100,000.00 $100,000.00 $271,912.50$142,500.00
 TREE REMOVAL 0.45 1LS$9,500.00$15,000.00 $15,000.00 $12,375.00$10,000.00
 TANK INLET PIPING SYSTEM 1.81 1LS$46,000.00$61,000.00 $61,000.00 $133,125.00$110,750.00
 TANK EXTERIOR PAINTING 2.02 1LS$95,000.00$68,000.00 $68,000.00 $105,625.00$94,000.00
 TEMPORARY STORAGE TANKS AND BYPASS PIPING SYSTEM 1.25 1LS$29,000.00$42,000.00 $42,000.00 $121,900.00$135,300.00
 SCAQMD PERMIT FOR GENERATOR (ALLOWANCE OF $15,000) 0.45 15000AL$1.00$1.00 $15,000.00 $1.00$1.00
 10" WATERMAIN AND FITTINGS, STD. WT. STEEL, 150 PSI WWP 0.58 52LF$425.00$375.00 $19,500.00 $701.50$665.50
 PUMP CONNECTION PIPING SYSTEM 1.13 1LS$18,000.00$38,000.00 $38,000.00 $43,975.00$44,000.00
 RELOCATE 4-INCH BYPASS PIPING AND BOLLARDS 0.59 1LS$4,500.00$20,000.00 $20,000.00 $22,500.00$22,500.00
 PERMIT AND INSPECTION FEES (ALLOWANCE OF $15,000) 0.45 15000AL$1.00$1.00 $15,000.00 $1.00$1.00
 PREPARATION OF BMP PLAN (STIPULATED UNIT PRICE OF $2,500) 0.07 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 MOBILE GENERATOR 5.64 1LS$350,000.00$190,000.00 $190,000.00 $208,125.00$199,000.00
 TANK OUTLET PIPING SYSTEM 2.22 1LS$59,700.00$74,800.00 $74,800.00 $136,950.00$136,500.00
 Total Percent100   Total Amount$3,366,921.00