| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.08
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.10
| 6 | MTH | $500.00 | $500.00 |
$3,000.00
| $500.00 | $500.00 |
| 001.06.007 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.03
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.80
| 1 | LS | $15,000.00 | $25,000.00 |
$25,000.00
| $20,666.67 | $25,000.00 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
0.80
| 1 | LS | $10,000.00 | $25,000.00 |
$25,000.00
| $40,000.00 | $25,000.00 |
| 001.07.023 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $5000) |
0.16
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
| 001.07.025 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
0.80
| 1 | LS | $10,000.00 | $25,000.00 |
$25,000.00
| $46,666.67 | $25,000.00 |
| 001.08.005 | OFFICE FACILITIES |
1.43
| 6 | MTH | $5,000.00 | $7,500.00 |
$45,000.00
| $6,000.00 | $7,500.00 |
| 001.09.003 | MOBILIZATION |
3.82
| 1 | LS | $243,750.00 | $120,000.00 |
$120,000.00
| $423,333.33 | $520,000.00 |
| 304.02.013 | CABLE RAILING (CALTRANS STD PLAN B11-47) |
0.84
| 220 | LF | $250.00 | $120.00 |
$26,400.00
| $113.21 | $114.38 |
| 304.02.013 | CABLE RAILING (CALTRANS STD PLAN B11-47) |
0.36
| 95 | LF | $250.00 | $120.00 |
$11,400.00
| $113.21 | $114.38 |
| | MINOR HOT MIX ASPHALT DIKE (TYPE A) |
0.08
| 5 | LF | $50.00 | $500.00 |
$2,500.00
| $733.33 | $500.00 |
| | MIDWEST GUARDRAIL SYSTEM |
0.50
| 210 | LF | $150.00 | $75.00 |
$15,750.00
| $72.67 | $75.00 |
| | PRECAST CONCRETE LAGGING |
2.92
| 835 | SQFT | $65.00 | $110.00 |
$91,850.00
| $127.00 | $121.00 |
| | PRECAST CONCRETE LAGGING |
4.06
| 1158 | SQFT | $65.00 | $110.00 |
$127,380.00
| $127.00 | $121.00 |
| | PRECAST CONCRETE LAGGING |
9.29
| 2652 | SQFT | $65.00 | $110.00 |
$291,720.00
| $127.00 | $121.00 |
| | 30" DRILLED HOLE |
9.47
| 1190 | LF | $250.00 | $250.00 |
$297,500.00
| $583.33 | $500.00 |
| | ROLLED EROSION CONTROL PRODUCT (JUTE MESH) |
0.22
| 700 | SQFT | $5.00 | $10.00 |
$7,000.00
| $13.33 | $10.00 |
| | WALL DEMOLITION |
1.11
| 1 | LS | $10,000.00 | $35,000.00 |
$35,000.00
| $133,333.33 | $40,000.00 |
| | STEEL SOLDIER PILE (W18X119) |
1.96
| 20468 | LB | $3.75 | $3.00 |
$61,404.00
| $2.50 | $2.50 |
| | STEEL SOLDIER PILE (W18X119) |
3.27
| 34213 | LB | $3.75 | $3.00 |
$102,639.00
| $2.50 | $2.50 |
| | STEEL SOLDIER PILE (W18X143) |
6.01
| 62920 | LB | $3.75 | $3.00 |
$188,760.00
| $2.50 | $2.50 |
| | STEEL SOLDIER PILE (W18X192) |
3.48
| 36480 | LB | $3.75 | $3.00 |
$109,440.00
| $2.50 | $2.50 |
| | STEEL SOLDIER PILE (W18X86) |
4.80
| 50224 | LB | $3.75 | $3.00 |
$150,672.00
| $2.50 | $2.50 |
| | SITE 4 REPAIRS (ALLOWANCE OF $500,000) |
15.92
| 500000 | AL | $1.00 | $1.00 |
$500,000.00
| $1.00 | $1.00 |
| | STRUCTURE EXCAVATION (SOLDIER PILE WALL) |
2.28
| 358 | CY | $80.00 | $200.00 |
$71,600.00
| $239.00 | $250.00 |
| | STRUCTURE EXCAVATION (SOLDIER PILE WALL) |
0.94
| 147 | CY | $80.00 | $200.00 |
$29,400.00
| $239.00 | $250.00 |
| | STRUCTURE BACKFILL (SOLDIER PILE WALL) |
1.37
| 215 | CY | $80.00 | $200.00 |
$43,000.00
| $233.33 | $200.00 |
| | STRUCTURE BACKFILL (SOLDIER PILE WALL) |
0.66
| 104 | CY | $80.00 | $200.00 |
$20,800.00
| $233.33 | $200.00 |
| | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.96
| 15 | TON | $200.00 | $2,000.00 |
$30,000.00
| $1,100.00 | $850.00 |
| | TRANSPORTATION AND DELIVERY OF TREATED WOOD WASTE MAINTAINTENACE YARD (ALLOWANCE OF $5,000) |
0.16
| 5000 | AL | $1.00 | $1.00 |
$5,000.00
| $1.00 | $1.00 |
| | MINOR CONCRETE (560-C-3250 W/ 6" X 6" - 10/10 GAGE W.W.F) |
2.23
| 40 | CY | $2,250.00 | $1,750.00 |
$70,000.00
| $1,916.67 | $2,000.00 |
| | MINOR CONCRETE (560-C-3250 W/ 6" X 6" - 10/10 GAGE W.W.F) |
0.56
| 10 | CY | $2,250.00 | $1,750.00 |
$17,500.00
| $1,916.67 | $2,000.00 |
| | LEAN CONCRETE BACKFILL (SOLDIER PILE WALL) |
0.96
| 20 | CY | $400.00 | $1,500.00 |
$30,000.00
| $985.67 | $1,200.00 |
| | LEAN CONCRETE BACKFILL (SOLDIER PILE WALL) |
3.49
| 73 | CY | $400.00 | $1,500.00 |
$109,500.00
| $985.67 | $1,200.00 |
| | FIBER ROLLS |
1.21
| 760 | LF | $20.00 | $50.00 |
$38,000.00
| $28.33 | $25.00 |
| | FIBER ROLLS |
1.50
| 940 | LF | $20.00 | $50.00 |
$47,000.00
| $28.33 | $25.00 |
| | CONCRETE BACKFILL (SOLDIER PILE WALL) |
4.59
| 144 | CY | $500.00 | $1,000.00 |
$144,000.00
| $938.00 | $1,000.00 |
| | CONCRETE BACKFILL (SOLDIER PILE WALL) |
2.10
| 66 | CY | $500.00 | $1,000.00 |
$66,000.00
| $938.00 | $1,000.00 |
| | CONCRETE BACKFILL (MGS EMBEDMENT) |
0.54
| 10 | CY | $500.00 | $1,700.00 |
$17,000.00
| $1,958.33 | $1,700.00 |
| | ROLLED EROSION CONTROL PRODUCT (JUTE MESH) |
0.34
| 1066 | SQFT | $5.00 | $10.00 |
$10,660.00
| $13.33 | $10.00 |
| | 30" DRILLED HOLE |
3.74
| 470 | LF | $250.00 | $250.00 |
$117,500.00
| $583.33 | $500.00 |
| | PREPARATION OF THE TREATED WOOD WASTE PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.08
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| | Total Percent | 100 | | | | Total Amount | $3,140,375.00 | | |