Bid Price History

Cogswell Reservoir Post-Fire Emergency Restoration Project
$52,687,643.00
03/02/2021
508 (A5),508 (B5)
3
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) 0.01 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.02 18MTH$500.00$500.00 $9,000.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $2,000) 0 1LS$2,000.00$2,000.00 $2,000.00 $2,000.00$2,000.00
001.06.013PARTNERING (ALLOWANCE OF $25,000) 0.05 25000AL$1.00$1.00 $25,000.00 $1.00$1.00
001.07.001IMPLEMENTATION OF BMPS 0.72 18MTH$3,500.00$21,000.00 $378,000.00 $32,090.00$21,000.00
001.07.009RESTORATION OF EXISTING IMPROVEMENTS 0.15 1LS$10,000.00$80,000.00 $80,000.00 $256,233.50$200,000.00
001.07.021SHORING OF OPEN EXCAVATIONS 0.38 1LS$25,000.00$200,000.00 $200,000.00 $153,333.33$200,000.00
001.08.005OFFICE FACILITIES 0.41 36MTH$2,500.00$6,000.00 $216,000.00 $7,766.67$6,000.00
300.01.057REMOVE EXISTING CHAIN LINK FENCE 0.02 440LF$15.00$25.00 $11,000.00 $18.33$20.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.17 435CY$250.00$200.00 $87,000.00 $137.33$150.00
300.02.003UNCLASSIFIED EXCAVATION 0 2CY$65.00$550.00 $1,100.00 $583.33$550.00
300.08.003DRAINAGE GEOTEXTILE 0 695SY$5.00$2.00 $1,390.00 $2.98$2.00
301.02.005CRUSHED MISCELLANEOUS BASE 0.59 4660CY$135.00$67.00 $312,220.00 $106.67$90.00
302.05.008AC CURB, TYPE D1-8 0.08 5095LF$5.00$8.40 $42,798.00 $8.13$8.00
302.05.013AC PAVEMENT 0.79 3490TON$130.00$120.00 $418,800.00 $131.67$125.00
306.01.1218" PERFORATED CSP, 16 GAGE 0.24 2085LF$18.70$60.00 $125,100.00 $52.00$50.00
 PREPARATION OF THE RESERVOIR DEWATERING PLAN (STIPULATED UNIT PRICE OF $10,000) 0.02 1LS$10,000.00$10,000.00 $10,000.00 $10,000.00$10,000.00
 PREPARATION OF THE FUGITIVE DUST CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PREPARATION OF THE SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $10,000) 0.02 1LS$10,000.00$10,000.00 $10,000.00 $10,000.00$10,000.00
 REMOVAL AND DISPOSAL OF EXISTING 60" CSP AND SEAL 0.05 1LS$2,300.00$24,000.00 $24,000.00 $16,616.67$24,000.00
 REMOVAL AND DISPOSAL OF EXISTING 84" CSP AND SEAL 0.02 1LS$3,000.00$11,500.00 $11,500.00 $13,500.00$11,500.00
 RESERVOIR EXCAVATION, AND TRANSPORTATION AND DISPOSAL OF SEDIMENT (2021) 7.59 400000CY$14.10$10.00 $4,000,000.00 $15.83$14.50
 RESERVOIR EXCAVATION, AND TRANSPORTATION AND DISPOSAL OF SEDIMENT (2022) 16.35 800000CY$14.30$10.77 $8,616,000.00 $12.92$14.00
 RESERVOIR EXCAVATION, AND TRANSPORTATION AND DISPOSAL OF SEDIMENT (2023) 16.90 800000CY$14.60$11.13 $8,904,000.00 $13.04$14.00
 REPAIR ACCESS ROAD (2023) 0.05 25000SF$0.30$1.10 $27,500.00 $2.14$2.33
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2021) 0.64 12000TON$65.00$28.00 $336,000.00 $21.50$28.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2022) 0.64 12000TON$65.00$28.00 $336,000.00 $21.50$28.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2023) 0.64 12000TON$65.00$28.00 $336,000.00 $21.50$28.00
 SLURRY FILL(100-E-100 OR 1 SACK SAND) 0.68 2050CY$160.00$175.00 $358,750.00 $151.67$170.00
 SITE A-1,DRAINAGE SYSTEM 1 INLET 0.07 1EA$235,000.00$38,000.00 $38,000.00 $153,666.67$148,000.00
 SITE A-1,DRAINAGE SYSTEM 2 INLET 0.06 1EA$165,000.00$31,000.00 $31,000.00 $118,000.00$148,000.00
 SITE A-2,DRAINAGE SYSTEM 1 INLET 0.05 1EA$160,000.00$27,000.00 $27,000.00 $125,666.67$140,000.00
 SITE A-2,DRAINAGE SYSTEM 2 INLET 0.05 1EA$105,000.00$27,000.00 $27,000.00 $98,333.33$130,000.00
 SITE B, DRAINAGE SYSTEM 1 INLET 0.05 1EA$112,000.00$27,000.00 $27,000.00 $99,000.00$130,000.00
 102" POLYMER COATED CSP, 12 GAGE 0.60 504LF$385.00$630.00 $317,520.00 $660.00$630.00
 24" POLYMER COATED CSP, 12 GAGE 1.75 4184LF$80.00$220.00 $920,480.00 $163.33$135.00
 24" POLYMER COATED CSP, 12 GAGE, DROP INLETS 0.08 33EA$1,000.00$1,200.00 $39,600.00 $3,000.00$3,800.00
 2 WATER TRUCKS 2.28 400DAY$2,400.00$3,000.00 $1,200,000.00 $3,033.33$3,000.00
 60" CS SEEP RING, 8 GAGE, 10' X 10' 0.13 7EA$1,500.00$9,700.00 $67,900.00 $7,500.00$7,200.00
 60" CSP ACCESS SHAFT WITH SAFETY LEDGE, 12 GAUGE 0.32 6EA$15,000.00$28,000.00 $168,000.00 $36,000.00$30,000.00
 60" POLYMER COATED CSP, 12 GAGE 1.22 1818LF$250.00$355.00 $645,390.00 $388.00$400.00
 84" CS SEEP RING, 8 GAGE, 12' X 12' 0.08 5EA$2,000.00$8,900.00 $44,500.00 $7,866.67$8,900.00
 84" POLYMER COATED CSP, 12 GAGE 0.60 544LF$320.00$580.00 $315,520.00 $560.00$580.00
 84" TO 102" POLYMER COATED CSP ECCENTRIC TRANSITION, 12 GAGE 0.01 1EA$3,500.00$5,200.00 $5,200.00 $7,233.33$6,500.00
 CLEAN UPSTREAM DAM FACING CONCRETE SLAB (2022) 0.09 60000SF$1.11$0.80 $48,000.00 $1.06$1.00
 CLEAN UPSTREAM DAM FACING CONCRETE SLAB (2023) 0.05 30000SF$1.11$0.80 $24,000.00 $1.06$1.00
 CLASS "D3" DRAIN MATERIAL 0.04 285CY$100.00$80.00 $22,800.00 $88.33$85.00
 CLEARING AND GRUBBING (2021) 0.30 32AC$13,000.00$5,000.00 $160,000.00 $3,500.00$5,000.00
 CLEARING AND GRUBBING (2022) 0.09 32AC$13,000.00$1,500.00 $48,000.00 $2,333.33$1,500.00
 CLEARING AND GRUBBING (2023) 0.09 32AC$13,000.00$1,500.00 $48,000.00 $2,333.33$1,500.00
 CLEARING AND GRUBBING (FOR TEMPORARY ACCESS ROADS) 0.10 6AC$4,000.00$9,000.00 $54,000.00 $7,666.67$9,000.00
 CONSTRUCT AND REMOVE SILT FENCE (2023) 0.02 1450LF$4.50$8.00 $11,600.00 $8.00$8.00
 CONSTRUCT WORK PAD (2023) 0.16 83500SF$0.50$1.00 $83,500.00 $0.63$0.50
 CONSTRUCT ACCESS ROAD (2023) 0.07 37500SF$0.50$1.00 $37,500.00 $3.34$4.00
 CONTACT GUTTER TYPE B 0.54 5665LF$26.60$50.00 $283,250.00 $45.67$50.00
 DELETED ITEM 67 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 DEBRIS REMOVAL AND MAINTENANCE OF WEST FORK ROAD (ALLOWANCE OF $300,000) 0.57 300000AL$1.00$1.00 $300,000.00 $1.00$1.00
 DELETED ITEM 68 0 1AC$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 69 0 1CY$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 70 0 1TON$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 71 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 72 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 73 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 74 0 1AC$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 75 0 1CY$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 76 0 1TON$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 84 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 85 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 86 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 87 0 1LF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 88 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 89 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 90 0 1SF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 91 0 1LF$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 65 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 DELETED ITEM 66 0 1LS$0.00$0.00 $0.00 $0.00$0.00
 GUTTER TYPE A1 0.69 5425LF$34.70$67.00 $363,475.00 $67.00$67.00
 GUTTER TYPE A2 1.25 10150LF$34.10$65.00 $659,750.00 $66.67$65.00
 IMPLEMENTATION OF THE FUGITIVE DUST CONTROL PLAN 0.61 18MTH$1,500.00$18,000.00 $324,000.00 $10,500.00$12,500.00
 IMPLEMENTATION OF THE RESERVOIR DEWATERING PLAN (2021) 7.21 1LS$150,000.00$3,800,000.00 $3,800,000.00 $2,835,514.33$3,800,000.00
 IMPLEMENTATION OF THE RESERVOIR DEWATERING PLAN (2022) 3.61 1LS$150,000.00$1,900,000.00 $1,900,000.00 $1,320,000.00$1,740,000.00
 IMPLEMENTATION OF THE RESERVOIR DEWATERING PLAN (2023) 4.18 1LS$150,000.00$2,200,000.00 $2,200,000.00 $1,177,240.00$1,011,720.00
 IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN (2021) 7.21 1LS$150,000.00$3,800,000.00 $3,800,000.00 $2,949,301.67$3,800,000.00
 IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN (2022) 3.61 1LS$150,000.00$1,900,000.00 $1,900,000.00 $783,333.33$350,000.00
 IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN (2023) 4.18 1LS$150,000.00$2,200,000.00 $2,200,000.00 $921,175.50$463,526.50
 MOBILIZATION (2023) 0.70 1LS$300,000.00$370,000.00 $370,000.00 $1,050,659.67$1,350,000.00
 MOBILIZATION (2021) 4.92 1LS$300,000.00$2,593,000.00 $2,593,000.00 $2,064,333.33$2,100,000.00
 MOBILIZATION (2022) 0.66 1LS$300,000.00$350,000.00 $350,000.00 $1,266,666.67$1,350,000.00
 VEHICLE AND EQUIPMENT EMISSIONS REPORTING 0.07 18MTH$2,000.00$2,000.00 $36,000.00 $5,433.33$2,000.00
 UTILITY REPAIRS PER PLAN E 4.08 1LS$1,300,000.00$2,150,000.00 $2,150,000.00 $4,442,101.58$4,976,304.75
 WATER QUALITY MONITORING AND REPORTING 0.30 400DAY$1,000.00$400.00 $160,000.00 $283.33$250.00
 Total Percent100   Total Amount$52,687,643.00