001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.03 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.003CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.03 5MTH$500.00$500.00 $2,500.00 $500.00$500.00
001.06.007CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.01 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.20 1LS$10,000.00$15,000.00 $15,000.00 $17,148.00$16,935.50
001.07.003IMPLEMENTATION OF BMPS 0.07 1LS$20,000.00$5,000.00 $5,000.00 $20,626.40$12,500.00
001.07.023PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) 0.04 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.025IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 0.26 1LS$15,000.00$20,000.00 $20,000.00 $23,441.70$10,000.00
001.07.037REMOVAL AND DISPOSAL OF LBP/LCP 0.98 1LS$15,000.00$75,000.00 $75,000.00 $54,485.20$45,625.00
001.07.043PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) 0.04 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.045IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN 0.02 1LS$15,000.00$1,500.00 $1,500.00 $11,290.06$7,561.32
001.07.049IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN 0.02 1LS$15,000.00$1,500.00 $1,500.00 $6,641.20$6,187.50
001.08.005OFFICE FACILITIES 0.86 6MTH$10,000.00$11,000.00 $66,000.00 $7,547.60$5,500.00
001.09.003MOBILIZATION 1.83 1LS$750,000.00$140,000.00 $140,000.00 $558,975.00$560,000.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.07 1CY$4,000.00$5,000.00 $5,000.00 $6,909.40$7,000.00
303.01.003STRUCTURE CONCRETE 0.29 2CY$5,400.00$11,000.00 $22,000.00 $12,545.60$8,750.00
303.01.041BAR REINFORCING STEEL 0.07 474LB$7.50$12.00 $5,688.00 $18.22$16.00
303.01.115DRILL AND BOND DOWEL (EPOXY CARTRIDGE) 0.10 159LF$200.00$50.00 $7,950.00 $199.00$177.50
304.01.015STRUCTURAL STEEL 8.49 28317LB$27.50$23.00 $651,291.00 $27.00$26.00
601.09.011TRAFFIC CONTROL 0.07 1LS$30,000.00$5,000.00 $5,000.00 $17,455.80$17,154.00
 MISCELLANEOUS MECHANICAL WORKS 1.83 1LS$300,000.00$140,000.00 $140,000.00 $298,108.80$170,000.00
 FIBERGLASS REINFORCED POLYMER GRATING 0.65 1002SF$150.00$50.00 $50,100.00 $81.60$82.00
 ELECTRICAL WORK 18.58 1LS$842,150.00$1,425,000.00 $1,425,000.00 $1,658,476.10$1,465,030.50
 OPERATIONAL TESTS 0.01 1LS$50,000.00$1,000.00 $1,000.00 $28,475.00$30,000.00
 DEMOLITION 1.96 1LS$350,000.00$150,000.00 $150,000.00 $207,742.40$155,000.00
 PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3,000) 0.04 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
 DAVIT SLEEVE 0.05 1LS$10,000.00$3,500.00 $3,500.00 $8,796.50$6,050.00
 REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIAL 0.26 1LS$25,000.00$20,000.00 $20,000.00 $34,886.20$27,500.00
 REMOVAL OF EXISTING STEEL STRUCTURES 0.65 1LS$100,000.00$50,000.00 $50,000.00 $63,003.80$45,350.00
 ACCESS HATCH 0.13 1LS$10,000.00$10,000.00 $10,000.00 $18,949.68$11,100.00
 48 INCHES VERTICAL AXIAL FLOW PROPELLER PUMP WITH ELECTRIC MOTOR 32.46 3EA$750,000.00$830,000.00 $2,490,000.00 $943,366.90$925,584.50
 STAIR TREADS 0.46 1LS$54,000.00$35,000.00 $35,000.00 $42,462.40$32,500.00
 36 INCHES VERTICAL AXIAL FLOW PROPELLER PUMP WITH EXISTING RIGHT ANGLE GEAR DRIVE 10.95 2EA$450,000.00$420,000.00 $840,000.00 $594,096.80$497,240.50
 SWITCHBOARD, MOTOR CONTROL CENTER, AND BUSDUCT 14.99 1LS$1,250,000.00$1,150,000.00 $1,150,000.00 $1,181,102.10$1,175,000.00
 TRASH RACK 2.93 1LS$250,000.00$225,000.00 $225,000.00 $256,401.90$227,500.00
 FIBERGLASS REINFORCED POLYMER HANDRAIL 0.58 296LF$310.00$150.00 $44,400.00 $343.04$343.81
 Total Percent100   Total Amount$7,669,929.00