| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.03
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.03
| 5 | MTH | $500.00 | $500.00 |
$2,500.00
| $500.00 | $500.00 |
| 001.06.007 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.01
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.20
| 1 | LS | $10,000.00 | $15,000.00 |
$15,000.00
| $17,148.00 | $16,935.50 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
0.07
| 1 | LS | $20,000.00 | $5,000.00 |
$5,000.00
| $20,626.40 | $12,500.00 |
| 001.07.023 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) |
0.04
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.025 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
0.26
| 1 | LS | $15,000.00 | $20,000.00 |
$20,000.00
| $23,441.70 | $10,000.00 |
| 001.07.037 | REMOVAL AND DISPOSAL OF LBP/LCP |
0.98
| 1 | LS | $15,000.00 | $75,000.00 |
$75,000.00
| $54,485.20 | $45,625.00 |
| 001.07.043 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
0.04
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.045 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
0.02
| 1 | LS | $15,000.00 | $1,500.00 |
$1,500.00
| $11,290.06 | $7,561.32 |
| 001.07.049 | IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN |
0.02
| 1 | LS | $15,000.00 | $1,500.00 |
$1,500.00
| $6,641.20 | $6,187.50 |
| 001.08.005 | OFFICE FACILITIES |
0.86
| 6 | MTH | $10,000.00 | $11,000.00 |
$66,000.00
| $7,547.60 | $5,500.00 |
| 001.09.003 | MOBILIZATION |
1.83
| 1 | LS | $750,000.00 | $140,000.00 |
$140,000.00
| $558,975.00 | $560,000.00 |
| 300.01.067 | CONCRETE REMOVAL (REINFORCED) |
0.07
| 1 | CY | $4,000.00 | $5,000.00 |
$5,000.00
| $6,909.40 | $7,000.00 |
| 303.01.003 | STRUCTURE CONCRETE |
0.29
| 2 | CY | $5,400.00 | $11,000.00 |
$22,000.00
| $12,545.60 | $8,750.00 |
| 303.01.041 | BAR REINFORCING STEEL |
0.07
| 474 | LB | $7.50 | $12.00 |
$5,688.00
| $18.22 | $16.00 |
| 303.01.115 | DRILL AND BOND DOWEL (EPOXY CARTRIDGE) |
0.10
| 159 | LF | $200.00 | $50.00 |
$7,950.00
| $199.00 | $177.50 |
| 304.01.015 | STRUCTURAL STEEL |
8.49
| 28317 | LB | $27.50 | $23.00 |
$651,291.00
| $27.00 | $26.00 |
| 601.09.011 | TRAFFIC CONTROL |
0.07
| 1 | LS | $30,000.00 | $5,000.00 |
$5,000.00
| $17,455.80 | $17,154.00 |
| | MISCELLANEOUS MECHANICAL WORKS |
1.83
| 1 | LS | $300,000.00 | $140,000.00 |
$140,000.00
| $298,108.80 | $170,000.00 |
| | FIBERGLASS REINFORCED POLYMER GRATING |
0.65
| 1002 | SF | $150.00 | $50.00 |
$50,100.00
| $81.60 | $82.00 |
| | ELECTRICAL WORK |
18.58
| 1 | LS | $842,150.00 | $1,425,000.00 |
$1,425,000.00
| $1,658,476.10 | $1,465,030.50 |
| | OPERATIONAL TESTS |
0.01
| 1 | LS | $50,000.00 | $1,000.00 |
$1,000.00
| $28,475.00 | $30,000.00 |
| | DEMOLITION |
1.96
| 1 | LS | $350,000.00 | $150,000.00 |
$150,000.00
| $207,742.40 | $155,000.00 |
| | PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3,000) |
0.04
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| | DAVIT SLEEVE |
0.05
| 1 | LS | $10,000.00 | $3,500.00 |
$3,500.00
| $8,796.50 | $6,050.00 |
| | REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIAL |
0.26
| 1 | LS | $25,000.00 | $20,000.00 |
$20,000.00
| $34,886.20 | $27,500.00 |
| | REMOVAL OF EXISTING STEEL STRUCTURES |
0.65
| 1 | LS | $100,000.00 | $50,000.00 |
$50,000.00
| $63,003.80 | $45,350.00 |
| | ACCESS HATCH |
0.13
| 1 | LS | $10,000.00 | $10,000.00 |
$10,000.00
| $18,949.68 | $11,100.00 |
| | 48 INCHES VERTICAL AXIAL FLOW PROPELLER PUMP WITH ELECTRIC MOTOR |
32.46
| 3 | EA | $750,000.00 | $830,000.00 |
$2,490,000.00
| $943,366.90 | $925,584.50 |
| | STAIR TREADS |
0.46
| 1 | LS | $54,000.00 | $35,000.00 |
$35,000.00
| $42,462.40 | $32,500.00 |
| | 36 INCHES VERTICAL AXIAL FLOW PROPELLER PUMP WITH EXISTING RIGHT ANGLE GEAR DRIVE |
10.95
| 2 | EA | $450,000.00 | $420,000.00 |
$840,000.00
| $594,096.80 | $497,240.50 |
| | SWITCHBOARD, MOTOR CONTROL CENTER, AND BUSDUCT |
14.99
| 1 | LS | $1,250,000.00 | $1,150,000.00 |
$1,150,000.00
| $1,181,102.10 | $1,175,000.00 |
| | TRASH RACK |
2.93
| 1 | LS | $250,000.00 | $225,000.00 |
$225,000.00
| $256,401.90 | $227,500.00 |
| | FIBERGLASS REINFORCED POLYMER HANDRAIL |
0.58
| 296 | LF | $310.00 | $150.00 |
$44,400.00
| $343.04 | $343.81 |
| | Total Percent | 100 | | | | Total Amount | $7,669,929.00 | | |