| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.03
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.04
| 6 | MTH | $500.00 | $500.00 |
$3,000.00
| $500.00 | $500.00 |
| 001.06.007 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.01
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.09
| 1 | LS | $10,000.00 | $7,500.00 |
$7,500.00
| $19,500.00 | $15,000.00 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
0.07
| 1 | LS | $20,000.00 | $6,000.00 |
$6,000.00
| $42,200.00 | $35,000.00 |
| 001.07.023 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) |
0.04
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.025 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
0.03
| 1 | LS | $15,000.00 | $2,500.00 |
$2,500.00
| $16,900.00 | $10,000.00 |
| 001.07.037 | REMOVAL AND DISPOSAL OF LBP/LCP |
0.70
| 1 | LS | $15,000.00 | $59,000.00 |
$59,000.00
| $54,315.80 | $59,000.00 |
| 001.07.043 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
0.04
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.045 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
0.33
| 1 | LS | $15,000.00 | $28,000.00 |
$28,000.00
| $25,570.00 | $25,000.00 |
| 001.08.005 | OFFICE FACILITIES |
0.25
| 7 | MTH | $10,000.00 | $3,000.00 |
$21,000.00
| $6,100.00 | $7,000.00 |
| 001.09.003 | MOBILIZATION |
9.86
| 1 | LS | $600,000.00 | $835,000.00 |
$835,000.00
| $650,934.00 | $719,670.00 |
| 300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
0.05
| 3 | CY | $1,400.00 | $1,500.00 |
$4,500.00
| $980.00 | $1,000.00 |
| 300.02.003 | UNCLASSIFIED EXCAVATION |
0.08
| 193 | CY | $175.00 | $33.00 |
$6,369.00
| $157.60 | $200.00 |
| 300.05.002 | IMPORTED BORROW |
0.13
| 75 | CY | $500.00 | $150.00 |
$11,250.00
| $154.00 | $150.00 |
| 301.02.005 | CRUSHED MISCELLANEOUS BASE |
0.19
| 150 | CY | $250.00 | $105.00 |
$15,750.00
| $133.80 | $100.00 |
| 302.05.008 | AC CURB, TYPE D1-8 |
0.16
| 443 | LF | $95.00 | $30.00 |
$13,290.00
| $25.40 | $20.00 |
| 302.05.013 | AC PAVEMENT |
0.52
| 200 | TON | $500.00 | $220.00 |
$44,000.00
| $276.20 | $250.00 |
| 303.01.003 | STRUCTURE CONCRETE |
0.08
| 2 | CY | $9,200.00 | $3,200.00 |
$6,400.00
| $5,100.00 | $5,000.00 |
| 303.01.041 | BAR REINFORCING STEEL |
0.02
| 421 | LB | $19.00 | $5.00 |
$2,105.00
| $26.40 | $10.00 |
| 304.01.015 | STRUCTURAL STEEL |
0.34
| 1527 | LB | $36.00 | $19.00 |
$29,013.00
| $38.00 | $21.00 |
| 601.09.011 | TRAFFIC CONTROL |
0.05
| 1 | LS | $20,000.00 | $4,000.00 |
$4,000.00
| $36,208.00 | $25,000.00 |
| | BATTERY CHARGERS AND WIRE/CONDUIT |
0.37
| 3 | EA | $6,000.00 | $10,500.00 |
$31,500.00
| $19,304.40 | $16,022.00 |
| | BATTERIES WITH BATTERY SHELVES AND WIRE/CONDUIT |
0.19
| 1 | EA | $2,000.00 | $16,000.00 |
$16,000.00
| $28,882.60 | $16,000.00 |
| | DRILL AND BOND ANCHOR (EPOXY CARTRIDGE) |
0.10
| 77 | LF | $310.00 | $110.00 |
$8,470.00
| $154.00 | $110.00 |
| | DISCHARGE LINES REHABILITATION |
2.95
| 1 | LS | $275,000.00 | $250,000.00 |
$250,000.00
| $209,977.40 | $200,000.00 |
| | DEMOLITION |
1.43
| 1 | LS | $175,000.00 | $121,000.00 |
$121,000.00
| $209,286.00 | $200,000.00 |
| | GAS DETECTION PANEL WITH COMBUSTIBLE GAS SENSORS AND WIRE/CONDUIT |
0.59
| 1 | LS | $30,000.00 | $50,000.00 |
$50,000.00
| $51,845.40 | $50,000.00 |
| | FLOAT SWITCH ENCLOSURE AND WIRE/CONDUIT |
0.37
| 1 | EA | $20,000.00 | $31,000.00 |
$31,000.00
| $52,601.80 | $70,000.00 |
| | EXTERIOR ALARM LIGHTS AND WIRE/CONDUIT |
0.18
| 1 | LS | $10,000.00 | $15,000.00 |
$15,000.00
| $24,339.00 | $34,000.00 |
| | EROSION PROTECTION BLANKET |
0.04
| 504 | SY | $20.00 | $7.50 |
$3,780.00
| $61.10 | $30.00 |
| | EROSION PROTECTION BLANKET MAINTENANCE AND ESTABLISHMENT |
0.06
| 1 | LS | $6,000.00 | $5,000.00 |
$5,000.00
| $12,800.00 | $5,000.00 |
| | ENGINE CONTROLLER AND WIRE/CONDUIT |
1.77
| 2 | EA | $50,000.00 | $75,000.00 |
$150,000.00
| $85,710.40 | $75,000.00 |
| | INTRUSION ALARM PANEL WITH DOOR CONTACT SWITCHES AND WIRE/CONDUIT |
0.59
| 1 | LS | $25,000.00 | $50,000.00 |
$50,000.00
| $42,016.20 | $50,000.00 |
| | NO. 3/0 AWG CONDUCTOR |
0.06
| 100 | LF | $40.00 | $50.00 |
$5,000.00
| $171.60 | $55.00 |
| | NO. 300 KCMIL CONDUCTOR |
0.12
| 300 | LF | $50.00 | $33.50 |
$10,050.00
| $113.30 | $68.00 |
| | MISCELLANEOUS MECHANICAL WORKS |
0.25
| 1 | LS | $125,000.00 | $21,000.00 |
$21,000.00
| $126,586.80 | $50,000.00 |
| | MISCELLANEOUS ELECTRICAL WORK |
1.18
| 1 | LS | $80,500.00 | $100,000.00 |
$100,000.00
| $150,729.40 | $118,647.00 |
| | LIGHTING AND WIRE/CONDUIT |
2.01
| 1 | LS | $100,000.00 | $170,000.00 |
$170,000.00
| $200,299.20 | $170,000.00 |
| | PORTABLE GENERATOR RENTAL |
1.65
| 7 | MTH | $12,000.00 | $20,000.00 |
$140,000.00
| $63,601.20 | $25,000.00 |
| | PIPE GATE PER STD PLAN 602, W=16' |
0.09
| 1 | EA | $11,000.00 | $8,000.00 |
$8,000.00
| $11,316.00 | $8,580.00 |
| | OPERATIONAL TESTS |
0.24
| 1 | LS | $50,000.00 | $20,000.00 |
$20,000.00
| $42,000.00 | $25,000.00 |
| | REMOVE EXISTING CHAIN LINK FENCE AND GATE |
0.01
| 22 | LF | $85.00 | $35.00 |
$770.00
| $101.00 | $50.00 |
| | REHABILITATION OF EXISTING FLAP GATES |
0.61
| 1 | LS | $90,000.00 | $52,000.00 |
$52,000.00
| $79,304.00 | $84,520.00 |
| | PUMP HEATERS WIRE/CONDUIT ONLY |
0.27
| 200 | LF | $100.00 | $115.00 |
$23,000.00
| $164.20 | $174.00 |
| | PRESSURE TANSDUCER ENCLOSURE AND WIRE/CONDUIT |
0.46
| 1 | EA | $20,000.00 | $39,200.00 |
$39,200.00
| $46,001.80 | $54,000.00 |
| | STRUCTURAL STAINLESS STEEL |
0.22
| 407 | LB | $50.00 | $45.00 |
$18,315.00
| $140.60 | $100.00 |
| | SOUTHERN CALIFORNIA EDISON (ALLOWANCE $30,000) |
0.35
| 30000 | AL | $1.00 | $1.00 |
$30,000.00
| $1.00 | $1.00 |
| | SHORT-CIRCUIT, COORDINATION, AND ARC-FLASH STUDY |
0.24
| 1 | LS | $8,000.00 | $20,000.00 |
$20,000.00
| $18,935.20 | $15,000.00 |
| | REMOVE EXISTING PIPE GATE |
0.01
| 1 | EA | $1,150.00 | $600.00 |
$600.00
| $2,700.00 | $1,500.00 |
| | TEMPORARY SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT |
0.83
| 1 | EA | $20,000.00 | $70,000.00 |
$70,000.00
| $74,425.00 | $70,000.00 |
| | TEMPORARY MAIN CONTROL PANEL AND WIRE/CONDUIT |
1.89
| 2 | EA | $40,000.00 | $80,000.00 |
$160,000.00
| $46,706.20 | $34,531.00 |
| | TELEMETRY CABINET WITH ANTENNA AND WIRE/CONDUIT |
0.45
| 1 | LS | $20,000.00 | $38,500.00 |
$38,500.00
| $48,616.20 | $38,500.00 |
| | SWITCHBOARD, MOTOR CONTROL CENTER, BUSDUCT, AND INCOMING SECTION |
12.10
| 1 | LS | $850,000.00 | $1,025,000.00 |
$1,025,000.00
| $986,215.20 | $850,000.00 |
| | SUMP PUMP WIRE/CONDUIT ONLY |
0.10
| 35 | LF | $100.00 | $230.00 |
$8,050.00
| $608.00 | $614.00 |
| | VERTICAL AXIAL FLOW PROPELLER PUMP WITH ELECTRIC MOTOR |
36.59
| 4 | EA | $564,150.00 | $775,000.00 |
$3,100,000.00
| $813,200.00 | $775,000.00 |
| | BUBBLER PANEL AND WIRE/CONDUIT |
0.80
| 1 | EA | $25,000.00 | $68,000.00 |
$68,000.00
| $55,858.00 | $50,000.00 |
| | CENTRAL CONTROLLER AND WIRE/CONDUIT |
0.48
| 1 | EA | $60,000.00 | $41,000.00 |
$41,000.00
| $65,956.80 | $58,000.00 |
| | CHAIN LINK FENCE, 5' HIGH WITH BARBED WIRE |
0.07
| 16 | LF | $125.00 | $360.00 |
$5,760.00
| $723.40 | $500.00 |
| | CHAIN LINK GATE, 5' HIGH WITH BARBED WIRE |
0.14
| 1 | EA | $3,000.00 | $12,000.00 |
$12,000.00
| $11,002.00 | $10,000.00 |
| | ADJUST CATHODIC PROTECTION COVER |
0.01
| 1 | EA | $800.00 | $500.00 |
$500.00
| $1,890.00 | $1,000.00 |
| | ANNUNCIATOR AND WIRE/CONDUIT |
0.68
| 1 | EA | $50,000.00 | $58,000.00 |
$58,000.00
| $67,599.20 | $68,000.00 |
| | VERTICAL AXIAL FLOW PROPELLER PUMP WITH RIGHT ANGLE GEAR DRIVE |
15.34
| 2 | EA | $470,700.00 | $650,000.00 |
$1,300,000.00
| $791,000.00 | $750,000.00 |
| | 3-INCH PVC COATED RMC |
0.38
| 210 | LF | $150.00 | $152.00 |
$31,920.00
| $441.60 | $300.00 |
| | 1/2 TON HOIST SYSTEM |
0.66
| 1 | LS | $65,000.00 | $56,000.00 |
$56,000.00
| $63,600.00 | $56,000.00 |
| | Total Percent | 100 | | | | Total Amount | $8,472,592.00 | | |