| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.01
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.04
| 15 | MTH | $500.00 | $500.00 |
$7,500.00
| $500.00 | $500.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.17
| 1 | LS | $43,590.00 | $34,000.00 |
$34,000.00
| $33,660.00 | $28,250.00 |
| 001.07.005 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) |
0.01
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.07.007 | IMPLEMENTATION OF THE SWPPP |
1.58
| 1 | LS | $53,200.00 | $324,000.00 |
$324,000.00
| $219,717.41 | $247,576.41 |
| 001.07.021 | SHORING OF OPEN EXCAVATIONS |
0.17
| 1 | LS | $8,180.00 | $35,000.00 |
$35,000.00
| $85,330.00 | $45,500.00 |
| 001.07.045 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
0.05
| 1 | LS | $50,000.00 | $10,000.00 |
$10,000.00
| $21,730.00 | $20,000.00 |
| 001.08.005 | OFFICE FACILITIES |
0.37
| 15 | MTH | $10,000.00 | $5,000.00 |
$75,000.00
| $11,810.53 | $6,950.00 |
| 001.09.003 | MOBILIZATION |
10.26
| 1 | LS | $572,925.00 | $2,100,000.00 |
$2,100,000.00
| $1,973,671.36 | $2,162,830.01 |
| 300.01.003 | CLEARING AND GRUBBING |
0.24
| 1 | LS | $57,290.00 | $50,000.00 |
$50,000.00
| $127,413.00 | $68,065.00 |
| 300.01.063 | AC PAVEMENT REMOVAL |
0.10
| 27630 | SF | $2.46 | $0.75 |
$20,722.50
| $1.54 | $1.08 |
| 300.02.003 | UNCLASSIFIED EXCAVATION |
1.74
| 8927 | CY | $22.36 | $40.00 |
$357,080.00
| $48.40 | $40.00 |
| 304.02.013 | CABLE RAILING (CALTRANS STD PLAN B11-47) |
0.05
| 71 | LF | $40.99 | $150.00 |
$10,650.00
| $265.27 | $260.50 |
| 306.01.308 | 6" DUCTILE IRON PIPE |
0.13
| 50 | LF | $163.60 | $520.00 |
$26,000.00
| $526.80 | $275.00 |
| 500.00.015 | VIDEO INSPECTION |
0.08
| 1 | LS | $16,370.00 | $15,510.00 |
$15,510.00
| $16,156.00 | $11,880.00 |
| | PERMEABLE ZONE MATERIAL |
1.05
| 2691 | CY | $178.41 | $80.00 |
$215,280.00
| $132.40 | $143.50 |
| | PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED PRICE OF $15,000) |
0.07
| 1 | LS | $15,000.00 | $15,000.00 |
$15,000.00
| $15,000.00 | $15,000.00 |
| | PREPARATION OF THE FUGITIVE DUST CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.01
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| | PREPARATION OF THE SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $10,500) |
0.05
| 1 | LS | $10,500.00 | $10,500.00 |
$10,500.00
| $10,500.00 | $10,500.00 |
| | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $5,000) |
0.02
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
| | PREPARATION OF THE SPILL PREVENTION AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.01
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| | REMOVABLE BOLLARD |
0.03
| 2 | EA | $3,275.00 | $3,000.00 |
$6,000.00
| $3,394.73 | $3,000.00 |
| | REMOVAL AND DISPOSAL OF LBP/LCP WASTE |
0.07
| 1 | LS | $5,000.00 | $14,000.00 |
$14,000.00
| $33,043.00 | $25,550.00 |
| | REMOVE EXISTING LONGITUDINAL GUTTER |
0.02
| 77 | LF | $32.75 | $40.00 |
$3,080.00
| $35.70 | $29.50 |
| | REMOVE EXISTING CHAIN LINK FENCE AND PIPE GATE |
0.03
| 266 | LF | $16.35 | $20.00 |
$5,320.00
| $20.20 | $20.00 |
| | REMOVE EXISTING STAFF GAGE POSTS |
0.01
| 9 | EA | $408.89 | $300.00 |
$2,700.00
| $380.20 | $323.00 |
| | REMOVE EXISTING TREES |
0.16
| 16 | EA | $7,453.13 | $2,000.00 |
$32,000.00
| $2,923.45 | $2,662.50 |
| | REMOVE EXISTING INTAKE TOWER, CATWALK, AND STAIRWAY |
0.49
| 1 | LS | $49,100.00 | $100,000.00 |
$100,000.00
| $88,794.20 | $84,100.00 |
| | SPILLWAY WALL BUTTRESS COMPLETE IN PLACE |
29.32
| 1 | LS | $4,816,380.00 | $6,000,000.00 |
$6,000,000.00
| $4,821,882.54 | $4,450,000.00 |
| | SPLASH WALL |
0.03
| 1 | CY | $1,000.00 | $6,700.00 |
$6,700.00
| $2,945.00 | $1,475.00 |
| | STRUCTURE & ROADWAY FOUNDATION PREPARATION |
0.73
| 2478 | CY | $49.10 | $60.00 |
$148,680.00
| $101.44 | $52.50 |
| | TEMPORARY SOUND BARRIER |
0.32
| 1000 | LF | $596.25 | $65.00 |
$65,000.00
| $307.40 | $304.00 |
| | TOE DRAIN WEIR VAULT |
0.11
| 1 | LS | $16,370.00 | $22,000.00 |
$22,000.00
| $93,557.87 | $69,250.00 |
| | TRUCK WHEEL STOP |
0.01
| 1 | EA | $820.00 | $1,700.00 |
$1,700.00
| $1,599.00 | $1,450.00 |
| | TREE PRUNING ($30,000 ALLOWANCE) |
0.15
| 30000 | AL | $1.00 | $1.00 |
$30,000.00
| $1.00 | $1.00 |
| | 18" WIDE CONCRETE V-DITCH |
0.46
| 627 | LF | $25.00 | $150.00 |
$94,050.00
| $112.02 | $130.00 |
| | 12"X12" PVC CATCH BASIN |
0.01
| 1 | EA | $1,640.00 | $2,800.00 |
$2,800.00
| $2,474.57 | $2,500.00 |
| | 4" CPVC GATE VALVE |
0.01
| 1 | EA | $1,640.00 | $2,400.00 |
$2,400.00
| $6,432.30 | $5,050.00 |
| | 4" PVC PIPE |
0.02
| 30 | LF | $82.00 | $160.00 |
$4,800.00
| $209.50 | $169.00 |
| | 3' WIDE CONCRETE V-DITCH |
0.09
| 75 | LF | $49.07 | $235.00 |
$17,625.00
| $236.90 | $222.00 |
| | 48" RCP & APPURTENANCES |
0.53
| 150 | LF | $676.20 | $720.00 |
$108,000.00
| $749.19 | $745.47 |
| | 5' TALL CHAIN LINK FENCE |
0.14
| 170 | LF | $60.00 | $170.00 |
$28,900.00
| $158.27 | $146.00 |
| | 48" POOL DRAIN CIPP LINER |
1.44
| 330 | LF | $1,391.30 | $893.00 |
$294,690.00
| $1,030.59 | $945.95 |
| | 8" NON-PERFORATED HDPE PIPE & APPURTENANCES |
0.04
| 122 | LF | $73.69 | $70.00 |
$8,540.00
| $136.70 | $105.00 |
| | 8" PERFORATED HDPE PIPE & APPURTENANCES |
0.07
| 289 | LF | $81.83 | $50.00 |
$14,450.00
| $48.10 | $44.00 |
| | 8" CLEANOUT RISER |
0.12
| 4 | EA | $823.00 | $6,100.00 |
$24,400.00
| $3,319.20 | $3,006.00 |
| | 8" DUCK BILL CHECK VALVE |
0.03
| 1 | EA | $3,270.00 | $6,800.00 |
$6,800.00
| $5,571.30 | $5,000.00 |
| | AS-BUILT SCHEDULE (STIPULATED UNIT PRICE OF $1,000) |
0
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| | BAT EXCLUSION DEVICES ($10,000 ALLOWANCE) |
0.05
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| | AUTOMATED DATA ACQUISITION SYSTEM (ADAS) |
0.35
| 1 | LS | $163,680.00 | $72,000.00 |
$72,000.00
| $250,119.70 | $115,950.00 |
| | CATWALK & STAIRWAY COMPLETE IN PLACE |
0.90
| 1 | LS | $47,960.00 | $184,000.00 |
$184,000.00
| $173,087.60 | $167,858.00 |
| | CATWALK STRUCTURAL (STEEL, PLATE, HANDRAILING) |
2.69
| 1 | LS | $182,740.00 | $550,000.00 |
$550,000.00
| $506,150.00 | $397,500.00 |
| | BUTTRESS FILL |
4.44
| 16505 | CY | $29.81 | $55.00 |
$907,775.00
| $52.00 | $44.50 |
| | CHANNEL WALL REPAIR |
0.04
| 1 | LS | $8,180.00 | $7,500.00 |
$7,500.00
| $17,369.59 | $7,760.00 |
| | CRUSHED ROCK |
3.47
| 3548 | CY | $104.34 | $200.00 |
$709,600.00
| $161.73 | $157.50 |
| | CONTROL BUILDING |
3.42
| 1 | LS | $286,450.00 | $700,000.00 |
$700,000.00
| $888,627.48 | $700,500.00 |
| | DELETED (BID ITEM 70) |
0
| 1 | LS | $0.00 | $0.00 |
$0.00
| $0.00 | $0.00 |
| | DELETED (BID ITEM 49) |
0
| 1 | LS | $0.00 | $0.00 |
$0.00
| $0.00 | $0.00 |
| | DECOMPOSED GRANITE PAVEMENT, 8" THICK |
0.45
| 3660 | SF | $130.00 | $25.00 |
$91,500.00
| $15.99 | $17.00 |
| | DECOMMISSION EXISTING PIEZOMETERS |
0.14
| 3 | EA | $8,183.33 | $9,500.00 |
$28,500.00
| $6,718.70 | $5,100.00 |
| | DAVIT CRANE |
0.04
| 1 | LS | $7,370.00 | $9,000.00 |
$9,000.00
| $48,415.65 | $32,350.00 |
| | DELETED (BID ITEM 61) |
0
| 1 | LS | $0.00 | $0.00 |
$0.00
| $0.00 | $0.00 |
| | DELETED (BID ITEM 63) |
0
| 1 | LS | $0.00 | $0.00 |
$0.00
| $0.00 | $0.00 |
| | ELECTRICAL WORK |
2.22
| 1 | LS | $899,990.00 | $454,000.00 |
$454,000.00
| $702,898.50 | $644,662.00 |
| | DOWNSTREAM RIPRAP (CLASS IV) |
2.77
| 7571 | CY | $225.00 | $75.00 |
$567,825.00
| $208.92 | $215.00 |
| | FIXED METAL BOLLARD |
0.04
| 5 | EA | $2,456.00 | $1,830.00 |
$9,150.00
| $2,678.11 | $2,177.00 |
| | GROUTED ROCK CURB & GUTTER |
0.02
| 32 | LF | $1,000.00 | $150.00 |
$4,800.00
| $1,204.65 | $176.50 |
| | IMPLEMENTATION OF THE FUGITIVE DUST CONTROL PLAN |
0.73
| 15 | MTH | $3,000.00 | $10,000.00 |
$150,000.00
| $11,533.85 | $9,250.00 |
| | IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN ($300,000 ALLOWANCE) |
1.47
| 300000 | AL | $1.00 | $1.00 |
$300,000.00
| $1.00 | $1.00 |
| | INSTALLATION OF WILDLIFE EXCLUSIONARY FENCING |
0.34
| 3500 | LF | $10.00 | $20.00 |
$70,000.00
| $12.06 | $8.75 |
| | INSTRUMENTATION |
2.08
| 1 | LS | $447,190.00 | $425,000.00 |
$425,000.00
| $561,982.00 | $613,000.00 |
| | INTAKE TOWER COMPLETE IN PLACE |
7.33
| 1 | LS | $916,730.00 | $1,500,000.00 |
$1,500,000.00
| $1,396,449.03 | $1,552,500.00 |
| | INSTALLATION OF ESA FENCING |
0.08
| 2000 | LF | $6.00 | $8.50 |
$17,000.00
| $10.57 | $8.25 |
| | INTAKE TOWER GATE & ACTUATOR |
1.12
| 1 | LS | $81,840.00 | $230,000.00 |
$230,000.00
| $283,923.60 | $210,000.00 |
| | INTAKE TOWER TRASH RACK COMPLETE IN PLACE |
2.17
| 1 | LS | $16,370.00 | $445,000.00 |
$445,000.00
| $252,696.53 | $138,000.00 |
| | INTAKE TRASH RACK |
0.61
| 5 | EA | $128,492.00 | $25,000.00 |
$125,000.00
| $100,750.92 | $107,355.59 |
| | MAINTENANCE AND REMOVAL OF TEMPORARY SOUND BARRIER |
0.15
| 1000 | LF | $80.00 | $30.00 |
$30,000.00
| $32.58 | $20.00 |
| | MAINTENANCE AND REMOVAL OF WILDLIFE EXCLUSIONARY FENCING |
0.19
| 3500 | LF | $2.00 | $11.00 |
$38,500.00
| $13.91 | $10.50 |
| | MAINTENANCE AND REMOVAL OF ESA FENCING |
0.07
| 2000 | LF | $2.00 | $7.50 |
$15,000.00
| $18.54 | $5.18 |
| | LONGITUDINAL GUTTER |
0.07
| 73 | LF | $81.78 | $200.00 |
$14,600.00
| $223.70 | $207.50 |
| | METAL BEAM GUARD RAILING |
0.26
| 405 | LF | $65.48 | $131.00 |
$53,055.00
| $147.25 | $148.00 |
| | NEW STAFF GAGE BOARDS |
0.08
| 6 | EA | $52,171.67 | $2,800.00 |
$16,800.00
| $2,396.00 | $2,400.00 |
| | NOISE MONITORING AND REPORTING |
0.29
| 15 | MTH | $6,000.00 | $4,000.00 |
$60,000.00
| $5,260.38 | $4,000.00 |
| | MSE RETAINING WALLS |
1.47
| 1500 | SF | $223.59 | $200.00 |
$300,000.00
| $190.75 | $185.00 |
| | OGEE WEIR COMPLETE IN PLACE |
2
| 1 | LS | $380,110.00 | $410,000.00 |
$410,000.00
| $622,311.90 | $315,000.00 |
| | PCC CURB & GUTTER, TYPE B2 |
0.06
| 124 | LF | $1,000.00 | $106.00 |
$13,144.00
| $124.92 | $117.50 |
| | PCC CURB & GUTTER, TYPE A2 |
0.05
| 98 | LF | $50.00 | $105.00 |
$10,290.00
| $159.20 | $130.00 |
| | PCC PAVEMENT & PCC WALKWAY |
3.23
| 1202 | CY | $819.83 | $550.00 |
$661,100.00
| $794.31 | $762.50 |
| | UPSTREAM RIPRAP (CLASS V) |
2.15
| 8792 | CY | $260.00 | $50.00 |
$439,600.00
| $187.49 | $174.00 |
| | WATER TRUCK |
2.29
| 260 | DAY | $2,000.00 | $1,800.00 |
$468,000.00
| $1,366.00 | $1,361.50 |
| | Total Percent | 100 | | | | Total Amount | $20,464,616.50 | | |