| Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
| 001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.16
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| 001.06.003 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.16
| 5 | MTH | $500.00 | $500.00 |
$2,500.00
| $500.00 | $500.00 |
| 001.06.007 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.06
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
| 001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.64
| 1 | LS | $10,000.00 | $9,900.00 |
$9,900.00
| $13,550.86 | $7,000.00 |
| 001.07.003 | IMPLEMENTATION OF BMPS |
1.19
| 1 | LS | $20,000.00 | $18,464.85 |
$18,464.85
| $20,169.12 | $18,464.85 |
| 001.07.021 | SHORING OF OPEN EXCAVATIONS |
1.07
| 1 | LS | $2,200.00 | $16,650.00 |
$16,650.00
| $19,017.00 | $20,000.00 |
| 001.07.023 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) |
0.19
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.025 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
0.36
| 1 | LS | $25,000.00 | $5,550.00 |
$5,550.00
| $4,422.86 | $5,000.00 |
| 001.07.037 | REMOVAL AND DISPOSAL OF LBP/LCP |
1.57
| 1 | LS | $25,000.00 | $24,420.00 |
$24,420.00
| $22,344.57 | $20,000.00 |
| 001.07.043 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
0.19
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.045 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
0.21
| 1 | LS | $30,000.00 | $3,330.00 |
$3,330.00
| $16,778.43 | $6,500.00 |
| 001.07.047 | PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3000) |
0.19
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 001.07.049 | IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN |
1.14
| 1 | LS | $20,000.00 | $17,760.00 |
$17,760.00
| $9,538.43 | $7,000.00 |
| 001.07.051 | REMOVAL AND DISPOSAL OF NON-HAZARDOUS ASBESTOS WASTE |
1.07
| 1 | LS | $25,000.00 | $16,650.00 |
$16,650.00
| $26,224.43 | $20,070.00 |
| 001.08.005 | OFFICE FACILITIES |
0.64
| 6 | MTH | $5,000.00 | $1,665.00 |
$9,990.00
| $3,083.14 | $3,000.00 |
| 001.09.003 | MOBILIZATION |
10.76
| 1 | LS | $63,221.67 | $167,610.00 |
$167,610.00
| $148,668.90 | $167,610.00 |
| 300.01.003 | CLEARING AND GRUBBING |
1.78
| 1 | LS | $3,200.00 | $27,750.00 |
$27,750.00
| $24,000.57 | $25,000.00 |
| 300.01.014 | TREE REMOVAL (13"-24" DIAMETER) |
0.57
| 1 | EA | $920.00 | $8,880.00 |
$8,880.00
| $6,067.86 | $3,000.00 |
| 300.01.057 | REMOVE EXISTING CHAIN LINK FENCE |
0.26
| 551 | LF | $20.00 | $7.22 |
$3,978.22
| $17.89 | $15.00 |
| 300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
1.17
| 40 | CY | $258.75 | $457.32 |
$18,292.80
| $360.90 | $351.00 |
| 300.02.003 | UNCLASSIFIED EXCAVATION |
5.75
| 938 | CY | $172.50 | $95.46 |
$89,541.48
| $86.38 | $95.46 |
| 300.03.003 | UNCLASSIFIED FILL |
0.14
| 4 | CY | $30.00 | $555.00 |
$2,220.00
| $322.14 | $185.00 |
| 301.02.005 | CRUSHED MISCELLANEOUS BASE |
0.50
| 97 | CY | $151.00 | $81.03 |
$7,859.91
| $122.00 | $102.00 |
| 303.01.315 | CATCH BASIN PER STD PLAN 304, 1 GRATES |
0.93
| 2 | EA | $10,000.00 | $7,215.00 |
$14,430.00
| $7,598.43 | $6,825.00 |
| 303.01.339 | JUNCTION STRUCTURE PER STD PLAN 331 |
1
| 2 | EA | $6,000.00 | $7,770.00 |
$15,540.00
| $5,874.71 | $6,164.00 |
| 303.05.043 | PCC WALK, 4" THICK |
0.48
| 134 | SF | $15.00 | $55.50 |
$7,437.00
| $25.04 | $18.00 |
| 303.05.050 | PCC CURB RAMPS |
0.25
| 1 | CY | $2,875.00 | $3,885.00 |
$3,885.00
| $3,042.14 | $3,885.00 |
| 303.05.059 | DETECTABLE WARNING SURFACE |
0.43
| 20 | SF | $57.50 | $333.00 |
$6,660.00
| $94.00 | $50.00 |
| 306.01.141 | IMPORTED TRENCH BACKFILL |
0.05
| 24 | CY | $39.00 | $33.30 |
$799.20
| $203.90 | $150.00 |
| 601.09.011 | TRAFFIC CONTROL |
0.86
| 1 | LS | $10,000.00 | $13,320.00 |
$13,320.00
| $44,502.57 | $13,320.00 |
| 601.09.017 | FLASHING ARROW SIGN |
0.36
| 1 | EA | $1,200.00 | $5,550.00 |
$5,550.00
| $5,134.00 | $3,362.00 |
| 601.09.019 | CHANGEABLE MESSAGE SIGN |
0.36
| 1 | EA | $2,700.00 | $5,550.00 |
$5,550.00
| $8,904.00 | $7,000.00 |
| 801.04.021 | LANDSCAPING |
2.88
| 1 | LS | $35,869.40 | $44,911.71 |
$44,911.71
| $68,539.96 | $62,000.00 |
| 801.05.003 | IRRIGATION SYSTEM |
8.01
| 1 | LS | $77,599.98 | $124,780.65 |
$124,780.65
| $165,469.24 | $150,000.00 |
| 801.06.011 | CONCRETE UNIT PAVER |
0.33
| 92 | SF | $17.25 | $55.50 |
$5,106.00
| $95.36 | $55.50 |
| 801.06.014 | GEOTEXTILE UNDER CONCRETE UNIT PAVERS |
0.10
| 92 | SF | $1.28 | $16.65 |
$1,531.80
| $6.31 | $5.00 |
| 801.06.015 | DECOMPOSED GRANITE, 4" THICK |
0.97
| 2277 | SF | $6.90 | $6.66 |
$15,164.82
| $6.67 | $6.66 |
| | PCC PAVING WITH INTEGRAL COLOR, 8" THICK |
1.07
| 274 | SF | $22.65 | $61.05 |
$16,727.70
| $31.86 | $25.00 |
| | PLAYGROUND CHIP MATERIAL |
0.17
| 6 | CY | $350.00 | $444.00 |
$2,664.00
| $377.86 | $250.00 |
| | PLANT ESTABLISHMENT PERIOD |
0.48
| 1 | LS | $17,066.00 | $7,437.00 |
$7,437.00
| $11,836.57 | $9,384.00 |
| | PET WASTE STATION |
0.09
| 1 | EA | $1,328.25 | $1,443.00 |
$1,443.00
| $1,824.00 | $1,853.00 |
| | PIEZOMETER SYSTEMS REPAIR |
2.14
| 1 | LS | $25,000.00 | $33,300.00 |
$33,300.00
| $23,377.29 | $20,000.00 |
| | PREFABRICATED GARAGE |
2.99
| 1 | LS | $23,000.00 | $46,620.00 |
$46,620.00
| $46,300.00 | $46,620.00 |
| | PUMP STATION |
2.90
| 1 | LS | $30,000.00 | $45,211.41 |
$45,211.41
| $46,012.34 | $50,000.00 |
| | RELOCATE EXISTING AIR RELEASE AND VACUUM VALVE |
0.36
| 1 | LS | $2,500.00 | $5,550.00 |
$5,550.00
| $3,469.00 | $3,500.00 |
| | RELOCATE EXISTING CMB |
0.53
| 1 | LS | $3,600.00 | $8,325.00 |
$8,325.00
| $4,852.29 | $2,390.00 |
| | RELOCATE EXISTING STORAGE STRUCTURE |
0.36
| 1 | LS | $800.00 | $5,550.00 |
$5,550.00
| $4,206.57 | $2,661.00 |
| | REMOVE CMU CURB |
0.04
| 54 | LF | $17.00 | $11.10 |
$599.40
| $25.16 | $25.00 |
| | REMOVE ASSISTANT DAM OPERATOR'S GARAGE |
0.93
| 1 | LS | $10,000.00 | $14,430.00 |
$14,430.00
| $16,437.57 | $10,000.00 |
| | REMOVE ASSISTANT DAM OPERATOR'S HOUSE AND FOUNDATION |
0.93
| 1 | LS | $30,000.00 | $14,430.00 |
$14,430.00
| $22,363.43 | $20,000.00 |
| | REMOVE EXISTING CONCRETE WALL AND CHAIN LINK FENCE SEGMENT AND REPAIR |
0.86
| 1 | LS | $2,500.00 | $13,320.00 |
$13,320.00
| $4,962.43 | $3,300.00 |
| | REMOVE EXISTING CHAIN LINK/STEEL GATE |
0.29
| 4 | EA | $1,000.00 | $1,110.00 |
$4,440.00
| $601.43 | $455.00 |
| | REMOVE EXISTING ABANDONED WATER METER |
0.07
| 1 | LS | $3,000.00 | $1,110.00 |
$1,110.00
| $811.71 | $981.00 |
| | REMOVE EXISTING CATCH BASIN 304-3 |
0.57
| 2 | EA | $2,500.00 | $4,440.00 |
$8,880.00
| $1,414.57 | $850.00 |
| | SIGN REFURBISHMENT |
0.36
| 1 | LS | $1,000.00 | $5,550.00 |
$5,550.00
| $3,596.29 | $2,000.00 |
| | SIGN POST ANCHOR AND SLEEVING FOR TEMPORARY TRAFFIC SIGNS |
0.03
| 2 | EA | $175.00 | $222.00 |
$444.00
| $491.71 | $420.00 |
| | THERMOPLASTIC PAVEMENT MARKING |
0.28
| 283 | SF | $6.90 | $15.54 |
$4,397.82
| $25.36 | $25.00 |
| | TRENCH BACKFILL SAND |
0.05
| 24 | CY | $25.00 | $33.30 |
$799.20
| $160.90 | $100.00 |
| | TREE PROTECTION FENCING |
0.36
| 1 | LS | $2,358.72 | $5,550.00 |
$5,550.00
| $3,884.57 | $4,500.00 |
| | TUBULAR STEEL GATE - AT DRIVEWAY |
0.66
| 1 | EA | $9,000.00 | $10,234.20 |
$10,234.20
| $20,288.60 | $17,000.00 |
| | TUBULAR STEEL GATE - AT SLIP ROAD |
1.77
| 1 | EA | $30,000.00 | $27,516.90 |
$27,516.90
| $37,874.41 | $36,000.00 |
| | TUBULAR STEEL SLIDING GATE |
2.75
| 1 | EA | $30,000.00 | $42,746.10 |
$42,746.10
| $45,431.01 | $42,746.10 |
| | TUBULAR POST AND CONCRETE FOOTING |
0.08
| 1 | EA | $500.00 | $1,248.75 |
$1,248.75
| $2,188.54 | $1,248.75 |
| | TUBULAR STEEL FENCE |
7.59
| 512 | LF | $250.00 | $230.88 |
$118,210.56
| $312.27 | $291.00 |
| | UNCLASSIFIED EXCAVATION (TRENCH) |
0.57
| 72 | CY | $240.00 | $123.21 |
$8,871.12
| $131.60 | $140.00 |
| | 1-1/2 INCH DIAMETER NON-METALLIC PVC SCHD 40 CONDUIT, FITTINGS & SUPPORTS |
0.56
| 300 | LF | $40.00 | $28.86 |
$8,658.00
| $25.98 | $26.00 |
| | 1-1/2 INCH DIAMETER RIGID STEEL CONDUIT, FITTINGS & SUPPORTS |
0.07
| 20 | LF | $100.00 | $51.06 |
$1,021.20
| $80.58 | $75.00 |
| | 1-1/2 INCH LIQUID TIGHT FLEXIBLE METALLIC CONDUIT, FITTINGS & SUPPORTS |
0.01
| 2 | LF | $30.00 | $42.18 |
$84.36
| $244.74 | $100.00 |
| | 1 INCH DIAMETER NON-METALLIC PVC SCHD 40 CONDUIT, FITTINGS & SUPPORTS |
0.14
| 80 | LF | $30.00 | $26.64 |
$2,131.20
| $35.09 | $24.00 |
| | 1 INCH DIAMETER RIGID STEEL CONDUIT, FITTINGS & SUPPORTS |
0.05
| 20 | LF | $90.00 | $39.96 |
$799.20
| $61.71 | $51.00 |
| | #8 AWG WIRE INSULATION TYPE THWN-2 |
0.21
| 850 | LF | $8.00 | $3.89 |
$3,306.50
| $6.27 | $5.00 |
| | #2 AWG WIRE INSULATION TYPE THWN-2 |
0.34
| 600 | LF | $10.00 | $8.88 |
$5,328.00
| $10.98 | $11.00 |
| | #12 AWG WIRE INSULATION TYPE THWN-2 |
0
| 20 | LF | $4.00 | $2.22 |
$44.40
| $15.75 | $10.00 |
| | 18" RCP, 2000 D |
0.78
| 22 | LF | $550.00 | $555.00 |
$12,210.00
| $360.00 | $200.00 |
| | 3/4 INCH DIAMETER NON-METALLIC PVC SCHD 40 CONDUIT, FITTINGS & SUPPORTS |
0.08
| 50 | LF | $20.00 | $25.53 |
$1,276.50
| $31.65 | $25.53 |
| | 3/4 INCH DIAMETER RIGID STEEL CONDUIT, FITTINGS & SUPPORTS |
0.04
| 20 | LF | $20.00 | $31.08 |
$621.60
| $52.30 | $40.00 |
| | 3/4 INCH DIAMTER X 10 FEET CU-CLAD GROUND ROD AND GROUND WELL |
0.23
| 2 | EA | $1,000.00 | $1,768.23 |
$3,536.46
| $2,038.18 | $2,232.00 |
| | 4#12 AWG LOW VOLTAGE CONTROL CABLE FOR GATE ACCESS KEYPAD |
0.01
| 20 | LF | $4.00 | $8.88 |
$177.60
| $28.27 | $12.00 |
| | AC PAVEMENT (PACTCHBACK) |
0.75
| 21 | TON | $610.00 | $555.00 |
$11,655.00
| $542.86 | $555.00 |
| | AGRONOMIC SOIL REPORTS |
0.01
| 1 | EA | $330.00 | $163.17 |
$163.17
| $1,059.45 | $1,000.00 |
| | ACCEPTANCE TESTING |
0.25
| 1 | LS | $1,000.00 | $3,967.14 |
$3,967.14
| $5,952.88 | $5,005.00 |
| | BOULDER/ SEATING BOULDER |
1.94
| 112 | EA | $362.25 | $269.73 |
$30,209.76
| $588.25 | $339.00 |
| | BIKE RACK |
0.18
| 2 | EA | $937.25 | $1,387.50 |
$2,775.00
| $1,077.36 | $1,387.50 |
| | BIOSWALE |
1.04
| 1 | LS | $11,206.75 | $16,206.00 |
$16,206.00
| $54,112.29 | $30,000.00 |
| | CIRCUIT BREAKER 20 AMP 1-POLE |
0.01
| 1 | EA | $200.00 | $134.31 |
$134.31
| $468.76 | $230.00 |
| | CIRCUIT BREAKER 20 AMP 2-POLE |
0.01
| 1 | EA | $250.00 | $178.71 |
$178.71
| $519.53 | $275.00 |
| | CHANNEL STRUTS, SUPPORTS, AND HARDWARE |
0.05
| 1 | LS | $1,500.00 | $743.70 |
$743.70
| $1,922.81 | $2,000.00 |
| | CLASS "A" TOPSOIL |
3.49
| 532 | CY | $69.00 | $102.12 |
$54,327.84
| $108.45 | $103.00 |
| | CIRCUIT BREAKER 90 AMP 2-POLE |
0.04
| 1 | EA | $350.00 | $594.96 |
$594.96
| $679.71 | $594.96 |
| | CONCRETE HEADER, 6"X12" |
2.35
| 550 | LF | $18.40 | $66.60 |
$36,630.00
| $46.66 | $45.00 |
| | CONCRETE CURB AROUND EXISTING CATCH BASIN |
0.13
| 11 | LF | $18.40 | $183.15 |
$2,014.65
| $94.31 | $50.00 |
| | CONCRETE TRASH RECEPTACLE |
0.38
| 1 | EA | $1,328.25 | $5,883.00 |
$5,883.00
| $3,537.57 | $3,500.00 |
| | DUPLEX RECEPTACLE, NEMA 5-20R, GFCI |
0.01
| 1 | EA | $100.00 | $231.99 |
$231.99
| $431.28 | $275.00 |
| | GRADING |
4.52
| 20097 | SF | $1.00 | $3.50 |
$70,339.50
| $2.43 | $2.00 |
| | FUSED DISCONNECT SWITCH 100 AMP FRAME, 70 AMP FUSES, NEMA 3R |
0.08
| 1 | EA | $500.00 | $1,264.29 |
$1,264.29
| $1,574.33 | $1,264.29 |
| | INTERPRETIVE KIOSK |
0.71
| 1 | LS | $25,000.00 | $11,100.00 |
$11,100.00
| $15,483.57 | $12,195.00 |
| | INTERPRETIVE SIGN AND PEDESTAL |
0.43
| 1 | LS | $1,811.25 | $6,660.00 |
$6,660.00
| $7,071.43 | $5,855.00 |
| | JUTE MATTING |
0.11
| 2484 | SF | $14.95 | $0.67 |
$1,664.28
| $2.08 | $1.00 |
| | JUNCTION BOX, 8"X8"X8" NEMA 4X S.S. 304 WITH GASKETD HINGED COVER |
0.03
| 1 | EA | $500.00 | $446.22 |
$446.22
| $1,319.03 | $1,000.00 |
| | MISCELLANEOUS ELECTRICAL WORK |
2.09
| 1 | LS | $2,500.00 | $32,523.00 |
$32,523.00
| $49,309.86 | $25,000.00 |
| | NO.5 PULL BOX, TRAFFIC RATED |
0.49
| 3 | EA | $2,500.00 | $2,527.47 |
$7,582.41
| $2,343.78 | $2,500.00 |
| | NON-FUSED DISCONNECT SWITCH 30 AMP FRAME, NEMA 3R |
0.02
| 1 | EA | $400.00 | $249.75 |
$249.75
| $1,075.82 | $1,000.00 |
| | PCC BASE, 4" THICK |
0.12
| 92 | SF | $15.00 | $19.98 |
$1,838.16
| $19.28 | $15.00 |
| | PAINT INTERIOR AND EXTERIOR OF EXISTING RESTROOM |
0.64
| 450 | SF | $1.50 | $22.20 |
$9,990.00
| $35.03 | $14.00 |
| | PCC DRIVEWAY, 8" THICK |
1.56
| 1217 | SF | $21.25 | $19.98 |
$24,315.66
| $24.85 | $25.00 |
| | Total Percent | 100 | | | | Total Amount | $1,557,003.12 | | |