Bid Price History

Avocado Heights San Jose Hills - Valley Boulevard
$6,672,329.21
08/18/2026
637 (G3),679 (B3),638 (A5),678 (J2),637 (H4),679 (B2),637 (J5),679 (A2),678 (H2),638 (B6),637 (J4),637 (H3)
4
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.04 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.13 18MTH$500.00$500.00 $9,000.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.01 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.45 1LS$25,000.00$30,000.00 $30,000.00 $29,750.00$30,000.00
001.06.013PARTNERING (ALLOWANCE OF $10,000) 0.30 20000AL$1.00$1.00 $20,000.00 $1.00$1.00
001.07.005PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) 0.04 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.07.007IMPLEMENTATION OF THE SWPPP 1.53 1LS$20,000.00$101,850.00 $101,850.00 $59,212.50$54,000.00
001.08.005OFFICE FACILITIES 1.12 20MTH$5,000.00$3,735.00 $74,700.00 $4,496.25$3,867.50
001.09.003MOBILIZATION 8.02 1LS$800,000.00$535,000.00 $535,000.00 $728,250.00$749,000.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.83 180CY$350.00$308.00 $55,440.00 $339.50$354.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.04 8CY$480.00$338.00 $2,704.00 $574.50$480.00
300.02.003UNCLASSIFIED EXCAVATION 13.54 12908CY$120.00$70.00 $903,560.00 $81.25$77.50
300.05.002IMPORTED BORROW 0.06 23CY$130.00$171.00 $3,933.00 $235.25$222.50
301.02.005CRUSHED MISCELLANEOUS BASE 6.38 9190CY$125.00$46.35 $425,956.50 $63.34$55.18
302.01.007COLD MILL AC PAVEMENT (> 1-1/2 - 3") 4.23 830414SF$0.50$0.34 $282,340.76 $0.47$0.46
302.05.013AC PAVEMENT 8.73 4553TON$145.00$127.95 $582,556.35 $148.24$132.50
302.05.014AC PAVEMENT(PATCH BACK) 0.82 192TON$120.00$285.00 $54,720.00 $328.75$315.00
302.05.015AC PAVEMENT(MEDIANS) 1.80 523TON$180.00$230.00 $120,290.00 $271.75$249.00
302.05.017AC PAVEMENT(INVERTED SHOULDERS) 0.02 2TON$360.00$685.00 $1,370.00 $579.50$542.50
302.05.019AC PAVEMENT(LEVELING COURSE) 2.98 1284TON$140.00$154.75 $198,699.00 $255.44$183.50
302.05.023RECONSTRUCT MANHOLE 0.96 32EA$4,000.00$2,000.00 $64,000.00 $3,162.50$3,075.00
302.05.024ADJUST MANHOLE 0.06 5EA$3,000.00$862.00 $4,310.00 $1,584.25$1,487.50
302.05.025DOUBLE ADJUST MANHOLE 0.45 26EA$3,500.00$1,150.00 $29,900.00 $2,056.25$1,787.50
302.06.003PCC PAVEMENT 0.28 25CY$500.00$738.00 $18,450.00 $997.00$825.00
302.10.003ASPHALT RUBBER AND AGGREGATE MEMBRANE 3.71 22227SY$9.00$11.15 $247,831.05 $14.29$13.08
302.13.003PMAC PAVEMENT 23.50 11108TON$145.00$141.15 $1,567,894.20 $151.04$144.58
302.13.005PMAC PAVEMENT (TEST STRIP) 1.03 500TON$160.00$138.00 $69,000.00 $235.75$158.00
303.05.009PCC CURB & GUTTER, TYPE A2-6 0.41 756LF$60.00$36.15 $27,329.40 $60.54$58.00
303.05.016PCC CURB & GUTTER, TYPE A3-8 1.08 1529LF$65.00$47.15 $72,092.35 $63.29$58.00
303.05.043PCC WALK, 4" THICK 0.51 3824SF$10.00$8.90 $34,033.60 $13.23$14.50
303.05.050PCC CURB RAMPS 0.60 44CY$1,400.00$913.10 $40,176.40 $1,978.28$2,000.00
303.05.059DETECTABLE WARNING SURFACE 0.02 36SF$80.00$46.00 $1,656.00 $99.75$101.50
303.05.061CROSS GUTTER 0.18 21CY$1,000.00$572.05 $12,013.05 $958.01$830.00
304.02.007METAL HAND RAILINGS PER STD PLAN 606 0.36 93LF$350.00$255.00 $23,715.00 $448.29$484.08
307.02.0031" CONDUIT (SCH 80 PVC) 0.15 110LF$100.00$93.00 $10,230.00 $83.28$91.50
307.02.0112" CONDUIT (SCH 80 PVC) 0.16 145LF$120.00$73.00 $10,585.00 $85.75$76.50
307.02.0213" CONDUIT (SCH 80 PVC) 0.51 465LF$150.00$73.00 $33,945.00 $96.75$83.49
307.02.0312-PAIR DETECTOR LEAD-IN CABLE 0.28 9310LF$4.00$2.00 $18,620.00 $2.82$2.20
307.02.0393-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) 0.22 5752LF$7.00$2.50 $14,380.00 $3.61$3.52
307.02.03912-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) 0.32 5315LF$10.00$4.05 $21,525.75 $5.40$5.35
307.02.0395-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) 0.04 780LF$9.00$3.00 $2,340.00 $4.90$4.50
307.02.049INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT 2.61 10870LF$25.00$16.00 $173,920.00 $16.75$15.50
307.02.118REMOVE PULL BOX AND RESURFACE SIDEWALK 0.18 23EA$1,500.00$517.00 $11,891.00 $559.76$508.50
307.02.122REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) 0.06 4EA$2,500.00$1,035.00 $4,140.00 $1,635.25$1,517.50
307.02.122REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.) 0.01 4EA$750.00$207.00 $828.00 $624.39$403.50
307.02.122REMOVE TYPE 16 STANDARD (COMPLETE) (EXCL. FOUND.) 0.02 2EA$2,500.00$826.00 $1,652.00 $1,916.95$1,413.00
307.02.132REMOVE VEHICLE HEAD (COMPLETE) 0.01 6EA$300.00$73.00 $438.00 $236.70$111.50
307.02.134REMOVE PEDESTRIAN HEAD (COMPLETE) 0.01 4EA$300.00$155.00 $620.00 $290.64$227.50
307.02.138REMOVE PEDESTRIAN PUSH BUTTON 0 4EA$200.00$78.00 $312.00 $202.64$89.00
307.02.154REMOVE PPB FOUNDATION 0.01 2EA$750.00$415.00 $830.00 $1,225.20$607.50
307.02.156REMOVE TYPE 16 FOUNDATION 0.03 2EA$1,550.00$1,135.00 $2,270.00 $1,880.20$1,567.50
307.02.156REMOVE TYPE 17 FOUNDATION 0.07 4EA$1,550.00$1,250.00 $5,000.00 $1,724.25$1,725.00
307.04.229RELOCATE EV PREEMPTION MODULE 0.27 4EA$2,500.00$4,500.00 $18,000.00 $3,216.45$3,582.90
307.04.501TYPE 26 STANDARD 1.24 4EA$15,000.00$20,656.00 $82,624.00 $20,401.53$20,325.50
307.04.501TYPE 15 STANDARD 0.17 2EA$10,000.00$5,700.00 $11,400.00 $6,544.40$5,850.00
307.04.501TYPE 1 STANDARD 0.06 2EA$3,000.00$2,120.00 $4,240.00 $2,810.48$2,310.00
307.04.503TYPE 15 STANDARD FOUNDATION 0.06 2EA$3,500.00$1,965.00 $3,930.00 $3,351.85$2,732.50
307.04.503TYPE 1 STANDARD FOUNDATION 0.04 2EA$2,300.00$1,240.00 $2,480.00 $3,079.05$3,058.10
307.04.503TYPE 26 STANDARD FOUNDATION 0.25 4EA$5,500.00$4,130.00 $16,520.00 $5,149.48$4,065.00
307.04.50445' SIGNAL MAST ARM 0.21 2EA$7,500.00$7,000.00 $14,000.00 $8,577.55$7,500.00
307.04.50440' SIGNAL MAST ARM 0.18 2EA$7,000.00$5,935.00 $11,870.00 $7,459.85$6,467.50
307.04.51012' LUMINAIRE MAST ARM 0.09 6EA$3,000.00$990.00 $5,940.00 $1,650.05$995.00
307.04.516PEDESTRIAN PUSH BUTTON 0.08 8EA$750.00$695.00 $5,560.00 $624.63$682.50
307.04.518PEDESTRIAN PUSH BUTTON PLATE 0.01 8EA$200.00$52.00 $416.00 $195.08$51.00
307.04.519PEDESTRIAN PUSH BUTTON POST 0.03 2EA$2,500.00$1,018.00 $2,036.00 $1,713.25$1,009.00
307.04.521PEDESTRIAN PUSH BUTTON POST FOUNDATION 0.03 2EA$7,500.00$930.00 $1,860.00 $1,994.20$1,465.00
307.04.527DOUBLE FACE RETROREFLECTIVE STREET NAME SIGN 0.11 4EA$1,800.00$1,770.00 $7,080.00 $1,727.73$1,741.00
307.04.5323-12" LED VEHICLE HEAD (COMPLETE) 1.03 33EA$2,500.00$2,090.00 $68,970.00 $2,110.61$2,057.50
307.04.803SALVAGE EQUIPMENT 0.06 1LS$10,000.00$4,135.00 $4,135.00 $3,352.70$3,887.90
310.05.007DETAIL 32 (THERMOPLASTIC) 0.12 3150LF$5.00$2.50 $7,875.00 $3.38$3.25
310.05.007DETAIL 29 (THERMOPLASTIC) 0.05 1074LF$5.00$3.35 $3,597.90 $3.78$4.05
310.05.007DETAIL 22 (THERMOPLASTIC) 0.03 840LF$6.00$2.05 $1,722.00 $2.68$2.35
310.05.007DETAIL 21 (THERMOPLASTIC) 0 39LF$6.00$1.80 $70.20 $2.11$2.08
310.05.007DETAIL 40 (THERMOPLASTIC) 0 98LF$2.50$1.25 $122.50 $3.06$2.00
310.05.007DETAIL 25 (THERMOPLASTIC) 0.02 1265LF$2.50$1.20 $1,518.00 $1.65$1.70
310.05.007DETAIL 27 (THERMOPLASTIC) 0.02 847LF$4.00$1.80 $1,524.60 $2.30$2.19
310.05.007DETAIL 26 (THERMOPLASTIC) 0.06 13500LF$2.00$0.30 $4,050.00 $0.50$0.35
310.05.007DETAIL 38 (THERMOPLASTIC) 0.08 2944LF$4.00$1.70 $5,004.80 $2.20$2.05
310.05.007DETAIL 9 (THERMOPLASTIC) 0.57 47323LF$2.50$0.80 $37,858.40 $0.91$0.90
310.05.022DETAIL 37B (THERMOPLASTIC) 0.01 450LF$2.00$1.00 $450.00 $1.95$2.15
310.05.034PAVEMENT MARKINGS (THERMOPLASTIC) 0.17 1887SF$12.00$5.90 $11,133.30 $8.98$8.00
310.05.04012" STRIPING (THERMOPLASTIC) 0.10 1353LF$6.00$4.70 $6,359.10 $4.08$4.35
310.05.04024" STRIPING (THERMOPLASTIC) 0.35 3280LF$10.00$7.10 $23,288.00 $7.58$7.55
310.05.0408" STRIPING (THERMOPLASTIC) 0.03 421LF$4.00$4.20 $1,768.20 $2.40$1.95
310.05.043CURB MARKINGS (ONE-COAT PAINT) 0.01 235LF$10.00$3.00 $705.00 $3.88$3.00
310.05.131REMOVE STRIPING AND MARKINGS (THERMOPLASTIC) 0.04 598SF$10.00$4.60 $2,750.80 $8.15$7.30
315.06.003SIGN PANEL 0.19 58EA$400.00$224.00 $12,992.00 $288.00$207.00
315.06.025REMOVE SIGN 0 3EA$150.00$85.00 $255.00 $92.25$90.00
601.09.011TRAFFIC CONTROL 2.25 1LS$500,000.00$150,000.00 $150,000.00 $1,002,705.75$1,235,500.00
 RECONFIGURE VIDEO DETECTION ZONE - 2 CAMERA 0.06 2EA$3,000.00$2,065.00 $4,130.00 $2,414.50$2,079.00
 VIDEO DETECTION CAMERA UNIT 1.02 2EA$1,500.00$34,000.00 $68,000.00 $31,675.00$33,350.00
 REMOVE PEDESTRIAN PUSH BUTTON PLATE 0 4EA$100.00$11.00 $44.00 $148.56$30.50
 REMOVE PEDESTRIAN PUSH BUTTON POST (COMPLETE)(EXCL. FOUND.) 0 2EA$500.00$104.00 $208.00 $684.00$177.00
 REMOVE TYPE 1 STANDARD FOUNDATION 0.05 4EA$650.00$826.00 $3,304.00 $1,251.32$1,163.00
 SCE WORK (ALLOWANCE OF $10,000) 0.30 20000AL$1.00$1.00 $20,000.00 $1.00$1.00
 SIGN POST (ROADSIDE SIGN) 0.05 16EA$400.00$200.00 $3,200.00 $2,670.00$240.00
 8' STRAIGHT ARM CLAMP-ON FOR STREET NAME SIGN 0.12 4EA$1,750.00$2,000.00 $8,000.00 $2,730.25$2,000.00
 ACCESSIBLE PEDESTRIAN SIGNAL (APS) PUSH BUTTON COMPLETE 0.10 4EA$2,000.00$1,745.00 $6,980.00 $1,656.38$1,717.00
 ADJUST PULLBOX 0.06 10EA$1,200.00$415.00 $4,150.00 $468.48$436.96
 ACCESSIBLE PEDESTRIAN SYSTEM (APS) CONTROL UNIT 0.09 1EA$6,500.00$5,850.00 $5,850.00 $6,871.30$5,925.00
 COMPOSITE TYPE 3 PULL BOX INCL COVER 0.40 19EA$2,200.00$1,390.00 $26,410.00 $1,342.42$1,345.00
 COMPOSITE TYPE 2 PULL BOX INCL COVER 0.09 5EA$2,000.00$1,250.00 $6,250.00 $1,100.80$1,225.00
 IMPLEMENTATION OF THE COUNTY WORKFORCE AGREEMENT 0.04 1LS$50,000.00$2,615.00 $2,615.00 $13,403.75$10,500.00
 LED LUMINAIRE (400W HPS EQUIVALENT) 0.06 4EA$2,000.00$1,000.00 $4,000.00 $1,376.10$979.50
 LED LUMINAIRE (200W HPS EQUIVALENT) 0.02 2EA$1,200.00$805.00 $1,610.00 $1,442.20$793.50
 LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) 0.20 8EA$1,800.00$1,635.00 $13,080.00 $1,660.68$1,635.00
 LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) 0.10 4EA$1,000.00$1,700.00 $6,800.00 $1,660.68$1,635.00
 UNION PACIFIC RAILROAD PERMIT (ALLOWANCE OF $1,025) 0.03 2050AL$1.00$1.00 $2,050.00 $1.00$1.00
 WIRE #10 0.23 7660LF$2.00$2.00 $15,320.00 $2.73$2.49
 RECONFIGURE VIDEO DETECTION ZONES 0.03 3EA$1,500.00$725.00 $2,175.00 $706.25$712.50
 Total Percent100   Total Amount$6,672,329.21