Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.05
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
2.56
| 1 | LS | $50,000.00 | $50,000.00 |
$50,000.00
| $44,371.43 | $45,000.00 |
001.08.005 | OFFICE FACILITIES |
0.92
| 6 | MTH | $2,500.00 | $3,000.00 |
$18,000.00
| $2,654.57 | $2,962.00 |
001.09.003 | MOBILIZATION |
5.12
| 1 | LS | $90,000.00 | $100,000.00 |
$100,000.00
| $144,979.57 | $150,000.00 |
300.01.003 | CLEARING AND GRUBBING |
1.28
| 1 | LS | $15,000.00 | $25,000.00 |
$25,000.00
| $33,553.43 | $27,174.00 |
300.01.067 | CONCRETE REMOVAL (REINFORCED) |
0.10
| 2 | CY | $2,600.00 | $1,000.00 |
$2,000.00
| $2,922.14 | $2,000.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
5.12
| 2500 | CY | $40.00 | $40.00 |
$100,000.00
| $55.14 | $40.00 |
300.03.003 | UNCLASSIFIED FILL |
1.53
| 600 | CY | $20.00 | $50.00 |
$30,000.00
| $44.00 | $50.00 |
300.10.003 | STABILIZATION GEOTEXTILE |
0.52
| 410 | SY | $25.00 | $25.00 |
$10,250.00
| $33.16 | $20.00 |
300.12.003 | 1" CRUSHED ROCK |
0.48
| 62 | CY | $60.00 | $150.00 |
$9,300.00
| $127.43 | $150.00 |
301.02.003 | CRUSHED AGGREGATE BASE |
0.69
| 135 | CY | $150.00 | $100.00 |
$13,500.00
| $111.57 | $120.00 |
302.06.003 | PCC PAVEMENT |
3.07
| 120 | CY | $500.00 | $500.00 |
$60,000.00
| $598.71 | $500.00 |
304.02.007 | METAL HAND RAILINGS PER STD PLAN 606 |
2.18
| 213 | LF | $200.00 | $200.00 |
$42,600.00
| $188.00 | $200.00 |
| CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) |
0.15
| 6 | MTH | $500.00 | $500.00 |
$3,000.00
| $500.00 | $500.00 |
| CONTROL PANELS |
1.28
| 1 | LS | $116,600.00 | $25,000.00 |
$25,000.00
| $39,368.86 | $39,082.00 |
| DAVIT HOIST |
0.51
| 1 | LS | $10,000.00 | $10,000.00 |
$10,000.00
| $15,768.29 | $10,000.00 |
| ELECTRIC MOTOR OPERATORS AND APPURTENANCES |
1.28
| 1 | LS | $50,000.00 | $25,000.00 |
$25,000.00
| $31,857.29 | $28,669.00 |
| DRILL AND GROUT DOWEL OR ANCHOR |
1.18
| 154 | LF | $70.00 | $150.00 |
$23,100.00
| $160.43 | $150.00 |
| DRILL AND BOND ANCHOR (EPOXY CARTRIDGE) |
0.35
| 45 | LF | $125.00 | $150.00 |
$6,750.00
| $224.57 | $142.00 |
| DISPOSAL OF LEAD CONTAINING WASTE/DEBRIS |
0.77
| 1 | LS | $1,500.00 | $15,000.00 |
$15,000.00
| $14,366.00 | $10,782.00 |
| EXISTING TRASH RACK REHABILITATION |
1.28
| 1 | LS | $27,000.00 | $25,000.00 |
$25,000.00
| $29,664.43 | $25,000.00 |
| EXPANDED METAL ENCLOSURE |
2.56
| 1 | LS | $46,000.00 | $50,000.00 |
$50,000.00
| $64,562.14 | $50,000.00 |
| ENVIRONMENTALLY SENSITIVE AREA (ESA) FENCING |
0.22
| 215 | LF | $3.80 | $20.00 |
$4,300.00
| $55.14 | $12.00 |
| ELECTRICAL WORK |
12.79
| 1 | LS | $252,810.00 | $250,000.00 |
$250,000.00
| $214,747.86 | $248,500.00 |
| GEOGRID |
0.90
| 500 | SY | $20.00 | $35.00 |
$17,500.00
| $32.17 | $15.00 |
| 2-1/2" TO 5" ROCK |
4.22
| 550 | CY | $100.00 | $150.00 |
$82,500.00
| $131.57 | $150.00 |
| IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
0.26
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $27,183.14 | $26,642.00 |
| IMPLEMENTATION OF THE SURFACE WATER DIVERSION AND DEWATERING PLAN |
7.67
| 1 | LS | $100,000.00 | $150,000.00 |
$150,000.00
| $126,022.71 | $135,380.00 |
| IMPLEMENTATION OF THE SITE SPECIFIC HEALTH AND SAFETY PLAN |
0.77
| 1 | LS | $5,000.00 | $15,000.00 |
$15,000.00
| $22,196.29 | $14,274.00 |
| INCLINED TRASH RACK |
2.05
| 1 | LS | $35,000.00 | $40,000.00 |
$40,000.00
| $41,527.86 | $40,000.00 |
| LOW FLOW DISCHARGE VALVES AND PIPING SYSTEM |
2.56
| 1 | LS | $50,000.00 | $50,000.00 |
$50,000.00
| $85,279.43 | $80,000.00 |
| MISCELLANEOUS MECHANICAL WORK |
2.05
| 1 | LS | $46,600.00 | $40,000.00 |
$40,000.00
| $69,220.57 | $43,824.00 |
| OUTLET TUNNEL REPAIR |
2.56
| 1 | LS | $50,000.00 | $50,000.00 |
$50,000.00
| $76,186.43 | $55,895.00 |
| PREPARATION OF THE SURFACE WATER DIVERSION AND DEWATERING PLAN (STIPULATED UNIT PRICE OF $5,000) |
0.26
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
| PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.13
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| PREPARATION OF THE SITE SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.13
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| REINFORCED CONCRETE RISER |
5.12
| 1 | LS | $60,000.00 | $100,000.00 |
$100,000.00
| $97,546.00 | $100,000.00 |
| REINFORCED CONCRETE ACCESS ROAD |
0.77
| 30 | CY | $1,000.00 | $500.00 |
$15,000.00
| $862.14 | $750.00 |
| REMOVE AND REPLACE CHAIN LINK FENCE 5' HIGH WITH BARBED WIRE |
0.10
| 20 | LF | $150.00 | $100.00 |
$2,000.00
| $169.29 | $170.00 |
| REMOVE EXISTING IMPROVEMENTS |
1.79
| 1 | LS | $51,000.00 | $35,000.00 |
$35,000.00
| $88,563.29 | $75,000.00 |
| SECURITY GATE AND FENCE |
0.97
| 1 | LS | $20,000.00 | $19,000.00 |
$19,000.00
| $28,892.57 | $25,000.00 |
| SECURITY CAMERA |
0.15
| 1 | LS | $2,000.00 | $3,000.00 |
$3,000.00
| $4,622.00 | $3,000.00 |
| SLIPLINE 10" STEEL PIPE WITH 8" STAINLESS STEEL PIPE INCLUDING ANNULAR SPACE GROUTING AND APPURTENANT WORK |
2.15
| 60 | LF | $500.00 | $700.00 |
$42,000.00
| $759.71 | $683.00 |
| STILLING WELL |
2.56
| 1 | LS | $27,000.00 | $50,000.00 |
$50,000.00
| $84,667.57 | $60,000.00 |
| STAINLESS STEEL STEPS PER STD PLAN 635 |
1.33
| 52 | EA | $500.00 | $500.00 |
$26,000.00
| $561.43 | $500.00 |
| THROTTLING KNIFE GATE VALVE |
2.56
| 1 | LS | $51,300.00 | $50,000.00 |
$50,000.00
| $51,783.86 | $40,000.00 |
| 10-INCH DIAMETER STAINLESS STEEL PIPE |
0.26
| 10 | LF | $300.00 | $500.00 |
$5,000.00
| $773.00 | $660.00 |
| CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $3000) |
0.15
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
| 6" DIAMETER PVC PIPE, SCHEDULE 80 |
0.05
| 10 | LF | $60.00 | $100.00 |
$1,000.00
| $159.61 | $100.00 |
| 6" DIAMETER PERFORATED PVC PIPE, SCHEDULE 80 |
0.26
| 50 | LF | $60.00 | $100.00 |
$5,000.00
| $101.07 | $100.00 |
| CLEAN AND PAINT EXISTING STEEL |
1.53
| 1 | LS | $25,000.00 | $30,000.00 |
$30,000.00
| $39,511.14 | $33,138.00 |
| CAST IRON SLIDE GATE REHABILITATION |
4.09
| 1 | LS | $50,000.00 | $80,000.00 |
$80,000.00
| $85,305.86 | $78,921.00 |
| CHAIN GATE |
0.26
| 1 | LS | $500.00 | $5,000.00 |
$5,000.00
| $4,935.29 | $2,747.00 |
| ACCESS PLATFORMS AND STAIRS |
6.39
| 1 | LS | $115,000.00 | $125,000.00 |
$125,000.00
| $186,320.14 | $150,000.00 |
| Total Percent | 100 | | | | Total Amount | $1,954,800.00 | | |