Bid Price History

Sierra Madre Dam Slope Protection And Basin Access Road Improvement Project
$4,071,119.00
05/19/2020
537 (B7)
10
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) 0.05 1LS$2,000.00$2,000.00 $2,000.00 $2,000.00$2,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.11 9MTH$500.00$500.00 $4,500.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.02 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.61 1LS$5,000.00$25,000.00 $25,000.00 $26,213.50$21,875.00
001.07.004PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) 0.12 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.07.007IMPLEMENTATION OF THE SWPPP 0.86 1LS$40,000.00$35,000.00 $35,000.00 $82,873.80$83,044.00
001.07.025IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 0.61 1LS$10,000.00$25,000.00 $25,000.00 $27,019.30$17,500.00
001.08.005OFFICE FACILITIES 0.55 9MTH$6,350.00$2,500.00 $22,500.00 $3,692.26$3,018.50
001.09.003MOBILIZATION 7.37 1LS$365,000.00$300,000.00 $300,000.00 $393,892.60$369,442.50
300.01.003CLEARING AND GRUBBING 6.14 1LS$20,600.00$250,000.00 $250,000.00 $86,916.10$37,765.00
300.01.005ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) 0.04 7EA$600.00$250.00 $1,750.00 $1,239.70$782.50
300.01.022CROWN REDUCTION, TREE (13" - 24" DIAMETER) 0.01 3EA$1,480.00$100.00 $300.00 $1,993.85$975.00
300.01.057REMOVE EXISTING CHAIN LINK FENCE 0.09 374LF$17.00$10.00 $3,740.00 $25.98$17.88
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.02 20CY$250.00$50.00 $1,000.00 $397.05$397.50
300.02.003UNCLASSIFIED EXCAVATION 0.59 481CY$160.00$50.00 $24,050.00 $518.40$131.50
300.04.007STRUCTURE EXCAVATION (BRIDGE) 0.63 257CY$125.00$100.00 $25,700.00 $212.80$123.00
300.04.027STRUCTURE BACKFILL (BRIDGE) 0.18 150CY$115.00$50.00 $7,500.00 $259.10$192.50
301.03.005TRENCH BACKFILL SLURRY (CLASS 270-E-500) 0.62 127CY$340.00$200.00 $25,400.00 $273.38$280.00
302.05.014AC PAVEMENT(PATCH BACK) 0.12 2TON$500.00$2,500.00 $5,000.00 $1,568.80$1,000.00
302.06.003PCC PAVEMENT 11.79 480CY$250.00$1,000.00 $480,000.00 $571.10$512.50
303.01.006STRUCTURE CONCRETE (BRIDGE) 13.88 452CY$1,450.00$1,250.00 $565,000.00 $1,225.50$1,320.00
303.01.042BAR REINFORCING STEEL (BRIDGE) 4.27 139000LB$1.60$1.25 $173,750.00 $1.73$1.50
303.01.053JOINT SEAL, TYPE B 0.24 64LF$505.00$150.00 $9,600.00 $94.30$92.50
303.01.315CATCH BASIN PER STD PLAN 304, 2 GRATES 0.12 1EA$10,700.00$5,000.00 $5,000.00 $11,942.90$8,250.00
303.01.603REINFORCED CONCRETE STAIRWAY PER STD PLAN 640 0.11 3CY$2,700.00$1,500.00 $4,500.00 $4,263.30$3,275.00
303.05.005PCC CURB, TYPE A1-VAR 0.01 12LF$100.00$50.00 $600.00 $215.45$180.00
303.05.013PCC CURB & GUTTER, TYPE A2-1 0.03 26LF$100.00$50.00 $1,300.00 $157.35$100.00
304.02.007METAL HAND RAILINGS PER STD PLAN 606 0.11 37LF$130.00$122.00 $4,514.00 $242.28$207.00
304.03.003CHAIN LINK FENCE, 4' HIGH 0.07 45LF$60.00$62.00 $2,790.00 $82.07$62.50
304.03.003CHAIN LINK FENCE, 8' HIGH 0.07 30LF$165.00$88.50 $2,655.00 $114.23$95.40
305.01.00524" DIA CIDH PILES 0.80 108LF$420.00$300.00 $32,400.00 $575.27$499.50
305.01.00536" DIA CIDH PILES 4.66 422LF$535.00$450.00 $189,900.00 $729.97$612.50
306.01.13112" RCP, 2000 D 0.22 18LF$209.00$500.00 $9,000.00 $477.25$475.00
306.01.141IMPORTED TRENCH BACKFILL 0.02 7CY$60.00$100.00 $700.00 $1,480.10$145.00
900.05.015DISPOSAL OF CONTAMINATED SOIL, CLASS I LANDFILL 0.17 45TON$220.00$150.00 $6,750.00 $306.50$275.00
 ROCKFALL PROTECTION BARRIER SYSTEM 5.77 1LS$414,900.00$235,000.00 $235,000.00 $263,999.20$275,000.00
 RESIDENTIAL STREET REPAIR (ALLOWANCE OF $100,000) 2.46 100000AL$1.00$1.00 $100,000.00 $1.00$1.00
 ROCK DOWEL (INCL NON-SHRINK GROUT) 3.41 222EA$410.00$625.00 $138,750.00 $802.36$700.00
 STRUCTURE CONCRETE (ROCKFALL PROTECTION) 0.88 18CY$1,270.00$2,000.00 $36,000.00 $1,774.20$1,693.50
 SILT FENCE (SLOPE PROTECTION) 0.49 1LS$5,000.00$20,000.00 $20,000.00 $14,046.90$13,500.00
 TOILET AND ACCESSORIES 0.06 1LS$10,800.00$2,500.00 $2,500.00 $8,555.40$5,314.50
 TEMPORARY FALSEWORK 0.86 1LS$145,200.00$35,000.00 $35,000.00 $286,008.30$192,500.00
 STRUCTURE EXCAVATION (ROCKFALL PROTECTION) 0.26 8CY$340.00$1,300.00 $10,400.00 $3,803.40$3,817.00
 TREAT BRIDGE DECK 0.79 6400SF$15.00$5.00 $32,000.00 $4.40$4.50
 WEEP DRAIN 5.86 129EA$1,300.00$1,850.00 $238,650.00 $1,814.80$1,925.00
 WALL MOUNTED SINK AND ACCESSORIES 0.61 1LS$800.00$25,000.00 $25,000.00 $10,029.10$5,000.00
 2" COPPER PIPE, TYPE K 0.46 250LF$90.00$75.00 $18,750.00 $114.35$91.50
 750-GALLON SEWAGE HOLDING TANK AND APPURTENANCES 0.25 1LS$30,200.00$10,000.00 $10,000.00 $28,051.60$13,217.50
 4 X 4 X W2.0 X W2.0 WELDED WIRE MESH 1.15 261SY$18.00$180.00 $46,980.00 $153.50$187.50
 ANCHOR INSTALLATION 3.21 1305LF$126.00$100.00 $130,500.00 $178.90$172.50
 ANCHOR RE-DRILL & RE-TEST (WATER TIGHTNESS) 1.32 1050LF$65.00$51.00 $53,550.00 $71.07$63.50
 ANCHOR TESTING 0.74 30EA$343.00$1,000.00 $30,000.00 $824.70$695.00
 AIR-PLACED CONCRETE, 6" 4.01 261SY$908.00$625.00 $163,125.00 $603.40$637.50
 AIR-PLACED CONCRETE, 3" 0.43 28SY$770.00$625.00 $17,500.00 $719.80$693.00
 CABLE RAILING (CALTRANS STD PLAN B11-47) (MODIFIED) 0.63 400LF$40.00$63.80 $25,520.00 $97.16$77.89
 BRIDGE DECK TREATMENT MATERIAL 0.29 80GAL$135.00$150.00 $12,000.00 $158.95$150.00
 BAR REINFORCING STEEL (ROCKFALL PROTECTION) 0.41 4806LB$2.00$3.50 $16,821.00 $5.10$5.25
 CITY OF SIERRA MADRE PERMIT FEES (ALLOWANCE OF $10,000) 0.25 10000AL$1.00$1.00 $10,000.00 $1.00$1.00
 ELASTOMERIC BEARING PAD 0.99 202EA$600.00$200.00 $40,400.00 $300.50$212.50
 EXCLUSIONARY FENCING 0.25 50LF$20.00$200.00 $10,000.00 $135.70$102.50
 ELECTRICAL WORK 1.23 1LS$15,040.00$50,000.00 $50,000.00 $37,135.20$31,500.00
 GROUT FOR ANCHOR RE-TESTING (WATER TIGHTNESS) 0.43 4CY$5,500.00$4,400.00 $17,600.00 $2,666.76$587.50
 GALVANIZED STEEL PICKET WALK GATE, 8' HIGH 0.12 5LF$700.00$953.00 $4,765.00 $933.25$959.00
 GALVANIZED STEEL PICKET DOUBLE SWING GATE, 8' HIGH 0.43 35LF$150.00$501.40 $17,549.00 $646.99$631.50
 GALVANIZED STEEL PICKET FENCE, 8' HIGH 1.41 225LF$230.00$254.80 $57,330.00 $258.18$272.50
 MECHANICAL WORK 2.46 1LS$10,000.00$100,000.00 $100,000.00 $46,290.60$37,900.00
 PCC FOOTING FOR REINFORCED CONCRETE STAIRWAY 0.11 3CY$1,000.00$1,500.00 $4,500.00 $2,613.40$1,675.00
 PREPARE CONCRETE DECK SURFACE 0.79 6400SF$2.00$5.00 $32,000.00 $3.34$2.75
 PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $2,500) 0.06 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PREPARATION OF THE CONTAMINATED SOIL MANAGEMENT PLAN (STIPULATED UNIT PRICE OF $2,500) 0.06 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PIPE GATE PER STD PLAN 602, W=16' 0.25 1EA$5,200.00$10,340.00 $10,340.00 $11,964.37$10,555.83
 REINFORCED CONCRETE WALL FOR STAIRWAY, 8" THICK 0.12 48SF$120.00$100.00 $4,800.00 $231.75$115.00
 REINFORCED CONCRETE CUTOFF WALL, 8" THICK 0.12 19LF$100.00$250.00 $4,750.00 $507.42$397.50
 REMOVE EXISTING 4" PVC PIPE AND CATCH BASIN 0.02 1LS$3,000.00$1,000.00 $1,000.00 $6,261.30$3,625.00
 REMOVE GROUTED RIPRAP 0 4CY$1,000.00$50.00 $200.00 $859.10$687.50
 REMOVE EXISTING RAIL & TIMBER FENCE 0.12 1LS$10,000.00$5,000.00 $5,000.00 $8,910.20$6,709.00
 REMOVE EXISTING SECURITY GATE ASSEMBLY 0.01 1EA$1,000.00$500.00 $500.00 $2,146.80$1,550.00
 REMOVE EXISTING METAL PIPE 0.07 304LF$100.00$10.00 $3,040.00 $609.90$25.50
 REMOVE EXISTING PIPE GATE 0.01 1EA$4,000.00$400.00 $400.00 $3,245.15$1,037.50
 REMOVE TELECOMMUNICATIONS POLE 0.02 1EA$1,000.00$1,000.00 $1,000.00 $3,430.55$1,750.00
 ROCK BLOCK REMOVAL 0.98 1LS$37,400.00$40,000.00 $40,000.00 $51,400.70$53,000.00
 Total Percent100   Total Amount$4,071,119.00