Bid Price History

Overhill Drive - La Brea Avenue to Slauson Avenue
$1,166,124.30
02/27/2018
673 (C4),673 (C6),673 (C5)
6
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) 0.17 1LS$2,000.00$2,000.00 $2,000.00 $2,000.00$2,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.13 3MTH$500.00$500.00 $1,500.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.09 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.07.003IMPLEMENTATION OF BMPS 0.69 1LS$10,000.00$8,000.00 $8,000.00 $12,502.00$12,500.00
001.08.003OFFICE FACILITIES 1.03 1LS$12,000.00$12,000.00 $12,000.00 $14,090.00$11,000.00
001.09.003MOBILIZATION 5.15 1LS$37,000.00$60,000.00 $60,000.00 $110,899.77$97,500.00
300.01.003CLEARING AND GRUBBING 3 1LS$20,000.00$35,000.00 $35,000.00 $90,421.67$83,765.00
300.01.005ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) 0.21 1EA$500.00$2,500.00 $2,500.00 $1,204.17$937.50
300.01.057REMOVE EXISTING CHAIN LINK FENCE 0.23 88LF$45.00$30.00 $2,640.00 $23.33$20.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.86 67CY$250.00$150.00 $10,050.00 $188.17$164.50
300.01.067CONCRETE REMOVAL (REINFORCED) 0.19 5CY$500.00$450.00 $2,250.00 $440.83$365.00
300.02.003UNCLASSIFIED EXCAVATION 7.94 1544CY$100.00$60.00 $92,640.00 $86.17$89.50
300.04.013STRUCTURE EXCAVATION (RETAINING WALL) 0.81 86CY$150.00$110.00 $9,460.00 $326.83$120.00
300.04.033STRUCTURE BACKFILL (RETAINING WALL) 0.39 36CY$160.00$125.00 $4,500.00 $208.83$170.00
300.10.003STABILIZATION GEOTEXTILE 0.17 500SY$12.00$4.00 $2,000.00 $8.83$5.50
301.02.005CRUSHED MISCELLANEOUS BASE 3.67 428CY$130.00$100.00 $42,800.00 $109.33$107.50
301.03.005TRENCH BACKFILL SLURRY (CLASS 270-E-500) 1.14 124CY$220.00$107.00 $13,268.00 $151.33$138.00
302.05.007AC CURB, TYPE D1-6 0.84 1631LF$15.00$6.00 $9,786.00 $14.33$9.50
302.05.009AC CURB, TYPE D1-VAR 0.01 8LF$15.00$12.00 $96.00 $16.83$10.50
302.05.016AC PAVEMENT(DRIVEWAYS) 0.45 13TON$200.00$400.00 $5,200.00 $168.33$120.00
302.05.017AC PAVEMENT(INVERTED SHOULDERS) 0.20 4TON$200.00$580.00 $2,320.00 $221.67$155.00
302.05.018AC PAVEMENT(DIGOUTS) 0.28 9TON$300.00$360.00 $3,240.00 $180.83$150.00
302.06.003PCC PAVEMENT 0.09 1CY$1,500.00$1,000.00 $1,000.00 $968.50$900.00
303.01.368PARKWAY DRAIN PER STD PLAN 151, S=48", INLET TYPE 2 0.64 1EA$3,000.00$7,500.00 $7,500.00 $6,695.83$6,750.00
303.01.368PARKWAY DRAIN PER STD PLAN 151, S=24", INLET TYPE 2 0.94 2EA$2,000.00$5,500.00 $11,000.00 $4,484.17$4,750.00
303.01.608REINFORCED CONCRETE RETAINING WALL TYPE 4 7.47 26CY$2,000.00$3,350.00 $87,100.00 $2,340.00$1,995.00
303.05.005PCC CURB, TYPE A1-VAR 0.59 127LF$35.00$54.00 $6,858.00 $33.83$31.00
303.05.010PCC CURB & GUTTER, TYPE A2-8 1.10 291LF$35.00$44.00 $12,804.00 $43.00$42.00
303.05.043PCC WALK, 4" THICK 1.26 1989SF$8.00$7.40 $14,718.60 $7.19$7.20
303.05.050PCC CURB RAMPS 0.93 18CY$600.00$600.00 $10,800.00 $684.67$650.00
303.05.055PCC DRIVEWAYS, 6" THICK 0.84 1094SF$10.00$9.00 $9,846.00 $8.75$9.00
303.05.059DETECTABLE WARNING SURFACE 0.13 30SF$60.00$50.00 $1,500.00 $58.83$42.50
303.05.061CROSS GUTTER 0.09 2CY$600.00$500.00 $1,000.00 $1,150.17$850.50
304.02.007METAL HAND RAILINGS PER STD PLAN 606 2.32 271LF$120.00$100.00 $27,100.00 $77.17$66.50
304.02.013CABLE RAILING (CALTRANS STD PLAN B11-47) 0.45 66LF$70.00$80.00 $5,280.00 $61.33$51.00
307.02.0112" CONDUIT (SCH 80 PVC) 0.51 30LF$50.00$200.00 $6,000.00 $75.17$58.00
307.02.0213" CONDUIT (SCH 80 PVC) 0.51 15LF$80.00$400.00 $6,000.00 $137.50$71.50
307.02.0312-PAIR DETECTOR LEAD-IN CABLE 0.01 400LF$7.00$0.23 $92.00 $3.31$3.80
307.02.03912-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) 0.79 420LF$10.00$22.00 $9,240.00 $17.67$16.00
307.02.041NO. 3 1/2 PULL BOX INCL PCC COVER 0.56 20EA$600.00$325.00 $6,500.00 $449.50$386.00
307.02.043NO. 5 PULL BOX INCL PCC COVER 0.10 2EA$600.00$600.00 $1,200.00 $598.67$558.50
307.02.045NO. 6 PULL BOX INCL PCC COVER 0.17 3EA$700.00$650.00 $1,950.00 $724.83$669.50
307.02.049INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT 0.24 80LF$15.00$35.00 $2,800.00 $32.83$28.00
601.09.011TRAFFIC CONTROL 2.14 1LS$10,000.00$25,000.00 $25,000.00 $46,527.50$47,332.50
601.09.013TEMPORARY CRASH CUSHION ARRAY 0.26 1EA$3,000.00$3,000.00 $3,000.00 $4,066.67$3,700.00
601.09.015TEMPORARY RAILING (TYPE K) 2.10 700LF$25.00$35.00 $24,500.00 $34.67$36.00
601.09.017FLASHING ARROW SIGN 0.39 1EA$3,000.00$4,500.00 $4,500.00 $2,833.33$2,500.00
601.09.019CHANGEABLE MESSAGE SIGN 0.39 1EA$3,000.00$4,500.00 $4,500.00 $4,575.00$4,700.00
801.04.017EROSION CONTROL BLANKET 0.84 654SY$3.00$15.00 $9,810.00 $7.17$6.00
801.06.003PLANT ESTABLISHMENT PERIOD 0.77 1LS$6,000.00$9,000.00 $9,000.00 $5,621.00$4,913.00
801.06.005HYDROSEED ESTABLISHMENT 0.77 1LS$6,000.00$9,000.00 $9,000.00 $3,833.33$2,800.00
 STRUCTURE BACKFILL PER DETAIL A SHEET 4 0.20 21CY$180.00$110.00 $2,310.00 $287.50$237.50
 REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) 0.37 663LF$20.00$6.50 $4,309.50 $7.42$8.00
 SCE UNDERGROUND PRIMARY CONDUIT WITH PULL ROPE 0.60 1LS$5,000.00$7,000.00 $7,000.00 $5,016.67$4,800.00
 SCE ALLOWANCE (ALLOWANCE OF $20,000) 1.72 20000AL$1.00$1.00 $20,000.00 $1.00$1.00
 TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE 0.34 11332LB$0.20$0.35 $3,966.20 $0.29$0.25
 STRUCTURE EXCAVATION PER DETAIL A SHEET 4 0.62 60CY$120.00$120.00 $7,200.00 $162.50$130.00
 UNDERGROUND LIGHTING CONDUIT AND WIRES 4.56 2800LF$35.00$19.00 $53,200.00 $24.50$22.50
 2" AC DIKE, TYPE C PER STD PLAN RSP A87B 0.08 75LF$15.00$12.00 $900.00 $13.05$8.15
 AC PAVEMENT (PEDESTRIAN PATH) 9.61 659TON$130.00$170.00 $112,030.00 $134.17$131.50
 4" AC DIKE, TYPE F PER STD PLAN RSP A87B 0.08 75LF$20.00$12.00 $900.00 $15.05$8.15
 ADJUST GATE PER DETAIL E SHEET 5 0.19 1EA$2,000.00$2,250.00 $2,250.00 $2,996.67$2,257.50
 BAR REINFORCING STEEL PER DETAIL A SHEET 4 1.33 5750LB$3.00$2.70 $15,525.00 $2.59$2.73
 CONRETE SLOUGH WALL INCLUDING DUCTILE IRON PIPE 1.11 1LS$11,000.00$13,000.00 $13,000.00 $10,908.33$12,300.00
 CONCRETE BASE FOR PEDESTRIAN LIGHT 1.30 19EA$1,500.00$800.00 $15,200.00 $783.33$805.00
 CURB DRAIN PER STD PLAN 150, N=1 WITH PIPE DOME 1.03 2EA$600.00$6,000.00 $12,000.00 $2,116.67$1,505.00
 HANDRAIL FOUNDATION PER DETAIL A SHEET 4 1.62 35CY$400.00$540.00 $18,900.00 $649.50$676.00
 FURNISH PEDESTRIAN POLE LIGHT 11.41 19EA$4,400.00$7,000.00 $133,000.00 $7,125.20$7,167.50
 FURNISH AND PLANT 24" BOX TREE 1.86 38EA$315.00$570.00 $21,660.00 $511.67$505.00
 IN-LINE TERMINAL SYSTEM (TYPE SKT-W-MGS) 0.69 2EA$4,000.00$4,000.00 $8,000.00 $4,000.00$3,980.00
 INSTALL PEDESTRIAN POLE LIGHT 1.79 19EA$900.00$1,100.00 $20,900.00 $829.33$753.00
 MISCELLANEOUS HARDWARE PER DETAILS 8 AND 10 SHEET E1.1, IN-LINE FUSES 0.47 1LS$24,000.00$5,500.00 $5,500.00 $4,969.17$5,000.00
 MIDWEST GUARDRAIL SYSTEM (WOOD POST W/ WOOD BLOCK) 1.62 608LF$70.00$31.00 $18,848.00 $30.83$30.50
 MONUMENT UPLIGHTS 0.57 2EA$1,700.00$3,300.00 $6,600.00 $2,482.50$2,600.00
 PCC GUTTER (WALL DRAIN) 0.26 64LF$25.00$48.00 $3,072.00 $50.00$46.50
 REMOVE STREET LIGHT POLE 0.43 1EA$600.00$5,000.00 $5,000.00 $1,831.67$1,400.00
 REMOVE STREET LIGHT PULL BOX 0.13 2EA$500.00$765.00 $1,530.00 $279.17$232.50
 REMOVE STREET LIGHT FOUNDATION 0.07 1EA$600.00$800.00 $800.00 $1,022.50$1,050.00
 REMOVE AND DISPOSE OF EXISTING GUARDRAIL END TREATMENT AND CONCRETE FOOTING (INCLUDING POSTS) 0.12 25LF$30.00$55.00 $1,375.00 $33.00$21.50
 SERVICE PEDESTAL WITH FOUNDATION 0.80 1EA$10,000.00$9,300.00 $9,300.00 $12,414.17$8,842.50
 Total Percent100   Total Amount$1,166,124.30