Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) |
0.86
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.17
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
0.69
| 1 | LS | $10,000.00 | $4,000.00 |
$4,000.00
| $4,000.00 | $4,000.00 |
001.07.021 | SHORING OF OPEN EXCAVATIONS |
1.72
| 1 | LS | $10,000.00 | $10,000.00 |
$10,000.00
| $10,000.00 | $10,000.00 |
001.08.005 | OFFICE FACILITIES |
0.51
| 2 | MTH | $5,000.00 | $1,500.00 |
$3,000.00
| $1,500.00 | $1,500.00 |
001.09.003 | MOBILIZATION |
4.81
| 1 | LS | $70,000.00 | $28,000.00 |
$28,000.00
| $28,000.00 | $28,000.00 |
300.01.003 | CLEARING AND GRUBBING |
0.51
| 1 | LS | $10,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
300.01.057 | REMOVE EXISTING CHAIN LINK FENCE |
0.10
| 60 | LF | $15.00 | $10.00 |
$600.00
| $10.00 | $10.00 |
304.06.021 | MIDWEST GUARDRAIL SYSTEM (WOOD POST W/ WOOD BLOCK) |
0.67
| 31 | LF | $90.00 | $126.00 |
$3,906.00
| $126.00 | $126.00 |
304.06.043 | MIDWEST GUARDRAIL SYSTEM END ANCHOR ASSEMBLY (TYPE SFT) PER STD PLAN A77S1 |
0.24
| 1 | EA | $3,000.00 | $1,400.00 |
$1,400.00
| $1,400.00 | $1,400.00 |
306.01.115 | 16" HIGH DENSITY POLYETHYLENE PIPE |
35.12
| 787 | LF | $180.00 | $260.00 |
$204,620.00
| $260.00 | $260.00 |
306.01.203 | 16" WATERMAIN, .25" THICK STL |
8.58
| 100 | LF | $355.00 | $500.00 |
$50,000.00
| $500.00 | $500.00 |
306.01.221 | AIR RELEASE AND VACUUM VALVE ASSEMBLY, 2" |
2.57
| 2 | EA | $7,000.00 | $7,500.00 |
$15,000.00
| $7,500.00 | $7,500.00 |
306.01.225 | BUTTERFLY VALVE, 250 PSI WWP, 16" |
1.89
| 1 | EA | $7,000.00 | $11,000.00 |
$11,000.00
| $11,000.00 | $11,000.00 |
306.01.227 | GATE VALVE, 250 PSI WWP, 16" |
4.46
| 1 | EA | $7,500.00 | $26,000.00 |
$26,000.00
| $26,000.00 | $26,000.00 |
306.01.233 | FIRE HYDRANT, STD PLAN W-11 |
2.92
| 1 | EA | $10,000.00 | $17,000.00 |
$17,000.00
| $17,000.00 | $17,000.00 |
601.09.011 | TRAFFIC CONTROL |
6.35
| 1 | LS | $40,000.00 | $37,000.00 |
$37,000.00
| $37,000.00 | $37,000.00 |
601.09.017 | FLASHING ARROW SIGN |
0.17
| 1 | EA | $5,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
0.34
| 1 | EA | $5,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
| IMPLEMENTATION OF THE GROUNDWATER MANAGEMENT PLAN |
3.43
| 1 | LS | $66,400.00 | $20,000.00 |
$20,000.00
| $20,000.00 | $20,000.00 |
| INTERCONNECTION TO EXISTING WATERMAIN |
5.15
| 2 | EA | $15,000.00 | $15,000.00 |
$30,000.00
| $15,000.00 | $15,000.00 |
| REMOVE WATERMAIN |
0.34
| 1 | LS | $12,750.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
| 2' X 3' X 4' PREBAFRICATED CONCRETE VAULT |
2.23
| 1 | EA | $3,000.00 | $13,000.00 |
$13,000.00
| $13,000.00 | $13,000.00 |
| HORIZONTAL DIRECTIONAL DRILLING |
14.93
| 1 | LS | $93,500.00 | $87,000.00 |
$87,000.00
| $87,000.00 | $87,000.00 |
| IN-LINE TERMINAL SYSTEM (TYPE MSKT-SP-MGS) |
0.79
| 1 | EA | $5,000.00 | $4,600.00 |
$4,600.00
| $4,600.00 | $4,600.00 |
| PREPARATION OF THE GROUNDWATER MANAGEMENT PLAN (STIPULATED UNIT PRICE OF $2,500) |
0.43
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| Total Percent | 100 | | | | Total Amount | $582,626.00 | | |