LA County Public Works
Toggle navigation
dpw.lacounty.gov
  • Menu 
    • DPW Home
    • Do Business with Public Works
    • Local Small Business Enterprise | LSBE
    • Disabled Veteran Business Enterprise | DVBE
    • Social Enterprise | SE
    • Prime Contractor
    • Local and Targeted Worker Hire Program
    • Community Workforce Agreement
    • Get Contracts
    • Opportunities
    • Active As-Needed
    • Active JOC Contracts
    • Get Informed
    • Calendar of Events
    • Contact Us
    • Resources
  1. Home
  2. Business Opportunities
  3. Project Summary

Project Summary

APT5080452
None
San Gabriel Valley Airport Apron Pavement Rehabilitation - Phase 2
Within the airport property at 4233 N. Santa Anita Ave., El Monte * vicinity map
Reconstruct ramp/apron areas
5/16/2017
6/13/2017
7/25/2017
12/1/2017
10/11/2018
El Monte
$5,262,778.28 View Bid Results
Griffith Company
3050 East Birch Street
Brea CA 92821
View Plan Holders
Payments
Period EndingPayment Type
04/02/2019 Retention
04/02/2019 As-Built
02/11/2019 Progress
02/11/2019 Progress
01/02/2019 Progress
10/12/2018 Progress
09/21/2018 Progress
08/22/2018 Progress
07/26/2018 Progress
07/25/2018 Progress
05/24/2018 Progress
04/25/2018 Progress
03/22/2018 Progress
02/22/2018 Progress
01/24/2018 Progress
12/22/2017 Progress
Documents
DocumentNotesDatePagesSize
Bid Summary
  • $5.26M
  • Griffith Company
6/13/2017 10
Adopt, Advertise, & Award
  • $5.5M - $7.5M
  • FAA AIP grant
  • Caltrans CAAP AIP grant
County
  • Aviation Enterprise Fund
  • M02 Enterprise Fund
5/16/2017 11
Consultant Services Agreement County of Los Angeles
  • Agency
7/6/2017 19 1.05 Mb
Consultant Services Agreement Consultant Services Agreement 5/8/2017 22 80.38 kb
Addendum Addendum No. 3 - Addendum No. 3 revised answer to pre-bid question 6/8/2017 1 31.76 kb
Addendum Addendum No. 2 - prebid questions & revised Schedule of Prices 6/8/2017 8 282.49 kb
Addendum Addendum No. 1 - NIB, site visit 5/22/2017 1 26.7 kb
Bidder Responsibility Questionnaire Airport Bidder Responsibility Questionnaire 5/8/2017 36 116.88 kb
Plans (as advertised) Plans 5/8/2017 50 15.61 Mb
Special Provisions Special Provisions & Sample Agreement 5/8/2017 280 2.16 Mb
Bid Proposal Bid Proposal & Schedule of Prices 5/8/2017 48 154.7 kb
Notice Inviting Bids Notice Inviting Bids 5/8/2017 6 31.61 kb
Instructions To Bidders Instructions To Bidders (January 2013) 5/8/2017 22 287.08 kb

Bid Items
Item Description Unit of Measure Estimated Quantity
1 CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) LS 1
2 CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) MTH 10
3 CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) LS 1
4 PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) LS 1
5 IMPLEMENTATION OF THE SWPPP LS 1
6 OFFICE FACILITIES MTH 10
7 MOBILIZATION LS 1
8 S-101 LOW PROFILE BARRICADES PHASE 1 LF 2,836
9 S-101 LOW PROFILE BARRICADES PHASE 2 LF 553
10 S-101 LOW PROFILE BARRICADES PHASE 3 LF 891
11 S-101 GATE GUARDS / FLAG PERSONS DAYS 190
12 P-101 ASPHALT CONCRETE PAVEMENT REMOVAL SY 120,654
13 P-101 CONCRETE PAVEMENT REMOVAL SY 90
14 P-101 TIE-DOWN ANCHOR REMOVAL EA 1,107
15 P-101 CONCRETE DIAMOND GRINDING SF 2,023
16 P-101 SAWCUT AC PAVEMENT LF 6,702
17 P-101 COLD MILL AC PAVEMENT SY 1,042
18 P-101 REMOVE EDGE LIGHT EA 6
19 P-101 REMOVE ABANDONED PULLBOX 2'X3' ON PALLETT EA 2
20 P-101 REMOVE ABANDONED PULLBOX 10"X17" EA 1
21 P-102 ADJUST WATER VALVE TO GRADE EA 6
22 P-102 ADJUST WATER METER TO GRADE EA 2
23 P-102 ADJUST MONITORING WELL TO GRADE EA 2
24 P-102 ADJUST ELECTRICAL/COMM HANDHOLE TO GRADE EA 14
25 P-102 ADJUST SEWER CLEANOUT TO GRADE EA 2
26 P-102 ADJUST SEWER MANHOLE TO GRADE EA 9
27 P-102 ADJUST UTILITY BOX TO GRADE EA 5
28 P-102 CONSTRUCT GATE SENSOR LOOPS LS 1
29 P-151 CLEARING AND GRUBBING SY 1,640
30 P-152 UNCLASSIFIED EXCAVATION & EXPORT CY 14,952
31 P-152 SUBGRADE GRADING AND RECOMPACTION SY 120,557
32 P-152 GEOGRID SY 16,000
33 P-154 SUBBASE COURSE CY 199
34 P-208 AGGREGATE BASE COURSE CY 21,000
35 P-208 GRANULAR SHOULDER, 4" THICK SY 786
36 P-208 SERVICE ROAD CONNECTOR, 6" THICK SY 34
37 P-403 BITUMINOUS SURFACE COURSE TON 20,000
38 P-501 PORTLAND CEMENT CONCRETE PAVEMENT (6") SY 1,561
39 P-501 PORTLAND CEMENT CONCRETE PAVEMENT (4") SY 230
40 P-602 BITUMINOUS PRIME COAT GAL 29,302
41 P-608 EMULSIFIED ASPHALT SEAL COAT SY 85
42 P-608 FUEL RESISTANT SEALER SY 18,030
43 P-610 AIRCRAFT TIE DOWN ANCHOR EA 441
44 P-620 YELLOW MARKINGS (2 COATS) SF 8,367
45 P-620 WHITE MARKINGS (2 COATS) SF 2,902
46 P-620 BLACK MARKINGS (1 COAT) SF 31,784
47 P-620 ORANGE MARKINGS (2 COATS) SF 126
48 P-620 BLUE MARKINGS (1 COAT) SF 14
49 P-620 REPAINT EXISTING MARKINGS SF 13,277
50 D-701 12" RCP 2500D LF 133
51 D-701 18" RCP, 2500D LF 352
52 D-702 12" SLOTTED DRAIN WITH CONCRETE GUTTER LF 409
53 D-702 18" SLOTTED DRAIN WITH CONCRETE GUTTER LF 644
54 D-702 CONNECT CSPTO EXISTING CSP (DETAIL 8) LS 1
55 D-751 CATCH BASIN PER STD PLAN 304, 1 GRATE EA 1
56 D-751 CATCH BASIN PER STD PLAN 304, 1 GRATE (INCLUDING CONCRETE APRON) EA 11
57 D-751 CONCRETE APRON AROUND EXISTING INLET EA 1
58 D-751 CONNECT TO EXISTING INLET PER STD PLAN 335 EA 4
59 D-751 JUNCTION STRUCTURE AT EXISTING STORM DRAIN PER STD PLAN 340 EA 2
60 D-754 LONGITUDINAL GUTTER LF 2,594
61 D-754 VARIABLE HEIGHT REINFORCED PCC CURB LF 144
62 H-100 REMOVE AND DISPOSE OF HANGAR ROW "P" LS 1
63 H-100 REMOVE AND DISPOSE OF HANGAR ROW "Q" LS 1
64 H-100 REMOVE AND DISPOSE OF HANGAR ROW "T" LS 1
65 H-100 REMOVE AND RE-INSTALL OF HANGAR ROW "N" LS 1
66 H-100 REMOVE AND RE-INSTALL OF HANGAR ROW "O" LS 1
67 H-100 INSTALL HANGAR TIE-DOWN ANCHORS (ALLOWANCE OF $20,000) AL 20,000
Adobe Acrobat Reader is required to view (.pdf) documents.
Click on logo below to download Adobe Acrobat Reader.
Adobe Acrobat
  • lacounty.gov
  • Public Works FAQ
  • Privacy - Terms of Use
  • ADA / Accessibility
  • Feedback
  • Feedback

Translate