| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
5 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 6 |
PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) |
LS |
1 |
| 7 |
IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
LS |
1 |
| 8 |
REMOVAL AND DISPOSAL OF LBP/LCP WASTE |
LS |
1 |
| 9 |
PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) |
LS |
1 |
| 10 |
IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN |
LS |
1 |
| 11 |
CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) |
AL |
35,000 |
| 12 |
OFFICE FACILITIES |
MTH |
6 |
| 13 |
MOBILIZATION |
LS |
1 |
| 14 |
DEMOLITION |
LS |
1 |
| 15 |
OPERATIONAL TESTS |
LS |
1 |
| 16 |
TRASH RACK |
LS |
1 |
| 17 |
DISCHARGE PIPES PAINTING AND COATING |
LS |
1 |
| 18 |
ACCESS HATCH |
LS |
1 |
| 19 |
MISCELLANEOUS MECHANICAL WORKS |
LS |
1 |
| 20 |
16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT CORDOVA WALK PUMP STATION |
EA |
2 |
| 21 |
16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT NAPLES PUMP STATION |
EA |
3 |
| 22 |
FURNISH AND INSTALL SUMP PUMP AND ACCESSORIES |
LS |
1 |
| 23 |
FURNISH SPARE SUMP PUMP |
EA |
2 |
| 24 |
MISCELLANEOUS ELECTRICAL WORKS FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 25 |
MISCELLANEOUS ELECTRICAL WORKS FOR NAPLES PUMP STATION |
LS |
1 |
| 26 |
REMOVE EXISTING CONCRETE |
LS |
1 |
| 27 |
STRUCTURE CONCRETE* |
CY |
4 |
| 28 |
DRILL AND BOND DOWEL (EPOXY CARTRIDGE) |
LF |
129 |
| 29 |
INJECT CRACK (CHEMICAL GROUT) |
LS |
1 |
| 30 |
REPLACE ROOFING MATERIALS |
SF |
375 |
| 31 |
LANDSCAPING |
LS |
1 |
| 32 |
IRRIGATION SYSTEM |
LS |
1 |
| 33 |
CLASS A TOPSOIL |
CY |
15 |
| 34 |
CONCRETE SEATWALL |
LF |
28 |
| 35 |
90 DAY PLANT ESTABLISHMENT PERIOD |
LS |
1 |
| 36 |
CLEARING AND GRUBBING |
LS |
1 |
| 37 |
DECORATIVE BOULDERS |
LS |
1 |
| 38 |
AGRONOMIC SOIL REPORT |
LS |
1 |
| 39 |
3" LAYER OF LANDSCAPE MULCH AS TOP DRESS |
SF |
400 |
| 40 |
TRAFFIC CONTROL |
LS |
1 |
| 41 |
SOUTHERN CALIFORNIA EDISON WORK (ALLOWANCE OF $20,000) |
AL |
20,000 |
| 42 |
3-INCH PVC SCHEDULE 80 CONDUIT FOR NAPLES PUMP STATION |
LF |
465 |
| 43 |
4-INCH PVC SCHEDULE 80 CONDUIT FOR CORDOVA WALK PUMP STATION |
LF |
85 |
| 44 |
MANUAL TRANSFER SWITCH |
EA |
2 |
| 45 |
METERED MAIN SERVICE PEDESTAL WITH CONCRETE FOUNDATION AND WIRE/CONDUIT |
LS |
1 |
| 46 |
METERED MAIN SERVICE PANEL AND CONDUIT/WIRE |
LS |
1 |
| 47 |
DISTRIBUTION PANEL AND WIRE/CONDUIT |
EA |
2 |
| 48 |
MINI POWER CENTER/ZONE AND WIRE/CONDUIT |
EA |
2 |
| 49 |
MAIN PUMP CONTROL PANEL AND WIRE/CONDUIT |
EA |
5 |
| 50 |
SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT |
EA |
2 |
| 51 |
CENTRAL CONTROLLER AND WIRE/CONDUIT |
EA |
2 |
| 52 |
ANNUNCIATOR PANEL AND WIRE/CONDUIT |
EA |
2 |
| 53 |
BUBBLER PANEL AND WIRE/CONDUIT |
EA |
2 |
| 54 |
FLOAT SWITCH ENCLOSURE AND WIRE/CONDUIT |
EA |
2 |
| 55 |
PRESSURE TANSDUCER ENCLOSURE AND WIRE/CONDUIT |
EA |
2 |
| 56 |
TELEMETRY CABINET WITH ANTENNA AND WIRE/CONDUIT |
EA |
2 |
| 57 |
GAS DETECTION PANEL WITH COMBUSTIBLE GAS SENSORS AND WIRE/CONDUIT |
EA |
2 |
| 58 |
INTRUSION ALARM PANEL WITH DOOR CONTACT SWITCH AND WIRE/CONDUIT |
EA |
2 |
| 59 |
LIGHTING AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 60 |
LIGHTING AND WIRE/CONDUIT FOR NAPLES PUMP STATION |
LS |
1 |
| 61 |
GROUND ROD COPPER-CLAD (3/4" DIAMETER BY 10') |
EA |
4 |
| 62 |
GROUND WELL |
EA |
2 |
| 63 |
SHORT CIRCUIT, COORDINATION, AND ARC-FLASH STUDY |
EA |
2 |
| 64 |
TEMPORARY PUMP CONTROL PANEL AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 65 |
TEMPORARY PUMP CONTROL PANEL AND WIRE/CONDUIT FOR NAPLES PUMP STATION |
LS |
1 |
| 66 |
TEMPORARY SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 67 |
TEMPORARY SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT FOR NAPLES PUMP STATION |
LS |
1 |
| 68 |
PORTABLE GENERATOR RENTAL FOR CORDOVA WALK PUMP STATION |
MO |
6 |
| 69 |
PORTABLE GENERATOR RENTAL FOR NAPLES PUMP STATION |
MO |
6 |
| 70 |
PREPARATION OF DEWATERING PLAN FOR CORDOVA WALK PUMP STATION (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 71 |
PREPARATION OF DEWATERING PLAN FOR NAPLES PUMP STATION (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 72 |
IMPLEMENTATION OF DEWATERING PLAN FOR CORDOVA WALK PUMP STATION (ALLOWANCE OF $25,000) |
AL |
25,000 |
| 73 |
IMPLEMENTATION OF DEWATERING PLAN FOR NAPLES PUMP STATION (ALLOWANCE OF $25,000) |
AL |
25,000 |
| 74 |
GEOTECHNICAL REPORT FOR SHORING AND BRACING FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 75 |
GEOTECHNICAL REPORT FOR SHORING AND BRACING FOR NAPLES PUMP STATION |
LS |
1 |
| 76 |
SHORING OF OPEN EXCAVATIONS FOR CORDOVA WALK PUMP STATION |
LS |
1 |
| 77 |
SHORING OF OPEN EXCAVATIONS FOR NAPLES PUMP STATION |
LS |
1 |
| 78 |
MICROTUNNELING (DIRECTIONAL BORING) FOR NAPLES PUMP STATION |
LF |
450 |
| 79 |
4-INCH PVC SCHEDULE 80 CONDUIT FOR NAPLES PUMP STATION |
LF |
160 |