| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
11 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
| 6 |
IMPLEMENTATION OF THE SWPPP |
LS |
1 |
| 7 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
| 8 |
OFFICE FACILITIES |
MTH |
12 |
| 9 |
MOBILIZATION |
LS |
1 |
| 10 |
CLEARING AND GRUBBING |
LS |
1 |
| 11 |
DEBRIS REMOVAL |
LS |
1 |
| 12 |
ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) |
EA |
6 |
| 13 |
TREE REMOVAL (13"-24" DIAMETER) |
EA |
3 |
| 14 |
CROWN REDUCTION, TREE (1" - 12" DIAMETER) |
EA |
1 |
| 15 |
CROWN REDUCTION, TREE (13" - 24" DIAMETER) |
EA |
2 |
| 16 |
CROWN REDUCTION, TREE (25" + DIAMETER) |
EA |
1 |
| 17 |
REMOVE EXISTING CHAIN LINK FENCE |
LF |
76 |
| 18 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
783 |
| 19 |
REMOVE EXISTING CHAIN LINK GATE |
EA |
1 |
| 20 |
REMOVE EXISTING 5' HIGH CHAIN LINK FENCE AND GATE |
LF |
108 |
| 21 |
REMOVE WROUGHT IRON GATE |
EA |
5 |
| 22 |
REMOVE METAL HAND RAILINGS |
LF |
10 |
| 23 |
ADJUST WROUGHT IRON GATE |
EA |
2 |
| 24 |
CONCRETE REMOVAL (REINFORCED) |
CY |
16 |
| 25 |
UNCLASSIFIED EXCAVATION |
CY |
1,267 |
| 26 |
UNCLASSIFIED EXCAVATION (ROADWAY) |
CY |
3,668 |
| 27 |
CRUSHED MISCELLANEOUS BASE |
CY |
1,009 |
| 28 |
TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
CY |
1 |
| 29 |
CEMENT STABILIZED PULVERIZED BASE, 12" THICK |
SY |
32,602 |
| 30 |
CEMENT STABILIZED PULVERIZED BASE, 14" THICK |
SY |
3,184 |
| 31 |
REMOVE EXISTING PLANTER |
LS |
1 |
| 32 |
PORTLAND CEMENT FOR CSPB |
TON |
1,068 |
| 33 |
COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
SF |
293,317 |
| 34 |
COLD MILL AC PAVEMENT (> 3") |
SF |
28,655 |
| 35 |
AC PAVEMENT |
TON |
5,490 |
| 36 |
AC PAVEMENT(PATCH BACK) |
TON |
2 |
| 37 |
RECONSTRUCT MANHOLE |
EA |
55 |
| 38 |
PCC PAVEMENT |
CY |
61 |
| 39 |
ASPHALT RUBBER HOT MIX |
TON |
3,026 |
| 40 |
MANHOLE PER STD PLAN 321 |
EA |
3 |
| 41 |
PCC CURB, TYPE A1-VAR |
LF |
317 |
| 42 |
PCC CURB & GUTTER, TYPE A2-6 |
LF |
109 |
| 43 |
PCC CURB & GUTTER, TYPE A2-8 |
LF |
403 |
| 44 |
PCC CURB & GUTTER, TYPE A2-VAR |
LF |
1,616 |
| 45 |
TEMPORARY AC PAVEMENT (PATCH BACK) |
TON |
56 |
| 46 |
AC PAVEMENT (SPEED CUSHION) |
TON |
8 |
| 47 |
PCC WALK & DRIVEWAYS, 4" THICK |
SF |
28,411 |
| 48 |
PCC CURB RAMPS |
CY |
118 |
| 49 |
PCC DRIVEWAYS, 6" THICK |
SF |
80 |
| 50 |
DETECTABLE WARNING SURFACE |
SF |
819 |
| 51 |
CROSS GUTTER |
CY |
232 |
| 52 |
RECONSTRUCT CATCH BASIN TOP PER STD PLAN 300-4, W=7' |
EA |
1 |
| 53 |
MODIFICATION FOR SIDE OPENING CB PER STD PLAN 314-3 |
EA |
1 |
| 54 |
BICYCLE CATCH BASIN GRATE PER CITY OF LOS ANGELES STD PLAN S-342-4 |
EA |
2 |
| 55 |
ALLEY INTERSECTION |
CY |
8 |
| 56 |
METAL HAND RAILINGS PER STD PLAN 606 |
LF |
11 |
| 57 |
3" CONDUIT (SCH 80 PVC) |
LF |
420 |
| 58 |
12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
LF |
1,400 |
| 59 |
MODIFIED PARKWAY DRAIN PER STD PLAN 151, S=48", INLET TYPE 1 |
EA |
1 |
| 60 |
REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 3 (H=6', LATERAL LOADING 20 PSF) |
LF |
56 |
| 61 |
PCC FOOTING FOR REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 3 |
CY |
8 |
| 62 |
3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
LF |
779 |
| 63 |
5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
LF |
201 |
| 64 |
NO. 6 PULL BOX INCL PCC COVER |
EA |
2 |
| 65 |
REMOVE PULL BOX AND RESURFACE SIDEWALK |
EA |
1 |
| 66 |
REMOVE PEDESTRIAN PUSH BUTTON |
EA |
7 |
| 67 |
PEDESTRIAN PUSH BUTTON PLATE |
EA |
7 |
| 68 |
PCC CURB & GUTTER, TYPE A2-8, W=2.5' |
LF |
177 |
| 69 |
INSTALL FIRE HYDRANT LOCATION RPM |
EA |
14 |
| 70 |
RELOCATE SIGN |
EA |
1 |
| 71 |
PCC CURB & GUTTER, TYPE A2-VAR, W=1' |
LF |
125 |
| 72 |
PCC CURB & GUTTER, TYPE E (CALTRANS STD PLAN A87A) |
LF |
49 |
| 73 |
LOCAL DEPRESSION PER STD PLAN 313-4, CASE E |
EA |
1 |
| 74 |
LOCAL DEPRESSION PER STD PLAN 313-4, CASE F |
EA |
2 |
| 75 |
FURNISH AND PLANT 24" BOX TREE |
EA |
3 |
| 76 |
RIVER ROCK PAVING |
SF |
339 |
| 77 |
CHAIN LINK FENCE AND GATE, 5' HIGH PER STD PLAN 600 |
LF |
108 |
| 78 |
18" N-12 WT HDPE PIPE |
LF |
254 |
| 79 |
WIRE #10 |
LF |
770 |
| 80 |
WIRE #6 |
LF |
100 |
| 81 |
COMPOSITE TYPE 3 PULL BOX INCL COVER |
EA |
5 |
| 82 |
REMOVE PULL BOX |
EA |
5 |
| 83 |
REMOVE MICROWAVE SENSING UNIT |
EA |
1 |
| 84 |
APS PPB WITH SPECIAL VOICE MESSAGE |
EA |
7 |
| 85 |
CENTRAL CONTROLLER UNIT APS |
EA |
1 |
| 86 |
4-CAMERA VIDEO/RADAR DETECTION SYSTEM (COMPLETE) |
EA |
1 |
| 87 |
RELOCATE SIGN POST |
EA |
1 |
| 88 |
TREE WELL, TYPE 1, CASE 2 (MOD) |
EA |
3 |
| 89 |
CEMENT MORTAR BED, 6" THICK |
SF |
339 |
| 90 |
TRAFFIC CONTROL |
LS |
1 |
| 91 |
REMOVE AND REPLACE EXISTING STONE RIPRAP |
LS |
1 |