Item |
Description |
Unit of Measure |
Estimated Quantity |
1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
6 |
3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
4 |
PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) |
LS |
1 |
5 |
IMPLEMENTATION OF THE SWPPP |
LS |
1 |
6 |
PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
7 |
OFFICE FACILITIES |
MTH |
6 |
8 |
MOBILIZATION |
LS |
1 |
9 |
CLEARING AND GRUBBING |
LS |
1 |
10 |
REMOVE AND SALVAGE WROUGHT IRON FENCE |
LF |
23 |
11 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
730 |
12 |
CONCRETE REMOVAL (REINFORCED) |
CY |
12 |
13 |
UNCLASSIFIED EXCAVATION |
CY |
1,835 |
14 |
UNCLASSIFIED EXCAVATION (ROADWAY)* |
CY |
5,990 |
15 |
AGRONOMIC SOIL REPORT |
EA |
2 |
16 |
CLASS "D" BIOSWALE SOIL |
CY |
6 |
17 |
DRAINAGE GEOTEXTILE |
SY |
43 |
18 |
STABILIZATION GEOTEXTILE |
SY |
1,159 |
19 |
CONCRETE SEDIMENT TRAP SPLASH PAD |
EA |
2 |
20 |
CRUSHED AGGREGATE BASE |
CY |
8 |
21 |
CRUSHED MISCELLANEOUS BASE |
CY |
1,157 |
22 |
CEMENT STABILIZED PULVERIZED BASE, 8" THICK |
SY |
28,089 |
23 |
PORTLAND CEMENT FOR CSPB |
TON |
552 |
24 |
PRIME/TACK COAT FOR CSPB |
GAL |
5,617 |
25 |
CSPB MIX DESIGN (STIPULATED UNIT PRICE OF $15,000) |
LS |
1 |
26 |
AC PAVEMENT |
TON |
4,046 |
27 |
AC PAVEMENT(PATCH BACK) |
TON |
156 |
28 |
RECONSTRUCT MANHOLE |
EA |
38 |
29 |
PCC PAVEMENT |
CY |
300 |
30 |
ASPHALT RUBBER HOT MIX |
TON |
1,888 |
31 |
ASPHALT RUBBER HOT MIX (TEST STRIP) |
TON |
500 |
32 |
36" MANHOLE FRAME AND COVER |
EA |
1 |
33 |
CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET |
EA |
1 |
34 |
PARKWAY DRAIN PER STD PLAN 151, S=24", INLET TYPE 2 |
EA |
1 |
35 |
PARKWAY CULVERT PER STD PLAN 3055-1 |
LF |
49 |
36 |
REINFORCED CONCRETE STAIRWAY PER STD PLAN 640 |
CY |
3 |
37 |
MASONRY RETAINING WALL PER STD PLAN 618-3, TYPE A |
SF |
128 |
38 |
MASONRY RETAINING WALL PER STD PLAN 618-3, TYPE B |
SF |
102 |
39 |
PCC FOOTING FOR MASONRY RETAINING WALL |
CY |
7 |
40 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
41 |
LOW CONCRETE RETAINING WALL |
LF |
47 |
42 |
PCC CURB, TYPE A1-6 |
LF |
149 |
43 |
PCC CURB, TYPE A1-8 |
LF |
181 |
44 |
PCC CURB & GUTTER, TYPE A2-6 |
LF |
597 |
45 |
PCC CURB & GUTTER, TYPE A2-8 |
LF |
1,516 |
46 |
PCC CURB, TYPE A1-VAR |
LF |
82 |
47 |
PCC CURB & GUTTER, TYPE A2-VAR |
LF |
680 |
48 |
LONGITUDINAL GUTTER |
CY |
1 |
49 |
PCC WALK & DRIVEWAYS, 4" THICK |
SF |
12,226 |
50 |
PCC CURB RAMPS |
CY |
133 |
51 |
PCC WALK & DRIVEWAYS, 6" THICK |
SF |
197 |
52 |
PCC, 4" THICK |
SF |
239 |
53 |
RIVER ROCK PAVING* |
SF |
114 |
54 |
RIVER ROCK COBBLE |
SF |
345 |
55 |
DETECTABLE WARNING SURFACE |
SF |
918 |
56 |
CROSS GUTTER |
CY |
104 |
57 |
CROSS GUTTER (MOD) |
CY |
93 |
58 |
ALLEY INTERSECTION |
CY |
6 |
59 |
METAL HAND RAILINGS PER STD PLAN 606 |
LF |
42 |
60 |
WROUGHT IRON FENCE PER DETAIL ON SHEET 17 |
LF |
22 |
61 |
WROUGHT IRON GATE PER DETAIL ON SHEET 17 |
EA |
1 |
62 |
RECONSTRUCT CATCH BASIN TOP PER DETAIL A, SHEET 4, 1-GRATE (INCLUDING ARS) |
EA |
1 |
63 |
RECONSTRUCT CATCH BASIN TOP PER DETAIL B, SHEET 4, 1-GRATE |
EA |
1 |
64 |
RECONSTRUCT CATCH BASIN TOP PER DETAIL B, SHEET 4, 2-GRATES |
EA |
4 |
65 |
RECONSTRUCT CATCH BASIN TOP PER DETAIL C, SHEET 4, 1-GRATE |
EA |
2 |
66 |
INFILTRATION BASIN PER DETAIL A ON SHEET 5 |
EA |
5 |
67 |
4" CONDUIT (SCH 80 PVC) |
LF |
175 |
68 |
NO. 6 PULL BOX INCL PCC COVER |
EA |
5 |
69 |
INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
LF |
500 |
70 |
DETAIL 2 (THERMOPLASTIC) |
LF |
2,330 |
71 |
DETAIL 22 (THERMOPLASTIC) |
LF |
1,740 |
72 |
DETAIL 32 (THERMOPLASTIC) |
LF |
790 |
73 |
DETAIL 38 (THERMOPLASTIC) |
LF |
430 |
74 |
PAVEMENT MARKINGS (THERMOPLASTIC) |
SF |
1,519 |
75 |
12" STRIPING (THERMOPLASTIC) |
LF |
1,895 |
76 |
24" STRIPING (THERMOPLASTIC) |
LF |
250 |
77 |
CURB MARKINGS (ONE-COAT PAINT) |
LF |
370 |
78 |
REMOVE PAVEMENT MARKINGS (PAINT) |
SF |
119 |
79 |
REMOVE 8" STRIPING (PAINT) |
LF |
600 |
80 |
INSTALL FIRE HYDRANT LOCATION RPM |
EA |
13 |
81 |
SIGN POST (ROADSIDE SIGN) |
EA |
15 |
82 |
SIGN PANEL |
EA |
32 |
83 |
RELOCATE SIGN |
EA |
6 |
84 |
REMOVE SIGN |
EA |
7 |
85 |
TRAFFIC CONTROL |
LS |
1 |
86 |
FURNISH AND PLANT 24" BOX TREE |
EA |
5 |
87 |
DECOMPOSED GRANITE, 3" THICK* |
SF |
72 |
88 |
TREE WELL AND COVER PER STD PLAN 519, TYPE 1 |
EA |
4 |
89 |
LANDSCAPING |
LS |
1 |
90 |
90 DAY LANDSCAPE PLANT ESTABLISHMENT PERIOD |
LS |
1 |