| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
MOBILIZATION |
LS |
1 |
| 2 |
OFFICE FACILITIES |
MO |
6 |
| 3 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MO |
5 |
| 6 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1000) |
LS |
1 |
| 7 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 8 |
UNCLASSIFIED EXCAVATION |
CY |
89 |
| 9 |
AC PAVEMENT(PATCH BACK) |
TON |
44 |
| 10 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
2 |
| 11 |
CRUSHED MISCELLANEOUS BASE |
CY |
54 |
| 12 |
AC PAVEMENT |
TON |
4 |
| 13 |
STRUCTURE CONCRETE |
CY |
13 |
| 14 |
BAR REINFORCING STEEL |
LB |
1,080 |
| 15 |
PCC CURB, TYPE A1-6 |
LF |
877 |
| 16 |
STRUCTURAL STEEL |
LB |
5,150 |
| 17 |
PERVIOUS CONCRETE, 6" THICK* |
SF |
2,216 |
| 18 |
CLEAN & PAINT STRUCTURAL STEEL |
LS |
1 |
| 19 |
DRILL PILE HOLES, 18" DIA |
CY |
118 |
| 20 |
4" STRIPING (THERMOPLASTIC) |
LF |
5,067 |
| 21 |
REMOVE STRIPING AND MARKINGS (THERMOPLASTIC) |
SF |
2,000 |
| 22 |
PAVEMENT MARKINGS (THERMOPLASTIC) |
SF |
378 |
| 23 |
SIGN PANEL |
EA |
11 |
| 24 |
FURNISH ONE-POST (ROADSIDE SIGN) |
EA |
11 |
| 25 |
LIGHT POLES 25' |
EA |
1 |
| 26 |
ELECTRICAL WORK |
LS |
1 |
| 27 |
WHEEL STOP |
EA |
186 |
| 28 |
PREFAB GUARD BOOTH |
LS |
1 |
| 29 |
AGRONOMIC SOIL REPORTS |
EA |
6 |
| 30 |
UNCLASSIFIED EXCAVATION LANDSCAPE |
CY |
1,207 |
| 31 |
CLASS "D" BIOSWALE SOIL |
CY |
741 |
| 32 |
CRUSHED AGGREGATE BASE (CAB) |
CY |
41 |
| 33 |
CONCRETE SEATWALL W/ANTI-SKATE BUMPS |
LS |
1 |
| 34 |
TRASH RECEPTACLE (W/ NEW 6" THICK PERVIOUS CONCRETE PAD) |
EA |
10 |
| 35 |
BUS SHELTER |
LS |
1 |
| 36 |
DECORATIVE BOULDERS |
EA |
79 |
| 37 |
LID RIVER ROCK COBBLE SWALE |
TON |
46 |
| 38 |
INTERPRETIVE SIGNAGE |
EA |
1 |
| 39 |
BIKE RACK |
EA |
8 |
| 40 |
IRRIGATION |
LS |
1 |
| 41 |
FURNISH AND PLANT 24 INCH BOX TREE |
EA |
55 |
| 42 |
LANDSCAPING |
LS |
1 |
| 43 |
PLANT ESTABLISHMENT PERIOD |
LS |
1 |