PROJECT NAME |
SCOPE OF WORK |
PROJECT SUMMARY |
START DATE |
FINISH DATE |
South Whittier Los Nietos - Keith Drive, et al. |
Reconstruction of asphalt pavement on cement stabilized pulverized base, construction of sidewalk, curb and gutter, curb ramps, and the performance of other appurtenant work. |
RMD4408001 |
2/21/20 |
5/13/22 |
Agua Dulce - Escondido Canyon Road (Phase I) - Agua Dulce Canyon Road to SR-14 |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD2502008 |
|
6/3/22 |
White Fence Farms - 30th Street West - Avenue M to Avenue N-8 |
The proposed work includes 1.5 inches AC pavement cold mill and overlay; installation of striping and pavement markings; and the performance of other appurtenant work. |
RMD5502033 |
|
8/5/22 |
Del Sur - 90th St West - Ave G to Ave J |
Cold mill 2" asphalt pavement and put back 2" overlay |
RMD5502039 |
|
5/8/23 |
Altadena - Canyon Crest Rd: 2900' W/O Lincoln Av to Canyon Dell Dr |
Mill 1.5" of pavement and construct 1.5" of AC overlay |
RMD2506011 |
7/17/23 |
8/9/23 |
10th Street East - Avenue G / Avenue E |
The proposed work includes chip sealing to extend the road surface life. |
RMD55AT006 |
|
9/20/22 |
Kagel Canyon Road, et al. (Phase III) |
The proposed work includes dig-outs, cold-milling and paving of asphalt concrete to preserve and provide a long-lasting finished driving surface. |
RMD2505010 |
|
6/27/23 |
Avenue P - 240th St East to 260th St East |
CIR |
RMD5503010 |
2/7/22 |
2/28/22 |
Altadena - Altadena Dr: Allen Av to 150' N/O Canyon Close Rd |
Mill 1.5" of pavement and construct 1.5" of AC overlay |
RMD2506012 |
8/28/23 |
9/1/23 |
Agua Dulce - Sierra Highway (Phase III) - Davenport Road to Center Street |
The proposed work includes cold mill existing pavement; cold-in-place recycling of roadway pavement; and place a layer of rubberized hot-mix asphalt over the CIR to provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. |
RMD2503002 |
|
5/12/23 |
Sierra Highway (Phase II) - Vasquez Canyon Road to 1200' N Davenport Road |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD2502004 |
|
7/8/22 |
Mountain View Avenue, et al. Resurfacing Project |
Road Resurfacing project: Mountain View Ave, Sycamore Ave, Oakdale Ave btwn Rosemead Blvd / Walnut Dr and Michillinda Ave |
RMD1530002 |
|
4/15/22 |
Sunnybrook Ln. Et Al |
Pavement preservation - Local Streets |
RMD4405012 |
|
9/30/22 |
South Antelope Valley - Sierra Highway from Pearblossom Highway to Avenue S |
The proposed work includes cold mill existing pavement; cold-in-place recycling of roadway pavement; and place a layer of rubberized hot-mix asphalt over the CIR to provide a long lasting finished driving surface. |
RMD5502018 |
6/12/23 |
10/20/23 |
Avenue G-6 - Division Street / 5th Street East |
The proposed work includes chip sealing to extend the road surface life. |
RMD55AT002 |
|
10/3/22 |
Del Sur - 110th Street West - Avenue F to Avenue J |
The proposed work includes cold mill and overlay of AC pavement; installation of striping and pavement markings; and the performance of other appurtenant work. |
RMD5502031 |
4/10/23 |
5/26/23 |
West Carson - Milton Street, et al. |
Reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work |
RMD3205003 |
|
8/19/22 |
Avenue J - 240th Street East / 255th Street East |
The proposed work involves chip sealing to extend the road surface life. |
RMD55AT005 |
|
11/22/22 |
NE Antelope Valley/Sun Village/Roosevelt/Redman - 90th Street East from Palmdale Boulevard to Avenue D |
The proposed work includes 2 inches AC pavement cold mill and overlay; installation of striping and pavement markings; and the performance of other appurtenant work. . |
RMD1567124 |
|
8/5/22 |
230th Street East - Avenue G / Avenue D-9 |
The proposed work includes double chip sealing to extend the road surface life. |
RMD55AT004 |
|
11/22/22 |
110th Street East - Avenue I / Avenue H |
The proposed work include chip seal to improve road ride-ability, and crack sealing to extend the road surface life. |
RMD5530008 |
2/22/22 |
7/15/22 |
White Fence Farms - Avenue O-8, et al. |
The proposed work includes cold mill and overlay of AC pavement; installation of striping and pavement markings; and the performance of other appurtenant work. |
RMD5502015 |
|
6/24/22 |
Rowland Heights - Saleroso Drive et al |
The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. |
RMD1408004 |
10/19/21 |
4/14/22 |
Del Sur - 70th Street West - Avenue A to Avenue E |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD5502025 |
4/18/22 |
8/16/22 |
Lemon Dr Et Al Phase I |
the proposed work includes cold-mill and overlay of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface |
RMD4406008 |
3/10/22 |
4/8/22 |
Acton - Crown Valley Road Phase I |
Resurfacing 11.5 lane miles in the unincorporated community of Acton. |
RMD5502043 |
10/10/23 |
10/18/23 |
100th Street East - Avenue J / Avenue J-8; Avenue K / Avenue L |
The proposed work includes chip sealing to extend the road surface life. |
RMD55AT003 |
|
10/4/22 |
Leona Valley - Johnson Road - Elizabeth Lake Rd to Avenue J |
Cold mill 2" of asphalt and put back 2" overlay |
RMD5502038 |
|
6/30/23 |
Avenue I - 90th Street East / 120th Street EAST |
The proposed work includes Chip Seal to improve road ride-ability, and crack sealing to extend the road surface life. |
RMD5530007 |
2/22/22 |
7/29/22 |
Windsor Hills - La Cienega Blvd Resurfacing |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD3202005 |
|
5/31/23 |
Canyon Country - Gazeley Street et al |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. |
RMD2506001 |
|
8/26/22 |
Big Tujunga Canyon Road |
The proposed work includes cold mill existing pavement; cold-in-place recycling of roadway pavement; and place a layer of rubberized hot-mix asphalt over the CIR to provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. |
RMD5504003 |
|
8/5/22 |
Avenue E |
The proposed work includes cold-mill and overlay with a layer of asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD5502040 |
|
8/18/22 |
San Francisquito Canyon Road - Elizabeth Lake Road to MM 5.96 |
The proposed work includes 5.96 mi of cold-in-place recycling of roadway pavement; and place a layer of rubberized hot-mix asphalt over the CIR to provide a long lasting finished driving surface. |
RMD5503008 |
|
7/7/22 |
Acton - Red Rover Mine Road |
The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. |
RMD2502006 |
|
7/22/22 |
Bouquet Canyon Road (Phase I) - MM 8.74 to Spunky Canyon Road |
The proposed work includes cold mill existing pavement; cold-in-place recycling of roadway pavement; and place a layer of rubberized hot-mix asphalt over the CIR to provide a long lasting finished driving surface. |
RMD2503006 |
|
5/23/22 |
Palmdale Blvd - 80th Street East to 90th Street East |
The proposed work includes 2 inches PMAC AC pavement cold mill and overlay; installation of striping and pavement markings; and the performance of other appurtenant work. |
RMD5502036 |
2/9/22 |
2/28/22 |
Hi Vista - Palmdale Boulevard (Phase IV) - 215th Street East to 240th Street East |
The proposed work includes double chip seal to preserve the pavement. To better care for the environment, all aggregates (tiny rocks) used come from recycled pavement. |
RMD5501003 |
2/7/22 |
2/28/22 |