Road Projects

Current Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Del Aire Community Road Improvements The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD3208003 6/1/20 10/15/20
Hacienda Heights Community - Garo Street, et al. Resurfacing of various roadways with asphalt rubber hot mix; rceconstruction of various roadways with asphalt rubber hot mix on cold central plant recycled asphalt concrete and cement stabilized pulverized base; reconstruction of curb and gutter, curb ramps, sidewalk, and driveways; removal, trimming, and root pruning of trees; and the performance of other appurtenant work. RDC0015702 5/11/20 4/2/21
New York Drive - Lake Avenue/120 feet W/o Altadena Drive Reconstruction of roadway pavement, curb and gutter, driveways, sidewalk, and curb ramps; construction of a storm drain system; guardrail; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work RDC0015777 1/14/19 3/20/20
Hacienda Heights - Vallecito Dr, et al. The proposed work includes cold mill existing pavement full width and place a layer of rubberized hot-mix asphalt over the cold-milled surface to provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as upgrade of curb ramps will also be performed. RDC0016448 10/5/20 11/19/20
U.S. 101/Palo Comado Canyon Rd Interchange Improvement (ABO)(AGH) Widen existing overcrossing from 40-feet to 76-feet to accommodate one travel lane in each direction, left-turn pockets, bike lanes, shoulders; and sidewalks. In addition, a signal will be installed at the northbound off-ramp to improve safety and circulation. RDC0016341 8/31/18 7/31/20
Kagel/Lopez Canyons - Kagel Canyon Road, et al. The proposed work includes, digouts with cape seal as well as cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD5501002 5/4/20
South Whittier Los Nietos - Keith Drive, et al. Reconstruction of asphalt pavement on cement stabilized pulverized base, construction of sidewalk, curb and gutter, curb ramps, and the performance of other appurtenant work. RMD4408001 3/2/20 3/7/22


Future Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Compton Bl, et al. - East Rancho Dominguez Resurface 2.1 miles of major roadways including parkway improvements and curb ramp upgrades. RDC0015726 11/22/21 2/20/22
East Los Angeles - Whiteside Street, et al. (Phase I) The proposed work includes pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the conventional asphalt on CSPB to provide a long lasting finished driving surface. RDC0015913 3/16/22 3/1/23
Walnut Park - Walnut Street, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4108001 2/9/22 2/9/23
Norwalk Bl, et al Reconstruct and Resurface RDC0015912 2/2/22 8/1/22
Hazard Av, et al. Construction of Asphalt Rubber Hot Mix (ARHM-GG-C), AC pavement, cement stabilized pulverized base, curb and gutter, curb ramps, cross gutters, sidewalk, driveways and bus pads; and the performance of other appurtenant work. RDC0016052 11/11/21 4/19/22
Chatsworth - Lake Manor Drive, et al. reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work RMD3508001 6/28/21 9/26/21
East Los Angeles - Floral Drive from Long Beach (I-710) Fwy to Mednik Ave The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4102002 6/17/22 6/17/23
Altadena Dr and Washington Blvd Roadway Improvement The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD2504001 12/13/21 7/11/22
Rosewood - 139th Street, et al. Phase II The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD3208002 6/2/22 6/2/23
East Los Angeles - City Terrace Drive, et al The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4104002 2/25/22 2/25/23
Wilshire Boulevard, Et Al. Reconstruction of curb & gutter, sidewalk, driveways, cross gutters, and curb ramps; construction of an asphalt-rubber and aggregate membrane, concrete pavement, and drainage structures, resurfacing of existing roadway pavement with tire rubber modified asphalt concrete; traffic signal modifications; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015533 7/13/21 6/28/22
Hacienda Heights - Hacienda Boulevard The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD1402001 2/21/22 2/21/23
Stevenson Ranch - Stevenson Ranch Tract (Phase 2) Proposed work includes a micro-mill and application of a scrub seal to extend the life of the roadways. Curb ramps upgrades for ADA compliance. RMD2505004
Los Nietos - Pioneer Boulevard, et al. The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4402006 6/30/22
Colima Rd - City of Whittier Boundary to Fullerton Rd Median Reconst, Restriping, T/S Upgrade RDC0014911 6/17/22 6/17/23
Quartz Hill Road, et al. Road rehabilitation, installation of curb and gutter, and the performance of other appurtenant work. RDC0015201 6/30/22
Washington Bl, et al. Road Resurfacing RDC0016075 7/7/22 1/3/23
South Whittier Sunshine Acres - Leland Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4408002 9/8/21 9/8/22
East Los Angeles Community Roadway Improvement Construction of curb and gutter, sidewalk, curb ramps, cross gutters, drainage structures, asphalt rubber and aggregate membrane, and tire rubber modified asphalt concrete; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0016147 12/22/21 12/17/22
Ladera Heights - Centinela Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RDC0012971 1/27/22 1/27/23
Hacienda Heights - Leticia Drive, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD1408001 8/26/22 12/24/22
East Los Angeles - Cesar E Chavez Avenue The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4102001 6/24/22 9/22/22
East Los Angeles - Whiteside Street, et al. (Phase II) The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4108005 9/8/22 4/24/23
Rolling Hills - Crenshaw Blvd The proposed work includes 1.5 inches AC pavement cold mill and overlay; installation of striping and pavement markings; and the performance of other appurtenant work. RMD3402001 11/15/21 11/15/22
West Carson - Milton Street, et al. reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work RMD3205003 2/11/21
Westmont - 99th Street, et al. Cold mill AC to produce cold central plant recycled asphalt concrete pavement (CCPRACP), pulverize & stabilize remaining AC w/ underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), then place layer of rubberized hot-mix asphalt over the CCPR on CSPB; reconstruct AC alleys with PCC; and parkway improvements RMD3267890 12/24/20 12/24/21
Industry - 6th Av (ABO)(IND) The proposed work includes cold-milling the existing pavement, pulverizing and stabilizing the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), and placing the hot-mix asphalt over the CSPB to provide a long lasting finished driving surface. RMD1108004 6/30/22
Avocado Heights/San Jose Hills - Valley Boulevard Construction of tire rubber modified asphalt concrete and cold central plant recycled asphalt concrete pavement on cement stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. RMD1104001 1/20/22 1/20/23


Completed Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Ballentine Place, et al. Reconstruct and Resurface RDC0015528 6/13/18 5/22/19
Old Topanga Canyon Road resurfacing of roadway pavement, installation of guardrails and the performance of other appurtenant work RDC0016306 8/26/19 1/3/20
Allen Avenue, et al. Resurfacing of existing asphalt concrete pavement; construction of curb and gutter, sidewalk, curb ramps, and drainage structures; landscaping; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0016069 10/15/18 8/9/19
Pine Canyon Road Cold-in-place recycled asphalt concrete, asphalt rubber hot mix; and the performance of other appurtenant work. RDC0014131 7/30/18 10/3/18
Elizabeth Lake Road 2,453 feet West of Munz Ranch Road to 2,095 feet East of Bouquet Canyon Road Construction of cold-in-place recycled asphalt concrete, asphalt rubber hot mix, metal beam guard rail, terminal end sections, and drainage structures; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015244 5/22/18 11/16/18
Mulholland Highway and Stokes Canyon Road, et al. Cold-in-place recycling of existing asphalt concrete pavement; resurfacing of the roadway with asphalt rubber hot mix; reconstruct/upgrade guardrails. RDC0015701 8/6/18 1/24/20
Leffingwell Rd-Telegraph Rd/La Mirada Bl (ABO)(LAM) Road rehab and the performance of other appurtenant work RDC0016068 3/8/19 5/10/19
Grand Avenue Roadway Rehabilitation Project (ABO)(COV) Road rehabilitation and the performance of other appurtenant work RDC0016162 8/27/18 5/31/19