Road Projects

Current Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
U.S. 101/Palo Comado Canyon Rd Interchange Improvement (ABO)(AGH) Widen existing overcrossing from 40-feet to 76-feet to accommodate one travel lane in each direction, left-turn pockets, bike lanes, shoulders; and sidewalks. In addition, a signal will be installed at the northbound off-ramp to improve safety and circulation. RDC0016341 8/31/18 7/31/20
Hacienda Heights - Vallecito Dr, et al. The proposed work includes cold mill existing pavement full width and place a layer of rubberized hot-mix asphalt over the cold-milled surface to provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as upgrade of curb ramps will also be performed. RDC0016448 11/2/20 1/7/21
Ladera Heights - 59th Street, et al. Roadway reconstruction; construction of asphalt rubber hot mix surface course, cold central plant recycled AC pavement base course, and cement-stablized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, curb ramps, and cross gutters. RDC0015844 11/2/20 4/6/21
Del Aire Community Road Improvements The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD3208003 11/30/20 2/26/21
New York Drive - Lake Avenue/120 feet W/o Altadena Drive Reconstruction of roadway pavement, curb and gutter, driveways, sidewalk, and curb ramps; construction of a storm drain system; guardrail; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work RDC0015777 1/14/19 12/4/20
South Whittier Los Nietos - Keith Drive, et al. Reconstruction of asphalt pavement on cement stabilized pulverized base, construction of sidewalk, curb and gutter, curb ramps, and the performance of other appurtenant work. RMD4408001 3/2/20 8/23/21


Future Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Industry - 6th Av (ABO)(IND) The proposed work includes cold-milling the existing pavement, pulverizing and stabilizing the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), and placing the hot-mix asphalt over the CSPB to provide a long lasting finished driving surface. RMD1108004 6/30/22
Brea Canyon Cutoff Rd, et al. Road Resurfacing RDC0016473 12/1/22 12/1/23
Rosewood - 139th Street, et al. Phase II The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD3208002 6/2/22 1/8/23
Avocado Heights/San Jose Hills - Valley Boulevard Construction of tire rubber modified asphalt concrete and cold central plant recycled asphalt concrete pavement on cement stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. RMD1104001 3/18/22 3/18/23
La Crescenta-Montrose - La Crescenta Avenue, et al. Construction of tire rubber modified asphalt concrete and cold in-place recycled asphalt concrete pavement; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. RMD1567111 11/1/22 2/1/23
Altadena Drive and Washington Boulevard Roadway Improvement The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD2504001 3/3/22 9/29/22
Washington Bl, et al. Road Resurfacing RDC0016075 9/19/22 3/18/23
Walnut Grove Avenue, et al. Construction of tire rubber modified asphalt concrete and cold central plant recycled asphalt concrete pavement on cement stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. RMD1567112 9/14/22 9/14/23
South Whittier Sunshine Acres - Leland Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4408002 1/28/22 1/28/23
Colima Rd - City of Whittier Boundary to Fullerton Rd Median Reconst, Restriping, T/S Upgrade RDC0014911 9/2/22 9/2/23
Quartz Hill Road, et al. Road rehabilitation, installation of curb and gutter, and the performance of other appurtenant work. RDC0015201 6/30/22
Walnut Park - Walnut Street, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4108001 6/13/22 6/13/23
East Los Angeles - Whiteside Street, et al. (Phase I) The proposed work includes pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the conventional asphalt on CSPB to provide a long lasting finished driving surface. RDC0015913 3/30/22 3/15/23
Chatsworth - Lake Manor Drive, et al. reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work RMD3508001 12/17/21 3/17/22
Santa Fe Av-Artesia Bl to Del Amo Bl Resurf and Reconst RDC0014455 10/26/22 4/19/23
East Los Angeles Community Roadway Improvement Construction of curb and gutter, sidewalk, curb ramps, cross gutters, drainage structures, asphalt rubber and aggregate membrane, and tire rubber modified asphalt concrete; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0016147 5/27/22 5/22/23
Floral Dr from 60 feet w/o Humphreys Av to Mednik Av The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4102002 8/18/22 8/18/23
Wilshire Boulevard, Et Al. Reconstruction of curb & gutter, sidewalk, driveways, cross gutters, and curb ramps; construction of an asphalt-rubber and aggregate membrane, concrete pavement, and drainage structures, resurfacing of existing roadway pavement with tire rubber modified asphalt concrete; traffic signal modifications; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015533 7/13/21 6/28/22
Stevenson Ranch - Stevenson Ranch Tract (Phase 2) Proposed work includes a micro-mill and application of a scrub seal to extend the life of the roadways. Curb ramps upgrades for ADA compliance. RMD2505004
Compton Boulevard, et al. - East Rancho Dominguez Resurface 2.1 miles of major roadways including parkway improvements and curb ramp upgrades. RDC0015726 4/15/22 7/14/22
East Los Angeles - Cesar E Chavez Avenue The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4102001 6/24/22 9/22/22
Ladera Heights - Centinela Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RDC0012971 3/4/22 3/4/23
Hazard Av, et al. Construction of Asphalt Rubber Hot Mix (ARHM-GG-C), AC pavement, cement stabilized pulverized base, curb and gutter, curb ramps, cross gutters, sidewalk, driveways and bus pads; and the performance of other appurtenant work. RDC0016052 3/31/22 9/6/22
East Los Angeles - Whiteside Street, et al. (Phase II) The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4108005 11/24/22 7/10/23
East Los Angeles - City Terrace Drive, et al The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4104002 11/16/22 2/24/23
Norwalk Bl, et al Reconstruct and Resurface RDC0015912 3/14/22 9/10/22
West Carson - Milton Street, et al. Reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work RMD3205003 11/3/22
Hacienda Heights - Hacienda Boulevard The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD1402001 3/31/22 3/31/23
Los Nietos - Pioneer Boulevard, et al. The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4402006 6/30/22
Hacienda Heights - Leticia Drive, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD1408001 8/26/22 12/24/22


Completed Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Old Topanga Canyon Road resurfacing of roadway pavement, installation of guardrails and the performance of other appurtenant work RDC0016306 8/26/19 1/3/20
Pine Canyon Road Cold-in-place recycled asphalt concrete, asphalt rubber hot mix; and the performance of other appurtenant work. RDC0014131 7/30/18 10/3/18
Wilmington Avenue - 200 Feet South of Victoria Street to Del Amo Boulevard Road Resurfacing and Sidewalk Reconstruction RDC0015933 2/21/20 5/8/20
Leffingwell Rd-Telegraph Rd/La Mirada Bl (ABO)(LAM) Road rehab and the performance of other appurtenant work RDC0016068 3/8/19 5/10/19
Mulholland Highway and Stokes Canyon Road, et al. Cold-in-place recycling of existing asphalt concrete pavement; resurfacing of the roadway with asphalt rubber hot mix; reconstruct/upgrade guardrails. RDC0015701 8/6/18 1/24/20
Allen Avenue, et al. Resurfacing of existing asphalt concrete pavement; construction of curb and gutter, sidewalk, curb ramps, and drainage structures; landscaping; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0016069 10/15/18 8/9/19
Ballentine Place, et al. Reconstruct and Resurface RDC0015528 6/13/18 5/22/19
Grand Avenue Roadway Rehabilitation Project (ABO)(COV) Road rehabilitation and the performance of other appurtenant work RDC0016162 8/27/18 5/31/19
Elizabeth Lake Road 2,453 feet West of Munz Ranch Road to 2,095 feet East of Bouquet Canyon Road Construction of cold-in-place recycled asphalt concrete, asphalt rubber hot mix, metal beam guard rail, terminal end sections, and drainage structures; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015244 5/22/18 11/16/18