PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Long Beach Island - Harco Street, et al. The proposed work includes pulverize and stabilize the existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB) and place a layer of rubberized hot-mix asphalt over the conventional AC on CSPB to provide a long lasting finished driving surface and upgrade of ADA curb ramps. RMD4467006 8/5/19
New York Drive - Lake Avenue/120 feet W/o Altadena Drive Reconstruction of roadway pavement, curb and gutter, driveways, sidewalk, and curb ramps; construction of a storm drain system; guardrail; modification of traffic signals; installation of striping and pavement markings; and the performance of other appurtenant work RDC0015777 1/14/19 2/21/20
Old Topanga Canyon Road resurfacing of roadway pavement, installation of guardrails and the performance of other appurtenant work RDC0016306 8/29/19 11/7/19
U.S. 101/Palo Comado Canyon Rd Interchange Improvement (ABO)(AGH) Widen existing overcrossing from 40-feet to 76-feet to accommodate one travel lane in each direction, left-turn pockets, bike lanes, shoulders; and sidewalks. In addition, a signal will be installed at the northbound off-ramp to improve safety and circulation. RDC0016341 8/31/18 7/31/20


Future Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Santa Fe Av-Artesia Bl to Del Amo Bl Resurf and Reconst RDC0014455 10/26/20 4/19/21
East Los Angeles - Whiteside Street, et al. (Phase I) The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RDC0015913 5/3/21
Hazard Av, et al. Construction of Asphalt Rubber Hot Mix (ARHM-GG-C), AC pavement, cement stabilized pulverized base, curb and gutter, curb ramps, cross gutters, sidewalk, driveways and bus pads; and the performance of other appurtenant work. RDC0016052 9/8/20 12/22/20
La Crescenta-Montrose - La Crescenta Avenue, et al. Construction of tire rubber modified asphalt concrete and cold in-place recycled asphalt concrete pavement; reconstruction of curb and gutter, sidewalk, driveways, and curb ramps on crushed miscellaneous base material; modification of traffic signals; striping and pavement markings; and the performance of other appurtenant work. RMD1567111 6/30/21
West Carson - Milton Street, et al. reconstruction of roadway pavement using cold central plant recycled asphalt concrete pavement; construction of sidewalk, driveways, curb and gutter, curb ramps, and cross gutters; installation of striping and pavement markings; and the performance of other appurtenant work RMD3205003 2/11/21
Wilmington Av - 200' S/o Victoria St to Del Amo Bl Road Resurfacing and Sidewalk Reconstruction RDC0015933 12/24/19 3/25/20
Norwalk Bl, et al Reconstruct and Resurface RDC0015912 7/12/21 1/8/22
Wilshire Boulevard, Et Al. Reconstruction of curb & gutter, sidewalk, driveways, cross gutters, and curb ramps; construction of an asphalt-rubber and aggregate membrane, concrete pavement, and drainage structures, resurfacing of existing roadway pavement with tire rubber modified asphalt concrete; traffic signal modifications; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015533 12/29/20 12/14/21
Westmont - 99th Street, et al. Cold mill AC to produce cold central plant recycled asphalt concrete pavement (CCPRACP), pulverize & stabilize remaining AC w/ underlying base material and/or soil to produce cement stabilized pulverized base (CSPB), then place layer of rubberized hot-mix asphalt over the CCPR on CSPB; reconstruct AC alleys with PCC; and parkway improvements RMD3267890 12/24/20 12/24/21
East Rancho Dominguez - Compton Bl, et al. Reconstruct 2.1 miles of major roadway including parkway improvements and curb ramp upgrades. RDC0015726 10/21/20 10/21/21
South Whittier Sunshine Acres - Leland Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4408002 3/10/21 3/10/22
Rowland Heights - Saleroso Drive, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD1408004 1/28/21 1/28/22
Altadena Dr and Washington Blvd Roadway Improvement The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD2504001 3/18/21 10/14/21
Walnut Park - Walnut Street, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD4108001 7/1/21 7/1/22
Colima Rd - City of Whittier Boundary to Fullerton Rd Median Reconst, Restriping, T/S Upgrade RDC0014911 7/28/21 1/27/23
Washington Bl, et al. Road Resurfacing RDC0016075 3/1/21 5/30/21
East Los Angeles Community Roadway Improvement Construction of curb and gutter, sidewalk, curb ramps, cross gutters, drainage structures, asphalt rubber and aggregate membrane, and tire rubber modified asphalt concrete; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0016147 8/6/21 8/1/22
Del Aire Community Road Improvements The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RMD3208003 6/30/20
Hacienda Heights Community - Garo Street, et al. Resurfacing of various roadways with asphalt rubber hot mix; rceconstruction of various roadways with asphalt rubber hot mix on cold central plant recycled asphalt concrete and cement stabilized pulverized base; reconstruction of curb and gutter, curb ramps, sidewalk, and driveways; removal, trimming, and root pruning of trees; and the performance of other appurtenant work. RDC0015702 3/15/20 9/30/20
Fullerton Road Corridor Improvements Widen Fullerton Rd from SR-60 EB ramp to Camino Bello S/o Colima Rd to add one lane in each direction. RDC0015761
Ladera Heights - 59th Street, et al. Roadway reconstruction; construction of asphalt rubber hot mix surface course, cold central plant recycled AC pavement base course, and cement-stablized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, curb ramps, and cross gutters. RDC0015844 9/3/20 2/18/21
Los Nietos - Pioneer Boulevard, et al. The proposed work includes cold-mill and overlay with a layer of asphalt rubberized asphalt concrete to preserve and provide a long lasting finished driving surface. Needed sidewalk, curb, and gutter repair as well as installation of curb ramps will also be performed. RMD4402006 6/30/22
Ladera Heights - Centinela Avenue, et al. The proposed work includes cold-mill enough existing pavement to produce cold central planted recycled pavement (CCPR); pulverize and stabilize the remaining existing pavement with the underlying base material and/or soil to produce cement stabilized pulverized base (CSPB); and place a layer of rubberized hot-mix asphalt over the CCPR on CSPB to provide a long lasting finished driving surface. RDC0012971 4/23/21 4/23/22
Canyon Country - Sierra Highway - Sand Canyon Rd to City Boundary Reconstruct a major urban RMD5504001 4/30/21 4/30/22


Completed Projects

PROJECT NAME SCOPE OF WORK PROJECT SUMMARY START DATE FINISH DATE
Ballentine Place, et al. Reconstruct and Resurface RDC0015528 6/13/18 5/22/19
Pine Canyon Road Cold-in-place recycled asphalt concrete, asphalt rubber hot mix; and the performance of other appurtenant work. RDC0014131 7/30/18 10/3/18
Firestone Boulevard - Central Avenue/Graham Avenue, et al. Resurfacing of roadway pavement; construction of an asphalt rubber and aggregate membrane interlayer; reconstruction of medians, curb and gutter, sidewalk, driveways, and curb ramps; installation of striping and pavement markings; traffic signal modifications; and the performance of other appurtenant work. RDC0014915 11/3/16 7/18/17
McDonnell Avenue, et al. Construction of asphalt rubber hot mix surface course on cold central plant recycled asphalt concrete base course, and cement-stabilized pulverized base; reconstruction of curb and gutter, sidewalk, driveways, curb ramps, alley intersections, and cross gutters; installation of striping and pavement markings; modification of traffic signals; and the performance of other appurtenant work. RDC0015818 3/20/17 10/19/17
Elizabeth Lake Road 2,453 feet West of Munz Ranch Road to 2,095 feet East of Bouquet Canyon Road Construction of cold-in-place recycled asphalt concrete, asphalt rubber hot mix, metal beam guard rail, terminal end sections, and drainage structures; installation of striping and pavement markings; and the performance of other appurtenant work. RDC0015244 5/22/18 11/16/18
Foothill Boulevard - Rosemead Boulevard to Michillinda Avenue, et al. Resurfacing of roadway pavement with tire rubber modified asphalt concrete on an asphalt concrete leveling course, construction of Portland cement curb and gutter, sidewalk and curb ramps, river rock paving, installation of striping and pavement markings, traffic signal modification and synchronization, and the performance of other incidental and appurtenant work. RDC0013674 2/22/17 10/17/17