
reports archive
This archive contains the reports and
deliverables for the I-5/Telegraph Road Corridor project.
All files are in Adobe Acrobat (.pdf) format.
Task 2 - Stakeholders and Operational
Objectives
Stakeholders' Operational Objectives and
Individual City Reports
Task 3 - Requirements Analysis
Task 4 - High Level System Design
Task 5 - Alternative Analysis
Task 6 - Recommendation
Task 7 - Conceptual Design Report
- Draft Conceptual Design Report
Task 8 - Operations and Maintenance Plan
- Operations and Maintenance Plan
Task 9 - Technical, Operational and Institutional
Issues
- Technical, Operational, and Institutional Issues Report
Task 10 - City Concurrence
- Letters/Resolutions indicating City Concurrence
- Meeting Minutes
Task 11 - Final Conceptual Design
- Final Conceptual Design Report
Task 12 - Strategic Implementation Plan
- Strategic Plan Final Report
Task 15 - Confirm Additional Streets
Task 18 - CCTV Location Analysis
Task 19 - Detection Location Analysis
|