skip to Main Content

Design Components Selection Tool

This tool can be used by community members and designers to match localized needs (categorized by the plan’s goals) to design components. Select the site size and needs to the left, and the applicable design components will be highlighted to the right.

Size

Move the slider left or right to select the size of the site.

M
Needs

Check all goals the site needs to address.

Applicable Components (Kit of Parts)
Trails and Access Gateways
  • River Gateway
  • Pedestrian Trail
  • Bike Trail
  • Equestrian Trail
  • Equestrian Facility
  • Multiuse Trail
  • Light Tower / Water Tower
  • Lookout
  • Boardwalk
  • Channel Access
  • Vehicular Access
  • Underpass and Overpass
  • Vegetated Buffer
  • Habitat Corridor
Channel Modifications
  • Terraced Bank
  • Check Dam
  • Deployable Barrier
  • Levee
  • Armored Channel
  • Storm Drain Daylighting
  • Vertical Wall
  • Reshape Low Flow
  • Channel Smoothing
  • Texturizing or Grooving
  • Concrete Bottom
  • Soft Bottom / Concrete Removal
  • Sediment Removal
  • Bridge Pier Modification
  • Access Ramp
Crossings & Platforms
  • Pedestrian Bridge
  • Bike Bridge
  • Equestrian Bridge
  • Multiuse Bridge
  • Cantilever
  • Platform
  • Habitat / Wildlife Bridge
Diversions
  • Pump
  • Diversion Pipe / Tunnel
  • Diversion Channel
  • Overflow Weir
  • Underground Gallery
  • Side Channel
  • Storm Drain Interceptor
  • Wetland
Floodplain Reclamation
  • Wetland
  • Naturalized Bank
  • Braided Channel
  • Field
  • Recreational Field
  • Surface Storage
  • Side Channel
Off-Channel Land Assets
  • Urban Agriculture
  • Solar Power
  • Composting
  • Natural Treatment System
  • Wetland
  • Recreation Field
  • Surface Storage
  • Subsurface Storage
  • Injection Well
  • Water Treatment Facility
  • Purple Pipe Connection
  • Dry Well
  • Spreading Ground
  • Storm Drain Daylighting
  • Affordable Housing
  • Art and Culture Facility
Back To Top